Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/93-07 & 50-425/93-07 on 930328-0501.C/As:I&C Foreman & Technicians Have Been Counseled Re Importance of Adequate Reviews
ML20045C328
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/16/1993
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0033, LCV-33, NUDOCS 9306220367
Download: ML20045C328 (3)


Text

cema Pow c<n.nacy 40 inwrrew Cemer Parkv.r, Pod 0% f3a 1295 o amn;mm Aw, a an.m

(

b;iepht.re PO5 877-7122 m

Georb'ia Power C. K. McCoy v.m Pr e

  • N.e y :yr pe: v;t f!e souff em &ctoc sy>lem June 16, 1993 i

LCV-0033 Docket No.

50-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT REPLY TO A NOTICE OF VIOLATION Pursuant to 10 CFR 2.201, Georgia Power Company (GPC) submits the enclosed response to the violations identified in Inspection Reports 50-424/93-07 and 50-425/93-07 concerning the inspection conducted by Mr. B. Bonser during the period of March 28 through May 1,1993.

Sincerely, C. K. McCoy /

CKM/NJS Enclosure xc:

Osprgia Power Company Mr. J. B. Beasley Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commissi.p_n Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident inspector, Vogtle kl0 ti.: a 9306220367 930616 PDR ADOCK 05000424 G

PDR u

i.

4 ENCLOSURE

~

VOGTLE ELECTRIC GENERATING PLANT-UNIT 1 REPLV TO A NOTICE OF VIOLATION NRC INSPECTION REPORTS 50-424:425/93-07 The following is a transcription of the violation as cited in the Notice of Violation (NOV):

"10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires measures to be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.

Contrary to the above, on March 16,1993, a Design Change Package and other associated reference material were not adequately reviewed as part of the corrective action to troubleshoot an illuminated bistable light on the Main Control Board. This resulted in a momentary loss of the only available train of decay heat removal.

This is a Severity Level IV violation (Supplement 1)."

RESPONSE TO VIOLATION (50-424/93-07-05)

Admission or Denial of the Violation This example of the violation occurred as stated in the NOV.

Reason for the Violation This violation was attributed to an inadequate review by Instrumentation and Controls (I&C) personnel of the affected circuitry prior to removing a circuit card for troubleshooting an indication on the trip status light board. An I&C technician and foreman performed these reviews, but they failed to identify all the components afTected by the circuit card. The removal of the circuit card caused residual heat removal system suction isolation valve 1-HV-8701B to close, causing a loss of decay heat removal for approximately 2 minutes.

Corrective Steps Which IInve Been Taken and the Results Achieved

1. The IAC technician and foreman have been counseled regarding the importance of adequate reviews.
2. Instrumentation and Controls personnel have been briefed regarding this event and the enhanced specific work controls to use when performing this type of work.

Corrective Steps Which Will Be Taken to Avoid Further Violations All corrective actions have been completed, and no further action is warranted at this time.

I

ir ENCLOSURE (CONTINUED)

VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORTS 50-424:425/93-07 Date When Full Compliance Will Be Achieved i

Full compliance was achieved on March 16,1993, at 1652 EDT, when valve 1-HV-8701B was reopened, thereby restoring decay heat removal capability.