ML20045C175

From kanterella
Jump to navigation Jump to search
Forwards Initial License Exam Rept 50-346/OL-93-01 During Wk of 930524.Areas of Concern Noted Re Individuals Signing Exam Security Agreement & Then Conducting Training or Evaluations of at Least One Requalification Retakers
ML20045C175
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/14/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
CENTERIOR ENERGY
Shared Package
ML20045C176 List:
References
NUDOCS 9306220158
Download: ML20045C175 (7)


Text

r a

dl!N 141933 Docket No. 50-346 Centerior Energy ATTN: Mr. Donald Shelton Vice President-Nuclear Davis-Besse c/o Toledo Edison Company 300 Madison Avenue Toledo, OH 43652

Dear Mr. Shelton:

SUBJECT:

INITIAL LICENSE EXAMINATION REPORT During the week of May 24, 1993, Mr. John Walker, Chief Examiner and others administered initial licensed operator examinations to employees of your organization who operate your Davis-Besse Nuclear Power Station. At the conclusion of the examination, findings that were identified as a result of the examinations were discussed with those members of your staff identified in the enclosed report.

Five previously licensed Reactor Operators were given Senior Reactor Operator examinations. All individuals passed all sections of their respective examination.

In addition three Senior Reactor Operators were administered Requalification Retake examinations under revision 7 of NUREG-1021, Operator Licensing Examiner Standards, Job Performance Measure (JPM) portions only.

Two of the individuals passed the retake examination. One individual failed the requalification examination.

For the individual with unsatisfactory results, the facility should take corrective action as required by its approved requalification program. Since this is the individual's second NRC examination failure, the facility program should be reviewed to ensure effective identification and correction of operator performance weaknesses.

Two areas of concern were identified during this examination. The first involved three individuals signing the examination security agreement and then conducting training or evaluations of at least one of the requalification retake operators after that point. A written response is requested within 30 days of the date of this report regarding this event to identify all corrective actions taken or proposed to prevent a reoccurence. The second concern involved identifying an inadequate procedure.

Both of these events are further described in the body of this report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

9306220158 930614 PDR ADOCK 05000346 V

PDR

/

l

q Centerior Energy 2

JUN 141933 I

Should you have any questions concerning this examination, please contact us.

Sincerely, ORIGIN AL SIGNED BY. L O. MARN T. O. Martin, Acting Director Division of Reactor Safety

Enclosures:

1.

Examination Report No. 50-346/0L-93-01 2.

Examinations and Answer Key (SRO) 3.

Simulation Facility Report i

cc w/ enclosures.

L. Storz, Plant Manager OC/LFDCB Resident Inspector, RIII State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health A. Grandjean, State of Ohio, Public Utilities Commission R. Simpkins, Plant Training Manager J. B. Hopkins, Project Manager Eugene Benjamin, PNL J. Nickolaus, PNL R. M. Gallo, LOLB c w/ enclosures:

PUBLIC-I'E42)

RIII RIII RIII RIII RIII

[See following page--------------------------------]

Gb%

Walker /cg Burdick Lanksbury Lange T. Martin 06/ /93 06/ /93 06/ /93 06/ /93 06/(4/93'

=!

l i

1

Centerior Energy 2

JUN 141993 Should you have any questions concerning this examination, please contact us.

Sincerely, GCiNAL blGNED OY 7. O. MARUN T. O. Martin, Acting Chief Division of Reactor Safety

Enclosures:

1.

Examination Report No. 50-346/0L-93-01 2.

Examinations and Answer Key (SRO) 3.

Simulation Facility Report cc w/ enclosures:

L. Storz, Plant Manager OC/LFDCB Resident Inspector, RIII State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health A. Grandjean, State of Ohio, Public Utilities Commission R. Simpkins,' Plant Training Manager J. B. Hopkins, Project Manager Eugene Benjamin, PNL J. Nickolaus, PNL R. M. Gallo, LOLB bcc w/ enclosures:

PUBLIC-IE42 RIII R k RII RIII RIII Walker /cg Burdick anksbury Lange T.

tin 06//o /93 06/((/93 06/11/93 06/g/93 06/M/93

,