ML20045E507

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/93-07 on 930607-11.No Violations Noted
ML20045E507
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/28/1993
From: Mccormickbarge
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20045E508 List:
References
NUDOCS 9307020156
Download: ML20045E507 (2)


See also: IR 05000483/1993007

Text

,

~tcD;

.

JUN 2 81933

4

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Senior Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166-

Dear Mr. Schnell:

SUBJECT:

EMERGENCY PREPAREDNESS INSPECTION AT THE CALLAWAY PLANT'

This refers to the routine safety inspection conducted.by Mr. T. Ploski of

this office and others on June 7-11, 1993. The inspection included a review

of authorized activities at your Callaway facility. At the conclusion of the-

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified.in the report. Within

these areas,'the inspection consisted of a selective examination of procedures

and representative records, interviews, and observation'of activities in.

progress.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will .be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed By Tom Ploski for

J. W. McCormick-Barger, Chief

Emergency Preparedness and

Non-Power Reactor Section

Enclosure:

Inspection Report

No. 50-483/93007(DRSS)-

See Attached Distribution

RIII

RII

RIII

RII

RIII

]

,

W

/,

F

W

i

Ploski/dg

/ Nelson

M rk ey

cki

rMcCormick-Barger

1

.

06/2fl93

ff

/ bhk

f /G3

yi=5

9307020156-

%B3

i

-

PDR

ADOCK-

PDR

i

G

h

]

'

.

. .

. -

- -

-

-

4

0

"

"l

l

l

L'

o-

l

s

L

Union Electric' Company

2

jgN 2 S .1393

r

!

Distribution _

q.;

cc.w/ enclosure:

G. L. Randolph, Vice-President,

'

Nuclear Operations

'

J. V. Laux, Manager Quality

Assurance

,

S. E. Sampson, Supervising

Engineer, Site Licensing

,

OC/LFDCB

1

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

i

C. John Renken, Engineer

Policy & Federal Dept.

Gerald Charnoff, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources

Chairman, Illinois Commerce

i

Commission

R. Bissell, FEMA, Region VII

,

bcc w/ enclosure:

PUBLIC

,

I

i

n

J

e

6

f

[

,

--