1 Jill 3 1993 Docket No. 50-302 License No. DPR-72 Florida Pcwer Corporation Mr. Percy M. Beard, Jr.
Senior Vice President, Nuclear Operations ATTN: Manager, Nuclear Operations Licensing P. O. Box 219-NA-2I Crystal River, FL 34423-0219 Gentlemen:
SUBJECT:
ELECTRICAL DISTRIBUTION SYSTEM FUNCTIONAL INSPECTION CRYSTAL RIVER PLANT - UNIT 3 This letter confirms the dates of June 28 - July 30,1993, for the Electrical Distribution System Functional Inspection (EDSFI) of your Crystal River Plant.
Plans for this inspection were discussed in a telephone conversation which E. Froats and A. Friend of your staff and held with R. Schin and E. Girard of this office on June 1, 1993.
Relevant details of these plans and of documents requested to fac ilitate the inspection are as follows:
Documents Reouested for Review Prior to the Inspection Two copies each of the following documents are requested to be sent to.
E. Girard at the Region II office at least two weeks before the start of the inspection:
l.
Operations training manuals on the electrical distribution system subsystems (e.g., Off Site Power, 120 VAC Distribution, Intermediate and Low Voltage Distribution, Diesel Generator Sequencers, and DC Distribution).
2.
Latest revision of FSAR section 8 and any updates awaiting annual submittal.
3.
Latest revision of Technical Specification sections covering the Electrical Distribution System and planned improvement changes.
NRC Inspection Personnel The EDSFI is tentatively to be performed by three inspectors and a team-leader. The team leader will be E. Girard. The inspectors will be identified later.
9306220086 930603
\\
PDR ADOCK 05000302
[
G PDR
JUN 3 1993 Flori'da Power Corporation 2
Inspection location Three weeks of the inspection will be conducted at your plant site and engineering offices: June 28 - July 2, July 12 - 16, and July 26 - 30, 1993. During the weeks of July 5 - 9 and 19 - 23, the inspection will continue through documentation review in the inspectors' offices.
It is anticipated that two of the inspectors will primarily review calculations at your engineering offices that the third will primarily review maintenance and test records and inspect hardware at the plant site. The team leader will divide his time between the locations and may assist-in the site inspection.
Inspection Meetinas The entrance meetina will be scheduled for 9 a.m. on June 28,' 1993, at the plant site.
Prior to the exit meeting a debriefina will be held between the NRC inspectors and cognizant licensee personnel.
In this meeting the significant findings of the inspection will be informally reviewed and discussed. This is intended to provide a forum to aid in mutual understanding of the inspector's findings and to identify any further data that should be considered regarding the findings. The debriefing is tentatively scheduled for 4:30 p.m. at the site on July 26, 1993.
This provides just more than one day for review and consideration of additional data prior to the' conclusion of the inspection.
The exit meetina time will be established later.
Licensee Presentation It is requested that you provide a presentation to the inspectors at the entrance meeting to address the following areas of interest:
1.
Personnel who will support the inspection.
2.
' An overview of the various organizational units involved in the design, technical support, operation, and maintenance of the Crystal River Unit 3 Electrical Distribution System (EDS).
3.
EDS arrangement, especially any features that may be considered unique to Crystal River Unit 3.
4.
Any related regulatory commitments (or exemptions) that are unique in nature.
5.
A very brief summary of any self-assessments that have addressed the EDS or emergency diesels.
6.
An overview of programs / procedures' for control of load growth, setpoint control, fuse control, and modifications to the EDS.
F JUN 3 593 Flori'da Power Corporation 3
7.
A summary of past (last five years) and planned major modifications to the EDS.
8.
Overview and status of any recently completed or ongoing design-basis or calculation update program applicable to the EDS.
Documentation Reouested to be Available for Review at the Team's Work Areas at the Site and Enaineerina Offices 1.
Electrical drawings a.
Schematics for safety related motor control. centers b.
Schematics for 4.16 kV switchgear breakers c.
Schematics and logic drawings for Emergency Diesel Generator sequencers d.
One line drawings for Switchyard Non Class 1E 4.16 kV and low voltage Class IE 4.16 kV and low voltage (including 480 VAC load centers and motor control centers, DC systems, and 120 VAC systems) 2.
Calculations / analyses supporting plant AC and DC electrical system design a.
Basis for setting of voltage relays and their control logic b.
Short-circuit currents c.
Voltage regulation d.
Coordination of overcurrent protection (circuit breakers, relays, fuses) e.
Cable sizing f.
Electrical design computer program users manual and validation process 9
Index of electrical calculations, if available 3.
Load profiles and sizing calculations for station battery chargers and inverters
~
!UN 3 !cG3 Florida Power Corporation 4
4.
Description of the surveillance / maintenance program covering safety related and important to safety electric equipment. Also, records for most recent performance of the following preventive maintenance, calibrations, and tests:
a.
Degraded voltage and loss of voltage relay calibrations b.
Class IE 4.16 ???kV protective relaying calibrations Note: Additional records will be requested during the initial on-site week.
5.
Protective relay setting list 6.
List of problems related to the EDS that the plant problem identifi-
~
cation programs have identified over the last 5 years 7.
Corrective maintenance summary for electrical equipment, including at least two outages and sorted by equipment type Sufficient licensee personnel, knowledgeable in the above areas, should be available to support the inspection effort. Your cooperation during this inspection will be appreciated. Should you have any questions regarding this inspection, please contact E. Girard at 404/331-4186.
Sincerely,
/S Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety cc: Gary L. Boldt Vice President, Nuclear Production Florida Power Corporation P. O. Box 219-SA-2C Crystal River, FL 34423-0219 B. J. Hickle, Director Nuclear Plant Operations Florida Power Corporation P. O. Box 219-NA-2C Crystal River, FL 34423-0219 R. C. Widell, Director Nuclear Operations' Site Support Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 34423-0219 (cc cont'd - See page 5)
E
Florida Power Corporation 5
JUN 3 [g93 (cc cont'd)
Gerald A. Williams Corporate Counsel Florida Power Corporation MAC - ASA P. O. Box 14042 St. Petersburg, FL 33733 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard' Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Robert B.'Borsum B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 (bec - See page 6) 3 e
I w
m
+
t Flo,rtda Power Corporation 6
JN 3 paq b'cc : K. Landis, RII R. Schin, RII M. Shymlock, RII H. Silver, NRR S. Vias, RII Document Control Desk t
NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 3
\\
l 1
-i 1
l FILE: S:\\DRS\\EB\\XTAL-LTR.EHG RII:DRS RII D8P
/
EGir(ardAldf 94