Forwards Insp Rept 50-440/93-13 on 930601-04.No Violations Noted
ML20045B519
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/11/1993
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stratman R
CENTERIOR ENERGY
Shared Package
ML20045B520 List:
References
NUDOCS 9306180036
Download: ML20045B519 (3)


See also: IR 05000440/1993013

Text

DcD/DcS

-

.

,

N 111993

'

Docket No. 50-440

Docket No. 50-441

Centerior Service Company

ATTN: Mr. R. A. Stratman

Vice President

Nuclear - Perry

c/o The Cleveland Electric

Illuminating Company

10 Center Road

Perry, OH 44081

Dear Mr. Stratman:

SUBJECT:

INSPECTION OF THE 1993 EMERGENCY PREPAREDNESS EXERCISE AT PERRY

This refers to the inspection conducted by Ms. H. Simons and others of this

-

office on June 1-4, 1993. The inspection included a review of activities

.

authorized at your Perry Nuclear Power Plant. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the enclosed report.

Within these areas, the inspection consisted of a selective examination of

procedures and records, interviews with personnel, and observations of

activities in progress.

No violations of NRC requirements were identified during the course of this

,

inspection. However, one exercise weakness was identified during this

inspection which will require corrective action. This weakness is summarized

in the Appendix to this letter. As required by 10 CFR 50, Appendix E'(IV.F),

any weaknesses that are identified must be corrected.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

,

,

t

9306180036 930611

1

PDR

ADOCK 05000440

'

0

PDR

i

\\

3C-3C

-

..

Centerior Service Company

2

JUN 111993

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Bruce L. Jorgensen, Acting Chief

Reactor Support Programs Branch

Enclosures:

1.

Appendix - Exercise Weakness

2.

Inspection Report

,

No. 50-440/93013(DRSS)

cc w/ enclosures:

F. R. Stead, Director, Nuclear

Support Department

Kevin P. Donovan, Manager,

Licensing and Compliance Section

S. F. Kensicki, Director, Perry

Nuclear Engineering Dept.

'

H. Ray Caldwell, General

Superintendent Nuclear Operations

David P. Igyarto, Plant Manager

Licensing Fee & Debt Collection

Branch

Resident Inspector, RIII

Terry J. Lodge, Esq.

James R. Williams, State of Ohio

Robert E. Owen, Ohio

Department of Health

A. Grandjean, State of Ohio,

Public Utilities Commission

A. Williams, FEMA, RV

bcc w/ enclosures:

PUBLIC

,

RII

RIII

RIII

RIII

RIII

RIII

iDi '

.ff)

'

Mc).Wb

[Eg O'r

b

I

Cormick-Barger

Lanksbury

Jor.ensen

S

ns/dg

Reidinger

ar ey

06

/93

y/5

6/u/g

6/a/93

6-Il '*

.

.

..

'

APPENDIX

,

'

Exercise Weakness

During the 1993 exercise, the licensee failed to verify a worker's medical

qualification prior to assigning him a respirator. This worker had not

received a medical qualification within the last 12 months as required .by

10 CFR 20.103(c)(2). This weakness is discussed in Section 4.c of Inspection

Report No. 50-440/93013(DRSS).

>