Gereta!Itectoc Compny 175 Cartnet Avenue. Sun Jose. CA 95125 June 18,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - Revision of SSAR Subection 18.8
)
Dear Chet:
Enclosed is a markup of the draft SSAR Subsection 18.8 based on a GE/NRC May 27,1993 telephone call.
Please provide a copy of this transmittal to Clare Goodman.
Sincerely, ek Fox Advanced Reactor Programs cc: Norman Fletcher (DOE)
Keith Gregoire (GE)
I
%bOl O
nym Db
\\\\ \\
9306240359 930618
\\
. ABWR meicara Standard Plant REV.A 18.8 COL LICENSE INFORM ATION 18.8.1 IISI Design Implementation Process The HSI Design Implementation Process is described in Appendix 18E,is the responsibility of the COL applicant and is to be considered a general COL action item. In addition, the following specific COL action items are in effect.
18.8.2 Number of Operators Needing Controls Access The number of operators needing access to the controls on the main control panel shall be evaluated and the ABWR control room staffing arrangement (see Subsection 18.2, Item 1) shall be confirmed as adequate. In addition, the roles and responsibilities of the shift supervisor and assistant shift supervisor shall be specified. The results of the evaluation shall be placed in the HFE issue Tracking System (see Subsection 11.2 of Table 18E.2.1).
18.8.3 Automation Strategies and Their Effect on Operator Reliability Automation strategies for plant operation shall be evaluated for effects on operator reliability and the appropriateness of the ABWR automation design (see Subsection 18.4.2.6.1) shall be confirmed, This evaluation shall be performed according to the criteria of Subsection II of Table 18E.2.1 and the results of the evaluation shall be placed in the HFE Issue Tracking System.
18.8.4 SPDS Integration With Related Emergency Response Capabilities The design of the SPDS (see Subsection 18.4.2.11) shall be evaluated against the requirements of Paragraph 3.8a of NUREG-0737, Supplement 1, and confirmed to be in compliance with all applicable criteria. The results of the evaluation shall be placed in the HFE Issue Tracking System.
18.8.5 Standard Design Features Design Validaation.
The design of each of the main control room standard design features (see Subsection 18.4.2) shall be validated using the applicable criteria in Subsection VIII of Table 18E.2.1. The results of the validation shall be placed in the HFE Issue Tracking System.
18.8.6 Remote Shutdown System Design Evaluation Digital versus analog design approaches for the Remote Shutdown System (RSS) shall be evaluated for reliability and the adequacy of the ABWR RSS design (see Section 18.5) shall be confimied. The results of the evaluation shall be placed in the HFE issue Tracking System.
18.8.7 Local Valve Position Indication j
The necessity for providing local valve position indication (VPI) for each valve in any of the following categories shall be evaluated i
i 1R 8-1 Amendment 7
'. ABWR m6imAn Standard Plant REv A
- 1. All power-operated valves (e.g., motor, hydraulic and pneumatic),
- 2. All large manual valves (i.e.,5 cm or larger),
- 3. Small manual valves (i.e.,less than 5 cm) which are important to safe plant operations.
These evaluation records shall be placed in the HFE lssue Tracking System.
18.8.8 Operator Training An operator training program which meets the requirements of 10CFR Part 50 shall be established (see Subsection II.1.c of Table 18E.2.1).
18.8.9 Safety System Status Monitoring The COL applicant shall address the human factors aspects of TMI Item I.E.3, " Safety System Status Monitoring", as part of the detailed design implementation process (see Subsection 18.4.2.8).
18.8.10 PGCS Malfunction As part of the verification and validation effort, the COL applicant shall consider malfunctions of the Power Generation Control function of the process computer system (see Subsection 18 A.2.6.1).
18.8.11 Local Control Staions The applicant shall evaluate all operations at local control stations which are critical to plant safety, as defined in Paragraph V.l.c of Table 18E.2.1. The results of these evaluations shall be incorporated into the HFE lssue Tracking System.
1 I882 Amendment ?
..