Text
SAFEGJAEDONF0MATION
1
UNITED STATES .
-
I
. [,A ntag%
NUCLEAR REGULATORY COMMISSION'-
4
REGloN 11
p+-
i:
g
101 MARIETTA STREET. N.W., SUITE 2900
%
y
ATLANTA, GEORGIA 30323-0199 -
%, ....../
Report Nos.
50-259/93-22,50-260/93-22,and50-296/93-22
Licensee: Tennessee Valley Authority
3B Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
.
Docket Nos.
50-259, 50-260 and 50-296
and DPR-68
Facility Name:
Browns Ferry 1, 2, and 3
Inspection C ductf: May 24,-28, 1993
Inspector: 66 d//~N/
f/f/
h /M
h
A.cTillman(SjfWguardsIns~psc~ tor
Dhte Sighed
Accompanying Personnel:
D. Thompson, Safeguards Inspector
Approved by:
Oxf4 G6kMb
b ~ @S
D. R.'McGuire, Chief U
Date Signed
"
Safeguards Section
Nuclear Materials Safety and Safeguards Branch
Division of Reactor Safety and Safeguards
,
SUMMARY
Scope:
This routine, announced inspection was conducted in the area of Physical
Security Program for Power Reactors, specifically: Management Support,
Physical Security Plan and Implementing Procedures; Physical Barriers -
,'
Protected and Vital Areas; Access Control - Personnel, Packages, and Vehicles;
Assessment; Compensatory Measures; Alarm Stations and Communications.
In
addition, the status of the licensee's upgrade of physical security systems
and facilities are reviewed.
Results:
In the areas inspected, one apparent violation of regulatory requirements
relating to issuance of security badges was identified. No deficiencies were
noted in other areas inspected with the exception of assessment capability,
which was compensated in accordance with NRC approved licensee commitments.
Continued delay in completion of the security program upgrade with an extended
completion of July, 94 was noted.
Inspector results confirmed that the
security force continues to perform professionally and is capable of providing
and acceptable level of' protection for the plants safety-related equipment.
dbW8
SAFEGUARDS WOTAATIOT
22 4 @ 6 : -
9306250057 930618
ADOCK 05000259
G
-