EPID:L-2019-LLA-0194, COL Docs - Vogtle Units 3 and 4, SNC Presentation for 9/10 Public Meeting 52.103(g) Process (Approved, Closed) |
|
MONTHYEARML19249D6512019-09-0606 September 2019 COL Docs - Vogtle Units 3 and 4, SNC Presentation for 9/10 Public Meeting 52.103(g) Process Project stage: Request ML19346F1222019-12-12012 December 2019 Audit Plan, Vogtle Electric Generating Plant Units 3 and 4, LAR-19-017, Request for License Amendment: Removal of the PRHR-HX Natural Circulation Test, (Public) Project stage: Other ML20020A0092020-01-31031 January 2020 WCAP-18461-NP, Rev. 0, Common Q Platform and Component Interface Module System Elimination of Technical Specification Surveillance Requirements Project stage: Other ND-20-0092, Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1)2020-01-31031 January 2020 Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1) Project stage: Request ML20072L5592020-03-17017 March 2020 Transmittal Memorandum for Vogtle Electric Generating Plant Units 3 and 4 Audit Summary for LAR 19-017: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test Project stage: Approval ML20063L4822020-03-19019 March 2020 LAR 19-017 Safety Evaluation Vogtle Units 3 and 4, Amendments 177 and 176, Removal of PRHR-HX Nat.Circ.Test Project stage: Approval ML20045F1072020-03-19019 March 2020 Attachment - Vogtle Electric Generating Plant Unit 3, Amendment No. 177 (LAR 19-017) Project stage: Approval ML20045F1292020-03-19019 March 2020 Attachment - Vogtle Electric Generating Plant Unit 4, Amendment No. 176 (LAR 19-017) Project stage: Approval ML20045F0702020-03-19019 March 2020 Exemption - Vogtle Electric Generating Plant Unit 4 (LAR 19-017) Project stage: Approval ML20045F1242020-03-19019 March 2020 Amendment No. 176 - Vogtle Electric Generating Plant Unit 4 (LAR 19-017) Project stage: Approval ML20080L9272020-03-20020 March 2020 Audit Summary for LAR 19-017, Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (Public) Project stage: Approval 2020-01-31
[Table View] |
|
---|
Category:License-Combined License (COL) (New/Renewal/Amendments) DKT 52
MONTHYEARML23243B0542023-12-19019 December 2023 VEGP Unit 4 Amendment No. 193 - Enclosure 2 ML23243A9682023-12-19019 December 2023 VEGP Unit 3 Amendment No. 197 - Enclosure 1 ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action ML23159A0972023-07-31031 July 2023 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 23-001) ML23072A2722023-05-0101 May 2023 Enclosure 1 - LAR 22-005 Amendment No. 191 Vogtle Unit 3 ML23072A2732023-05-0101 May 2023 Enclosure 2 - LAR 22-005 Amendment No. 188 Vogtle, Unit 4 ML23072A2762023-05-0101 May 2023 Attachment to Enclosure 2 - VEGP U4 Amendment 188 LAR-22-005 ML23037A0892023-02-0808 February 2023 Amendment - Vogtle Unit 3 Amendment No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML20290A2822022-08-0303 August 2022 Finding That Acceptance Criteria in the Combined License Are Met (10 CFR 103g - Finding) ML21237A2342021-10-15015 October 2021 Amendment Unit 3 - Vogtle Electric Generating Plant LAR 21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2352021-10-15015 October 2021 Attachment Unit 3 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2372021-10-15015 October 2021 Attachment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2362021-10-15015 October 2021 Amendment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21217A0242021-09-17017 September 2021 Amendment No. 187 - Vogtle Electric Generating Plant Unit 3 ML21217A0252021-09-17017 September 2021 Amendment No. 185 - Vogtle Electric Generating Plant Unit 4 ML21217A0272021-09-17017 September 2021 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment No. 185 ML21217A0262021-09-17017 September 2021 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment No. 187 ML20314A0102020-12-0707 December 2020 License Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-005) ML20314A0112020-12-0707 December 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 186 (LAR-20-005) ML20314A0142020-12-0707 December 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 184 (LAR-20-005) ML20314A0132020-12-0707 December 2020 License Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 20-005) ML20247J4592020-10-14014 October 2020 Amendment 185 - Vogtle Electric Generating Plant Unit 3 (LAR 20-004) ML20247J4612020-10-14014 October 2020 Amendment 183 - Vogtle Electric Generating Plant Unit 4 (LAR 20-004) ML20237F4912020-09-24024 September 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-003) ML20237F4922020-09-24024 September 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 184 (LAR-20-003) ML20237F4932020-09-24024 September 2020 Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 20-003) ML20237F4942020-09-24024 September 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 182 (LAR-20-003) ML20196L6792020-08-11011 August 2020 Attachment - Vogtle Electric Generating Plant Unit 4 for Amendment 181 for LAR-20-002 ML20196L6772020-08-11011 August 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 183 for LAR-20-002 ML20196L6782020-08-11011 August 2020 Amendment 181 - Vogtle Electric Generating Plant Unit 4 for LAR 20-002 ML20132A0762020-08-0404 August 2020 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR 20-001) ML20106F1632020-05-12012 May 2020 Attachment to Amendment 180 - LAR-19-010: Auxiliary Building Room Heatup ML20106F1622020-05-12012 May 2020 Attachment to Amendment 181 - LAR-19-010: Auxiliary Building Room Heatup ML20059N7792020-05-12012 May 2020 Amendment 181 - LAR-19-010: Auxiliary Building Room Heatup ML20059N7822020-05-12012 May 2020 Amendment 180 - LAR-19-010: Auxiliary Building Room Heatup ML20120A0072020-04-30030 April 2020 Attachment for Amendment 178 Cyber Security Plan Changes (LAR-19-020) ML20106F1592020-04-30030 April 2020 Attachment for Amendment 179 Cyber Security Plan Changes (LAR-19-020) ML20057E1062020-04-30030 April 2020 Amendment 179 - Issuance of Amendments for Cyber Security Plan Changes (LAR-19-020) ML20057E1172020-04-30030 April 2020 Amendment 178 - Issuance of Amendments for Cyber Security Plan Changes (LAR-19-020) ML20050L4662020-04-23023 April 2020 Amendment 177 - Unit 3 (LAR 19-014) ML20050M0632020-04-23023 April 2020 Attachment (LAR 19-014) ML20064E5722020-03-23023 March 2020 Supplemental Attachment to License Amendment No. 36 for COL No. NPF-92 ML20064E6122020-03-23023 March 2020 Enclosure 2: Supplemental Attachment to License Amendment No. 125 for COL No. NPF-91 ML20064E6282020-03-23023 March 2020 Enclosure 3: Supplemental Attachment to License Amendment No. 124 for COL No. NPF-92 ML20064E6682020-03-23023 March 2020 Enclosure 4: Supplemental Attachment to License Amendment No. 148 for COL No. NPF-91 ML20064E6802020-03-23023 March 2020 Enclosure 5: Supplemental Attachment to License Amendment No. 147 for COL No. NPF-92 ML20045F1242020-03-19019 March 2020 Amendment No. 176 - Vogtle Electric Generating Plant Unit 4 (LAR 19-017) ML20045F1292020-03-19019 March 2020 Attachment - Vogtle Electric Generating Plant Unit 4, Amendment No. 176 (LAR 19-017) 2023-07-31
[Table view] |
Text
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO.52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 176 License No. NPF-92
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern Nuclear Operating Company (SNC),
dated September 6, 2019, as supplemented by letter dated January 31, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the licensees application dated September 6, 2019, as supplemented by letter dated January 31, 2020. The license is also amended by changes to Appendix C of the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-92 is hereby amended to read as follows:
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 176, are hereby incorporated into this license.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. SNC shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).
FOR THE NUCLEAR REGULATORY COMMISSION:
/RA/
Victor E. Hall, Chief Voglte Project Office Office of Nuclear Reactor Regulation Date of Issuance: March 19, 2020 Attachment(s):
Page 7 of the facility Combined License and affected pages of Appendix C of the facility Combined License