ML20045D092

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Diablo Canyon,Units 1 & 2 & Annual Breakwater Settlement Survey for 1993
ML20045D092
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/15/1993
From: Townsend J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045D093 List:
References
NUDOCS 9306250318
Download: ML20045D092 (1)


Text

-.

.l Pacific Gas and Electric Company Diablo Canyon Power Plant

' John D Townsend -

3 P0. Box 56,

%ce President-Drablo Canyon.

Avila Beach. CA 93424.

Operabons and Plant Manager i

805/545-6000

-l i

June 15,1993 1

U.S. NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555

)

RE:

Docket No. 50-275 and 50-323.

License No. DPR-80 and DPR-82 l

Monthly Operating Report for.May 1993'

'J q

GENTLEMEN:

j Enclosed are the monthly operating report forms for Diablo Canyon Units.1 and 2 for.

May 1993. This report is submitted in accordance with Section 6.9.1.7 of the Units?

I and 2 Technical Specifications. -In accordance with section 4.7.13.3 of the' Units 1 and 2 Technical Specifications, the annual Breakwater Settlement Survey _ for 1993 is included in this report.

l 9

Sincerely,

.i i

,D M l

JDT:pgd j

i Enb osures i

i Mr. Bobby.H. Paulkenberry, Regional: Administrator.

cc U.S. Nuclear Regulatory Commission Region _V 1450 Maria Lane, Suite 210 9

Walnut Creek, CA 494596-5268 -

I Ms. Liz Hannon, President Utility Data Institute, Inc.-

1700 K Street, NW, Suite 400J Washington, DC 20006 9306250318 930531

~

DR.ADOCK 0500 5

7.

._