ML20045C606

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Proposed Change 93-05 Revising TS SR 4.6.5.3.2 Associated W/Ice Condenser Intermediate Deck Doors to Provide Less Restrictive Lifting Force Requirements
ML20045C606
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/16/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045C607 List:
References
NUDOCS 9306240066
Download: ML20045C606 (2)


Text

-

A 1

4 Tennessee Valley Authonty, Post Off;ce Box 2000 Soddy-Da;sy Tennessee 37379-2000 l

Robert A. Fenech Vice President, Sequoyah Nuclear Plant Jime 16,1993 TVA-SQN-TS-93-05 10 CFR 50.90 U.S. Nuclear Regulatory Conunission .

ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

'In the Matter of ) Docket'Nos. 50-327 Tennessee Valley Authority ) 50-328 j SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 93-05,

" REVISION OF ICE CONDENSER INTERMEDIA 7 DECK DOOR LIFTING FORCE REQUIREMENT" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change revises TS Surveillance Requirement 4.6.5.3.2 associated with ice condenser intermediate deck doors to provide less restrictive lifting force requirements that are consistent with the Westinghouse Electric Corporation analysis.

'The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure.2. A proposed determination of no significant hazards consideration performed pursuant to.10 CFR 50.92 is provided in Enclosure 3. The Westinghouse, operating procedure', TVA-EOP-6, " Inspection of Intermediate Deck Doors" is provided in Enclosure 4. i i

TVA requests a 45-day implementation period for this TS change following: l 1ssuance. 'l I

J l

2200D-l I

9306240066 930616 ~

PDR -ADOCK 05000327 .

_1[

P. PDR -

/ (_  ;

.~. .

'-k ! ,.

U.S.-Nuclear Regulatory Commission Page 2 ,

June 16, 1993 Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.

Sincerely, P.cbert A. Fenech Sworn to a d subscr ed before me ,

this _: day of .. _

1993

)  ;

Notary Public /

My Commission Expires /97

/ ,

Enclosures  ;

cc (Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear. Regulatory Commission .

One White Flint, North 11555 Rockville' Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures) '

Division of_ Radiological Health 3rd Floor L & C Annex 401 Church Street-Nashville, Tennessee 37243-1532 NRC Resident Inspector j Sequoyah Nuclear Plant 2600 Igou Ferry' Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II q 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

-i u

i