_,
..
..
~
.
'
..
..
,
,,
JUN I 81993
Docket Nos. 50-325, 50-324
Carolina Power and Light Company
ATTN: Mr. R. A. Anderson
Vice President
Brunswick Steam Electric Plcnt
P. O. Box 10429
i
Southport, NC 28461
I
Gentlemen:
'1
SUBJECT: NOTICE OF VIOLATION AND NOTICE OF DEVIATION-
(NRC INSPECTION REPORT NO. 50-325/93-25 AND 50-324/93-25)
This refers to the inspection conducted by J. J. Lenahan of this office'on
May 17-21, 1993. The inspection included a review of activities-authorized
for your Brunswick facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report. _ Within.
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice'of
Violation (Notice), and other activities appeared to deviate from commitments
to the NRC, as specified in the enclosed Notice of Deviation. We are con-
cerned about the violation because your Nuclear Engineering Department-(NED)
Staff failed to perform self assessments which should have identified the
document control problems within NED. The additional problems identified by
the Nuclear Assessment Department during their April 26-30, 1993, assessment
of NED are also of concern to NRC. This assessment was not performed until
after NRC identified the document control problems in NED.
The deviation is of concern because of your failure to implement corrective
actions to resolve an LER in accordance with your commitments to NRC.
You are required-to-respond to-this-letter and should- f ollow the -instructions
specified.in the enclosed Notice when preparing your response.
In your
L
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
. I {# '
9307020201 930618
F
'
ADOCK 05000324-
O
.
.
^
b
- ,..
..
. . _,
I
a
.
JUN I 8 1993
' Carolina Power & Light Co.
2
In accordance with 10 CFR'2.790 of the NRC's " Rules of Practice," a copy of
l
this letter and its enclosures will be placed in.the NRC Public Document Room.
i
The responses directed by'this letter and the enclosed Notice.are not subject
to the clearance procedures of the Office of Management and Budget as required
'
l
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
-
l-
Original signed by
J.
P. Jaudon/for
Albert F. Gibson, Director
H
Division of Reactor Safety
Enclosures:
1.
NRC Inspection Report
2.
Notice of. Violation
i
3.
Notice of Deviation
i
cc w/encls:
Mr. H. W. Habermeyer, Jr.
'
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. O. Box 1551 - Mail OHS 7
Raleigh, NC 27602
J. M. Brown
Plant Manager Unit 1
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
a
C. C. Warren
Plant Manager Unit 2
Brunswick Steam Electric Plant
'-
P. O. Box 10429
Southport, NC 28461-
Mr. Mark S. Calvert
Associate General' Counsel
Brunswick Steam Electric Plant
P. O. Box 10429
L
Southport, NC 28461
l
(cc w/encls cont'd - See page 3)
l
l'
.
..
-
. . - . .
.-
.1
.-
.,
!
Carolina Power & Light Co.
3
331 l g 9993
1
-.
(cc w/encls cont'd)
~
Kelly Holden
Board of Commissioners
i
P.-0. Box 249
+
Bolivia, NC 28422
Dayne H. Brown, Director
i
Division of Radiation Protection
.
N. C. Department of Environment,
j
Health & Natural Resources
,
P. O. Box 27687
Raleigh, NC 27611-7687
H. A. Cole
Special Deputy Attorney General
.
State of North Carolina
1
P. O. Box 629
i
Raleigh, NC 27602
,
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. O. Box 29520
Raleigh, NC 27626-0520
l
Ms. Gayle B. Nichols
!
Staff Counsel
e
SC Public Service Commission
P. O. Box 11649
Columbia, SC 29211
'bec w/encls:
Document Control Desk
-
H. Christensen, RII
S. Vias, RII
P. Milano, NRR
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Star Route 1, Box 208
Southport, NC 2B461
FILE NAME: S:\\DRS\\EB\\BRU93-25.JL
,
S
/
R.
R
RII:D P
RII
S/
x
&
<
66/f/93J/aban/}fi[)f
N J
ke
HCh stensen
CJuli
/,,
4 Ip/93
06/t/93
06/
93
-4
i
~
, , , . . . -