Forwards Insp Repts 50-282/93-07 & 50-306/93-07 on 930412-0514.One Unresolved Item Identified Re Lack of Analyses to Demonstrate Tornado Qualification of EDG Ventilation Dampers
ML20045B536
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/11/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Antony D
NORTHERN STATES POWER CO.
Shared Package
ML20045B537 List:
References
NUDOCS 9306180049
Download: ML20045B536 (3)


See also: IR 05000282/1993007

Text

.

_

po te c

UNITED STATES

gm

fg

NUCLEAR REGULATORY COMMisslON

g

w(

Q

REGION lli

[

$

[

799 ROOSEVELT ROAD

0,

&

GLEN ELLYN, ILLjNots 60137

%

/

  • . **

JUN 111333

,

i

Docket No. 50-282

i

Docket No. 50-306

Northern States Power Company

ATTN: Mr. D. D. Antony

Vice President, Nuclear

Generation

414 Nicollet Mall

Minneapolis, MN 55401

Dear Mr. Antony:

This refers to the special electrical distribution system functional

inspection (EDSFI) conducted by Mr. Rolf A. Westberg and others of this office

on April 12 through May 14, 1993.

The inspection evaluated activities at the

Prairie Island Nuclear Generating Station, Units 1 and 2, authorized by NRC

Operating Licenses No. DPR-42 and No. DPR-60. We discussed our inspection

findings with Mr. M. Wadley and members of your staff at the exit interview on

May 14, 1993.

The team concluded that Prairie Island's electrical

distribution system (EDS) was designed, operated and maintained in an

effective manner. The team also concluded that Prairie Island's engineering

and technical function support was good.

The enclosed inspection report identifies areas examined during the

inspection. The team assessed the design, implementation, and engineering

technical support relative to the EDS.

The inspect'on reviewed selected

design calculations, relevant procedures, representative records, installed

equipment, and interviewed engineering and technical support staff.

Through its review activities, the team identified some. strengths and

weaknesses. Most notable among the strengths were robust EDS design;

competent, well qualified people with good plant knowledge; good plant

material condition; excellent EDS surveillances; and good self assessment

relative to the EDS. The recently completed installation of the D5 and D6

emergency diesel generators constituted a significant improvement to your EDS.

Minor weaknesses were identified relative to design and calculations.

,

Various commitments were made as documented in the enclosed report to address

the concerns of the inspection team.

In addition, one followup item was

'

identified in the report. This item and commitments will be reviewed during a

followup inspection.

During this inspection, one unresolved item (282/93007-02; 306/93007-02) was

identified regarding the lack of an analyses to demonstrate tornado

qualification of the EDG ventilation dampers. We request that you submit

within 60 days of the date of the letter transmitting this inspection report,

a written response detailing:

(1) the steps that will be taken to address the

damper issue; and (2) the date when the analyses will be completed.

,

.

9306380049 930611

PDR

ADDCK 05000282

\\

G

PDR

\\;t\\_

PU6LIC .jfD)

._

, .__

. - . .

.

.

..

.

__

t

!

Northern States Power Company

2

d'

2 I Y33

No violations of NRC requirements were identified during the course of this

inspection.

,

t

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

!

this letter and the enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

i

!

Sincerely,

[

!

(/ .O./ ~V

\\

1

T. O. Martin, Acting Director

Division of Reactor Safety

j

Enclosures:

1

1.

Inspection Reports

i

No. 50-282/93007(DRS);

l

No. 50-306/93007(DRS)

2.

Appendix A - Personnel

i

i

Contacted

3.

Appendix B - Requests

!

for Information

'

i

See Attached Distribution

!

1

!

J

1

'

i

-

1

}

r

'

.

-

--

- -

.

-

.

r

Northern States Power Company

3

JJN 111333

,

i

Distribution

cc w/ enclosures:

E. L. Watzl, Site Manager,

Prairie Island Site

M. Wadley, Plant Manager

'

OC/LFDCB

Resident Inspector, RIII

+

Prairie Island

Resident Inspector, RIII

i

!

Monticello

'

John W. Ferman, Ph.D. ,

!

Nuclear Engineer, MPCA

Kris Sanda, Commissioner

.

Minnesota Dept. of Public

'

Service

Prairie Island LPM, NRR

Robert M. Thompson, Administrator

'

WI Division of Emergency Government

-

W. Hodges, RI

J. Durr, RI-

A. Gibson, RII

C. Julian, RII

S. Collins, RIV

T. Steka, RIV

K. Perkins, RV

L. Miller, RV

E. Imbro, NRR

'l

B

4

!

!

$

t

t

4

i

t

,