Application for Amends to Licenses NPF-8 & NPF-2 Requesting Changes to TS 3/4.8.1 Electrical Power Sys AC Sources, to Reflect Plant Mods to Be Implemented in Response to Station Blackout Rule (10CFR50.63)
ML20045F422
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/29/1993
From: Woodward J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045F423 List:
References
NUDOCS 9307070293
Download: ML20045F422 (2)


Text

. wrem nuoer opeeg cc n ,

rw o"cenatra firfreof m /it' rr 3 3 rg ,-); j g,r le Moo 2% era 500 n

Southem Nudear Oper ing Company

,, <m , mn June 29,1993 Docket Nos. 50-348 10 CFR 50.90 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Joseph M. Earley Nuclear Plant Electrical Power System Technical Specification Change In Rejiponse to the Station Blackout Rule Gentlemen:

By letter dated March 4,1993, Southern Nuclear Operating Company (SNC) requested changes to the Farley Nuclear Plant (FNP) Units 1 and 2 Technical Specification 3/4.8.1, " Electrical Power System AC Sources," to reflect the plant modifications to be implemented in response to the station blackout rule (10 CFR 50.63). Specifically, references to diesel generator 2C as an onsite emergency AC electrical power source were removed from the technical specification since it will become the designated alternate AC (AAC) source.

A meeting was held with the NRC Staff on June 2, 1993, to discuss SNC's request to remove the requirements associated with diesel generator 2C from the technical specification. Following this meeting the NRC requested assurance that diesel generator 2C will be maintained in a manner to ensure continued reliability and availability. Therefore, SNC proposes to include the following in the Administrative Controls Section 6 of the FNP Technical Specifications: 1) a reference to a document which defines the testing, maintenance, and procurement requirements necessary to ensure that diesel generator 2C will continue to be a Class lE component, and 2) a requirement to inform the NRC if diesel generator 2C is out of service for more than 10 days.

In addition, SNC reconfirms its policy not to intentionally remove two diesel generators from service at the same time.

Attached are the revised technical specification pages for Units 1 and 2. SNC has reviewed the 10 CFR 50.92 evaluation prepared in support of the March 4, 1993, submittal and has determined that the analysis is unaffected by these revisions and that no significant hazards consideration is involved. In addition, the environmental impact evaluation provided with the previous submittal is also unaffected.

9307070293 930629

~

%(Q \V

) t PDR ADDCK 05000348 "

\

P PDR w

U. S. Nuclear Regulatory Commission Page 2 l

The Plant Operations Review Committee has reviewed and approved these proposed i changes, and the Nuclear Operations Review Board will review these proposed  ;

changes at a future meeting.

l Approval of these proposed changes is requested by September 1, 1993, prior to .;

the Unit 2 ninth refueling outage during which the-required station blackout '

modifications for Unit 2 will be implemented. .The modifications planned for this outage will remove the safety start signal to diesel generator 2C for  ;

both Units 1 and 2;-therefore, approval must be received prior to the start of. ,

this effort in order to avoid an unnecessary technical specification required shutdown of Unit 1.  ;

A copy of these proposed changes has been sent to Dr D. E. Williamson, the .i Alabama State Designee, in accordance with 10 CFR 50.91(b)(1). '

Respectfully submitted, i l

SOUTHERN NUCLEAR OPERATING COMPANY i i

xecu\iveVicePresident i BHW\ cit:SBOTSNRC.BHW Attachment SWORN TO AND SUBSCRIBED BEFORE ME cc: Mr. S. D. Ebneter THISSf4)AYOF uf e , 1993. l Mr. T. A. Reed i Mr. G. F. Maxwell Dr. D. E. Williamson