ML20045D305
| ML20045D305 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/20/1993 |
| From: | Passwater A UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-2751, NUDOCS 9306280199 | |
| Download: ML20045D305 (2) | |
Text
-
...~.
.h i
UNION
>;.. '. ' '"'"- ' t Etecriac January 20, 1993 U.S. Nuclear Regulatory Commission-ATTN:
Document Control Desk Mail.Stop P1-137 Washington, D.C.
20555 Gentlemen:
ULNRC-2751
-i l
DOCKET-NUMBER 50-483 CALLAWAY PLANT l
AMENDMENT NUMBER 76_
j 1
This is to inform the Commission'of the implementation of Amendment No. 76 to the Callaway Facility Operating License No.-NPF-30.
Amendment-No. 76 approved a Technical Specification changefto Section 4.4.9.1.2, Figures ~3.4-2, 3.4-3, and 3.4-4,; Tables 4.4-5 and B 3/4.4-1 for the Reactor Coolant System Pressure / Temperature Limits by modifying _ plant-heatup and.
cooldown curves and the maximum allowable ~PORV setpoint-for cold overpressure protection.
The changes have been issued to all controlled Technical Specification holders and became effective on January 15, 1993.
j i
Very truly,yours, i
l h.. '. A A.
C.
Passwater WEK/kea l0OY 1
230029 L To 930628 h
cc:
T. A.
Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N.
Street, N.W.
Washington, D.C.
20037 Dr. J.
O.
Cermak CFA, Inc.
18225-A Flower Hill Way Gaithersburg, MD 20879-5334 L. Robert Greger Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Bartlett Callaway Resident Office U.S. Nuclear Regulatory Commission RR$1 Steedman, Missouri 65077
-4 L. R. Wharton (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission P.O.
Box 360 Jefferson City, MO 65102 Ron Kucera Department of Natural Resources P.O.
Box 176 Jefferson City, MO 65102 l
t l
I
'.