-JUN 4 SIG
hp
.
Docket-No.: 50-416
License No. NPF-29-
Entergy Operations, Inc.
1
ATTN: Mr. C. R. Hutchinson
Vice President
Nuclear Operations
P.O. Box 756
Port Gibson, MS 39150
,
Gentlemen:
SUBJECT: NF'C .WPFCTION REPORT N0. 50-416/93-07
This refers to the inspection conducted : by R. Bernhard of 'this -office on
April 18, 1993, throuoh May 15, 1993.
The inspection included aJreview of
activities authnrized for your Grand Gulf' facility.
At the conclusion of the-
inspection, the findings were discussed with those; members . of your- staff
identified in the enclosed report.
'
'
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and-
representative records, interviews with personnel, and observation of activities :
in progress.
The enclosed Inspection Report identifies activities that violated ,NRC.-
,
requirements that will not be subject to _ enforcement - action' because; of your
efforts in identifying and/or correcting the violation meet the criteria
specified in Section VII.B of the Enforcement Policy. One of these is of concern;
because it involves mispositioned valves in the Residual Heat Removal. System.
This appears to be an example of a lack of adequate attention while executing
i
frequently performed activities.
.
In accordance with 10 CFR 2.790_of the NRC's " Rules of Practice," a copy of this
letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
,
,
Sincerely,
'
ORIGNAL SIGNED OY L
DAVID. to. VERRELLI
l
'
'*
David M. Verrelli, Chief
Reactor Projects Branch 1
i
Division of Reactor Projects
!
'
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
9307020144 930604
I
i
!
?"
^" " ** n r
gg67
}
-
..
.
..
-
. .
.
.
.
._
.
-
+
.
.
JUN - 4 'l993 -
Entergy Operations, Inc.
2.
cc w/ encl:
General Manager
,
Grand. Gulf Nuclear Station
Entergy Operations, Inc.
-
P.O. Box 756
Port Gibson, MS 39150
H. J. Meisner, Director
Nuclear Safety and
Regulatory Affairs
Entergy Operations, Inc.
P.-0. Box 756
,
Port Gibson, MS 39150
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
-
State of Mississippi
-
P. O. Box 22947
Jackson, MS~ 39225
G. W. Muench
Vice President, Operations Support
Entergy Operations, Inc.
'
P. O. Box 31995
Jackson, MS 39286-1995
Donald C. Hintz, Executive Vice
President & Chief Operating Officer
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
R. B. McGehee, Esq.
Wise, Carter, Child, Steen
and Caraway
P. O. Box 651
Jackson, MS 39205
N. S. Reynolds, Esq.
.
Winston & Strawn
1400 L Street, NW,12th Floor
Washington, D. C.
20005-3502
Alton B. Cobb,-M.D.
State Health Officer
State Board of Health
P. O. Box 1700
Jackson, MS 39205
(cc w/ encl cont'd - See page 3)
.
.-
-
-
i
..-
JUN - 4 1993
Entergy Operations, Inc.
3
(cc w/ encl cont'd)
The Honorable William J. Guste, Jr.
Attorney General
Department of Justice
State of Louisiana
P. O. Box 94005
Baton Rouge, LA 70804-9005
-
'
Office of the Governor
State of Mississippi
Jackson, MS 39201
'
Jack McMillan, Director
Division of Solid Waste Management
Mississippi Department of
Natural Resources
P. O. Box 10385
Jackson, MS 39209
'
President
Claiborne County Board
of Supervisors
Port Gibson, MS 39150
o
K. G. Hess
Vice President
.
Bechtel Power Corptration
4
P. O. Box 2166
Houston, TX 77252-2166
S. S. Chan
Project Engineer
Bechtel Power Corporation
P. O. Box 2166
Houston, TX 77252-2166
bec w/ encl:
,
P. O'Connor, NRR
F. Cantrell, RII
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box-399
Port Gibson, MS 39150
RII:DRP
RII:DRP
RII:DRP
TVJ
d4/7ptL
FCa[%
-
RWright:tj
RBernhard
trell
06/y/93
06/y/93
06/p/93