ML20045E367

From kanterella
Jump to navigation Jump to search
Responds to Invoice Re Region II Inspection Fees for CR-3. Requests Itemized Rept for 322.5 Hours Charged for Insp Rept 92-018
ML20045E367
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/22/1993
From: Ken Wilson
FLORIDA POWER CORP.
To:
NRC OFFICE OF THE CONTROLLER
References
NL93-0046, NL93-46, NUDOCS 9307020059
Download: ML20045E367 (1)


Text

E:

HM c.

e e

Florida Power CORPORATION U L Tsl June 22, 1993 NL93-0046 U. S. Nuclear Regulatory Commission Attention:

License Fee and Debt Collection Branch Office of the Controller Washington, DC 20555-0001

Subject:

Facility Inspection Invoice

Reference:

Invoice No.: SM0411-93 dated 06/01/93

Dear Sir:

Florida Power Corporation (FPC) received subject invoice regarding Region II inspection fees for Crystal River Unit 3 (CR-3). Review of the invoice indicated that charges for Inspection Report Number 92-018 appear to be excessive and above the normal charges for such an inspection.

Inspection 92-018 was conducted by Mr. R. Schin and other NRC personnel on July 12 - August 22, 1992. However, specific charges for weeks included during this time frame were billed as separate inspections, e.g.,92-015, 92-020 and 92-022.

Please provide a detailed report itemizing the 322.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> charged for Inspection 92-018. FPC will submit the total invoice amount on July 1,1993. However, if it is concluded that an error in billing did occur, FPC's account should be adjusted appropriately.

Sincerely, j(k Wh K. R. Wilson, Manager Nuclear Licensing JBC:ff Q100G7 Ok 9

CRYSTAL RNER NUCLEAR.". ANT: Powerline Road + P.O. Box 219

  • Crystal River, Florida 34423-0219. (904) 795-6486 g

A Florida Progress Company 9307020059 930622 PDR ADDCK 05000302 L

G PDR