ML20045E367
| ML20045E367 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/22/1993 |
| From: | Ken Wilson FLORIDA POWER CORP. |
| To: | NRC OFFICE OF THE CONTROLLER |
| References | |
| NL93-0046, NL93-46, NUDOCS 9307020059 | |
| Download: ML20045E367 (1) | |
Text
E:
HM c.
e e
Florida Power CORPORATION U L Tsl June 22, 1993 NL93-0046 U. S. Nuclear Regulatory Commission Attention:
License Fee and Debt Collection Branch Office of the Controller Washington, DC 20555-0001
Subject:
Facility Inspection Invoice
Reference:
Invoice No.: SM0411-93 dated 06/01/93
Dear Sir:
Florida Power Corporation (FPC) received subject invoice regarding Region II inspection fees for Crystal River Unit 3 (CR-3). Review of the invoice indicated that charges for Inspection Report Number 92-018 appear to be excessive and above the normal charges for such an inspection.
Inspection 92-018 was conducted by Mr. R. Schin and other NRC personnel on July 12 - August 22, 1992. However, specific charges for weeks included during this time frame were billed as separate inspections, e.g.,92-015, 92-020 and 92-022.
Please provide a detailed report itemizing the 322.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> charged for Inspection 92-018. FPC will submit the total invoice amount on July 1,1993. However, if it is concluded that an error in billing did occur, FPC's account should be adjusted appropriately.
Sincerely, j(k Wh K. R. Wilson, Manager Nuclear Licensing JBC:ff Q100G7 Ok 9
CRYSTAL RNER NUCLEAR.". ANT: Powerline Road + P.O. Box 219
- Crystal River, Florida 34423-0219. (904) 795-6486 g
A Florida Progress Company 9307020059 930622 PDR ADDCK 05000302 L
G PDR