Text
._
.
.
DCB/Dtd
,
,
.
JUL 021993
Docket No. 50-483
,
Union Electric Company
ATTN: Mr. Donald F. Schnell
Senior Vice President - Nuclear
Post Office Box 149 - Mail Code 400
i
St. Louis, MO 63166
!
Dear Mr. Schnell:
SUBJECT:
ROUTINE RADIATION PROTECTION INSPECTION AT CALLAWAY NUCLEAR POWER
STATION
This refers to the routine safety inspection conducted by Mr. D. W. Nelson of
this office on June 7-8 and 10-11, 1993. This inspection included a review of
activities authorized for your Callaway Nuclear Power Station. At the
conclusion of the inspection, tne findings were discussed with those members
of your staff identified in the enclosed report.
t
Areas examined during this inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation. The violation is of concern because an employee willfully violated
two of your station procedures.
Even though the violation had only minor
i
safety significance and the corrective actions taken appeared to be have been
adequate, the willfulness of the violations precludes us from exercising
Although 10 CFR 2.201 requires you to submit to this office, within 20 days of
your receipt of this Notice, a written statement of explanation, we note that
this violation had been corrected and those actions were reviewed during this
inspection. Therefore, no response with respect to this matter is required
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
,
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
!
!
,
4
$
i
9307130116 930702
ADOCK 05000483
i
O
g
i
D O(,
j
. .
,
JUL 021993
Union Electric Company
2
- {
t
We will gladly discuss any questions you have concerning this inspection.
f
Sincerely,
Original Signed By
t
Bruce L. Jorgensen
Bruce L. Jorgensen, Acting Chief
f
Reactor Support Programs Branch
Enclosure:
Inspection Report
i
No. 50-483/93008(DRSS)
cc w/ enclosure:
.
!
~
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
.
Assurance
?
S. E. Sampson , Supervising
Engineer , Site Licensing
s
OC/LFDCB
'
Resident Inspector, RIII'
!
Region IV
_
.
Resident Inspector, Wolf Creek
l
K. Drey
,
C.' John Renken, Engineer.
!
Policy & Federal Dept.
'
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
Chairman, Illinois Commerce Commission
bcc w/ enclosure: