UNITED STATES f
NUCLEAR REGULATORY COMMISSION g (J'.
W ASHINGTON, D.C. 20555-0001 June 16,1993 Docket No. 50-293 Mr. Richard T. Hill General Electric Corporation 175 Curtner Avenue San Jose, California 95125
Dear Mr. Hill:
SUBJECT:
PILGRIM NUCLEAR POWER STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. M40164)
By application dated. June 11, 1993, and your affidavit dated June 10, 1993, you submitted Get eral Electric Company Report NEDC-31852P,' " Pilgrim Nuclear Power Station SAFtR/GESTR-LOCA Loss-of-Coolant Accident Analysis," and requested information in it be withheld from public disclosure pursuant to 10 CFR 2.790.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
a.
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; b.
Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; c.
The information identified in the above-referenced document is classified as proprietary because it contains detailed results of analytical models, methods and processes, including computer codes, which GE has developed, obtained NRC approval of, and applied to perform evaluations of the loss-of-coolant accident for the BWR.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of General Electric's statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.
Therefore, the report entitled, " Pilgrim Nuclear Power Station SAFER /GESTR-LOCA Loss-of-Coolant Accident Analysis", marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
O 9306210125 930616 PDR TDPRP EMvGENE C
ppg r
' 0 i
Mr. Richard T. Hill June 16, 1993 Withholding from public inspection shall not affect the right, if any, of i
persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely,
/S/
Ronald B. Eaton, Senior Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
Docket File NRC & Local PDRs PDI-3 Reading SVarga JCalvo WButler SLittle REaton MPSiemien, OGC JLinville, RI m
OFFICE LA:PDIf3 PM:PDI-3 OGC D:PDI-3 f\\ )
SL-N Rhtdmw MPSiemienN WButler b' N
I //lf/93 kjh/93 Y
/ Id37!
h/lb/93
/ /
1 DATE 3
OFFICIAL RECORD COPY FILENAME: A:PIM40164.LTR
l
~
Mr. Richard T. Hill June 16,1993 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the. future such that the information could then be made available
'for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination' adverse.to the above, you will,be. notified in advance of any public disclosure.
Sincerely, jyb Ronald B. Eaton, Senior Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page
4-Pilgrim Nuclear Power Station ec:
Mr. Edward S. Kraft, Mr. H..Vernon 0heim Vice President of Nuclear Manager, Reg. Affairs Dept.
i Operations & Station Director Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Resident Inspector Nuclear Information Manager U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road
' Post Office ' Box 867 Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 i
Mr. Thomas Rapone Chairman, Board of Selectmen Secretary of Public Safety 11 Lincoln Street Executive.0ffice of. Public Safety Plymouth, Massachusetts ;02360 One Ashburton Place"
.j Boston, Massachusetts 02108 Office of the Commissioner Massachusetts Department of Mr. David Rodhah, Director l
Environmental Protection Massachusetts Emergency Management One Winter Street Agency Boston, Massachusetts 02108 400 Worcester Road P.O. Box 1496 Office of the Attorney General Framingham, Massachusetts '01701-0317'
?
One Ashburton Place Attn: James Muckerheide 20th Floor Boston, Massachusetts 02108 Chairmen, Citizens Urging Responsible Energy.
Mr. Robert M. Hallisey, Director P. O. Box 2621 i
Radiation Control Program Duxbury, Massachusetts 02331 Massachusetts Department of Public Health Citizens at Risk l
305 South Street P. 0. Box 3803 Boston, Massachusetts 02130 Plymouth, Massachusetts 02361 Regional Administrator, Region I W. S. Stowe, Esquire U..S. Nuclear Regulatory Commission Boston Edison CompanyL 475 Allendale Road 800 Boylston St., 36th FloorL King of Prussia, Pennsylvania 19406 Boston, Massachusetts 02199 Mr.-Paul J. Hamilton Mr. E. Thomas Boulette, Ph.D-Licensing Division Manager Senior Vice President - Nuclear-Boston Edison Company _
Boston Edison Company-25 Braintree Hill Park Pilgrim Nuclear Power Station Braintree, Massachusetts 02184 RFD #1 Rocky. Hill Road' Plymouth, Massachusetts 02360 e
~
~a