ML20045E162

From kanterella
Jump to navigation Jump to search
Requests Appropriate Changes to Hematite Fundamental Nuclear Matl Control Plan within 60 Days
ML20045E162
Person / Time
Site: 07000036
Issue date: 06/23/1993
From: Milstein R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rode J
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 9307010198
Download: ML20045E162 (1)


Text

.

H JUN 2 31993 Docket.70-36' License SNM-33 f

Mr. James A. Rode Plant Manager Combustion Engineering Inc.

P.O. Box.107, Highway P Hematite, MO 63047

Dear Mr. Rode:

~

SUBJECT:

REQUEST FOR CHANGES TO CE HEMATITE FNMC PLAN During the past 2 years, Material Control and Accounting (MC&A) inspections conducted by the Nuclear Regulatory Commission at your Hematite facility have noted, as Inspector Follow-up Items, several inconsistencies within your MC&A program.

In particular, I refer to Inspector Follow-up Item Nos. 93-201-04, 92-202-04, 92-202-05, and 92-201-02. The recent-changes.to your Fundamental Nuclear Material Control (FNMC) Plan,-which were approved on May 21, 1993, have addressed the first and third items.

However,.the-remaining two items have not yet been addressed by proposed changes to the FNMC Plan.

In order to reach closure on these items, we are requesting that

.i you submit appropriate changes to the FNMC Plan within 60 days.

Sincerely, vfqpaal Sig 4 Richard F11 stein Licensing Section 2

-Licensing Branch-Division of F_uel Cycle Safety'and Safeguards, NMSS Distribution Docket *70-36

'PDR/LPDR NCR' File" Center " Region II NMSS r/f FCSS r/f FCLB r/f

-Madams

-JGreeves ETenEyck 0FC FCLB C

FClk C/

FCLB C

'FCLB[

Y NAME hRMilstein Nrpe-MTokaM

'CENiYh

~

DATE-6/22/93 6/ 9/93 6/79/93 6/2f/93 C = COVER E = COVER & ENCLOSURE N = NO COPY G:\\HEMAINSP g ogo d M 6

% k hhh V

3) Fbi c

rc

..,