Text
'
BJ V NIAGARA HUMOHAWK NIAGARA MOHAWK POWER CoR7 ORATION /N!NE MILE POINT, P O. BOX 63. LYCOMING. NY 13093/TEL EPHONE (315) 349 2882 B. Ralph Sylvia
[
Executive Vice President Nuclear I
June 18,1993 NMP2L 1393 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 TAC No. M85937 Gentlemen:
Niagara Mohawk Power Corporation transmitted an Application for Amendment to Nine Mile Point Unit 2 Operating License NPF-69 on February 27,1993 (NMP2L 1370). The Application for Amendment contained proposed changes to the Technical Specifications set forth in Appendix A of the above mentioned license, specifically Definition 1.9, " Critical Power Ratio," and Section 3/4.3.6, " Control Rod Block Instrumentation". Bases changes to Sections B2.1 and B3/4.2 were also included. Based on conversations with the Nuclear Regulatory Commission Staff, the proposed changes to Section 3/4.3.6, specifically Table j
3.3.6-2, " Control Rod Block Instrumentation Setpoints," are hereby withdrawn.
)
l The setpoint and allowable value for the Recirculation Flow Upscale Rod Block contained in j
Table 3.3.6-2, " Control Rod Block Instrumentation Set 1*oints," were proposed for revision to facilitate operation at up to 105% rated core flow. The proposed changes would have increased the trip setpoint and allowable values from 108% to 111% and from 111% to 114% of rated core flow, respectively. As stated in the Application for Amendment, the flow unit upscale trip performs no safety function and no design basis transient or accident analysis takes credit for it. That is, there is no safety basis for the setpoint. This conclusion is supported by NUREG 1433, " Improved Standard Technical Specifications," wherein the rod block functions associated with recirculation flow were removed from the Standard Technical Specifications.
In several conversations, the Staff expressed concern regarding the lack of an analytical basis l
for the proposed change to the Recirculation Flow Upscale Rod Block Setpoint. Niagara Mohawk understands the Commission's concern and, after due consideration, has decided to l
9306250180 930618 B
ki I
PDR.ADOCK 05000410 d
P PDR
]
\\
N
-si
ll.
j 1
o, U. S. N6 clear Regulatory Commission Page 2 withdraw that portion of the application dealing with the Recirculation Flow Upscale Rod Block setpoint. The Commission's Project Manager stated that providing instructions directing the Staff to remove portions of the amendment application would be more efficient than submitting a revised application. Therefore, please remove Technical Specification Page 3/4 3-63 from Attachment A of the Application for Amendment and disregard those portions of the discussion in Attachment B dealing with the recirculation flow upscale rod block and increased core flow. Niagara Mohawk will evaluate the necessity of retaining the recirculation flow rod blocks in the Technical Specifications and may propose removal of the rod blocks in a future amendment application.
Very truly yours, B. Ralph S via Executive Vice President - Nuclear
/sek 003850LL Enclosure l
xc:
Mr. T. T. Martin, Regional Administrator, Region I l
Mr. W. L. Schmidt, Senior Resident Inspector Mr. R. A. Capra, Director, Project Directorate I-1, NRR Mr. J. E. Menning, Project Manager, NRR Ms. Donna Ross l
Division of Policy Analysis New York State Energy Office Agency Building 2 Empire State Plaza Albany, NY 12223 Records Management
+
UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
NIAGARA MOIIAWK POWER CORPORATION
)
Docket No. 50-410
)
Nine Mile Point Nuclear Station No. 2
)
l B. Ralph Sylvia, being duly sworn, states that he is Executive Vice President - Nuclear of Niagara Mohawk Power Corporation; that he is authorized on the part of said Corix> ration to sign l
and file with the Nuclear Regulatory Commission the document attached hereto; and that the document is true and correct to the best of his knowledge, information, and belief.
By:
at B. Ra$h Sylyta Executive Vice President - Nuclear l
Subscribed and Sworn to before me, a Notary Public in and for t State of New York and the County of 4hcw
,this
/ '7 day of -
,1993.
)
0 l
l N
M f
Noti Public inf and for l
ewcq County, New York l
/
l l
l My Commission Expires:
i f0 VY BEVERLY W. RIPKA Notary Public Stateof Now York Qualin Oswego Co. No. 4644B79p g My Commission Exp. m
...