MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES TXX-9610, Monthly Operating Repts for March 1996 for CPSES1996-03-31031 March 1996 Monthly Operating Repts for March 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
+
I t
== mau.
EM Log # TXX-93241
~
File # 10010.2 !
3_
Ref. # 10CFR50.36 l TUELECTRIC i June 14, 1993 ;
William J. Cahm. Jr.
Grewp Yire President U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNITS 1 & 2 DOCKET N0s. 50-445 and 50-446 MONTHLY OPERATING REPORT FOR MAY 1993 .
Gentlemen:
Appendix A to the Comanche Peak Steam Electric Station Units 1 &- 2 Operating License Nos. NPF-87 and NPF-89.
Sincerely.
William J. Cahill, Jr.
RC/rc +
Attachment c - Mr. J. L. Milhoan, Region IV Mr. T. Reis, Region IV Resident Inspectors, CPSES (2)
Mr. T. A., Bergman, HRR l
l PDR
. onol i 9306170381 930531 Y 4 N. Olive Street LB.81 Dallas. Texas 75201
/h 9
i i ADOCK'05000445 !!
R- ppy g
Att; chm:nt to TXX 93241 Page 1 of 9 COM ANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO: 50445 UNIT: CPSES 1 DATE: June 11,1993 COMPLETED BY: Janet Hughes TELEPHONE: 817-8974331 -
OPERATING STATUS
- 1. Reporting Period: MAY 1993 Gross hours in reporting period: Z41
- 2. Currently authorized power level (MWt): Sill Max. depend. capacity (MWe-Net): 1150
- Design Electrical Rating (MWe-Net): 1150
- 3. Power level to which restricted (if any) (MWe-Net): NONE
- 4. Reasons for restriction (if any):
THIS MONTH YRTODATE CUMULATIVE 4 744 3,583.4 19,102 Number of hours reactor was critical 6.
0 0 2.258.6 Reactor reserve shutdown hours 744 3,5673 18,726.3
- 7. Hours generator on line 0 0 0
- 8. Unit reserve shutdown hours 2,493,8232 11,475,451 2 58,771 2 2
- 9. Gross thermal energy generated (MWH) 838,023 3,854,184 19,489,349
- 10. Gross electrical energy generated (MWH) 802,475 3,687,917 18,530,293
- 11. Net electrical energy generated (MWH)
- 12. Reactor Service factor 100.0 98.9 77.8
- 13. . Reactor availability factor 100.0 . 98.9 87.0
- 14. Unit service factor 100.0 985 76.3
- 15. Unit availability factor 100.0 98 5 76.3
- 16. . Unit capacity factor (Using MDC) 93 3 88.5 65 7 93 8 88 5 65.7
- 17. Unit capacity factor (Using Design MWe)
- 18. Unit forced outage rate 0 15 6.7
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each): Refueling Outage Number .
. ]
3 is scheduled to begin October 8,1993, with a duration of 52 days. )
- 20. If shutdown at end of reprt period, estimated date of startup:
- 21. Units in test status (prior to commercial operation): ACHIEVED l Commercial Operation 900813 Estimated I 1
l
~
Attachment to TXX.93241 Page 2 of 9 AVERAGE DAILY UNIT POWER LEVEL DOCKETNO: N UNIT: CPSES 1 DATE: June 11,1993 COMPLETED BY: Janet Hughes TELEPHONE. 817 5 7-5331 MONTH: MAY 1993 DAY AVERAGE DA!LY POYER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 920 1100 1 17 2 1100 18 1098 3 1102 1095 19 4 1101 1096 20 5 1101 1098 21 6 1100 1097 22 7 1098 1096 23 8 1097 24 1099
, 9 1096 25 1102 10 1098 26 1093 11 1097 27 1097 12 1096 28 1096 13 1100 29 904 14 1089 30 1095 15 867 31 1W 16 1096
. .. m . _ - - - . _ __ _ . .. m
)
l
'Attachm:nt to TXX-93241 ;
'Page 3 of 9 ' .)
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO: 5W ;
UNIT: CPSES 1 DATE: June 11,1993
}
COMPLETEDBY: Janet Hughes ,
TELEPHONE: 817-897-5331 MONTH: MAY 1993 c 0501 0000 Unit started month in MODE 1 with a power reduction in progress from 100 ' percent of rated I
thermal power in preparation for surveillance testing. ;
0501 2400 Unit ended month in MODE 1.
r F
9 5
P s
r A
i i
i a
b
Attachment to TXX. 93241 .-
Page 4 of 9 UNIT SHUTDOWNS AND POWER REDUCTIONS >
DOCKETNO: M UNIT: CPSES 1 ,
DATE: June 11,1993 COMPLETED BY: Janet Hughes REPORT MONTH MAY 1993 METHODOF TtPE SHUTTING DOWN Ff0RCED DURATION THEREACTOROR NQ. D8IE SfiCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVEACTIONSCOMMENTS
- 1) FEASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E OPERATOR TRANNG AND UCENSE EXAMINATION 1: MANUAL B: MAINTORTEST F: ADMNSTRATIVE 2:' MANUAL SCRAM '
C: FEFUEUNG G: OPERATIONALERROR(EXPLAIN) 3: AUTOMATIC SCRAM D: EGULATORYRESTRICTION H: OTHER(EXPLAIN) 4: OTHER(EXPLAIN)
f Attachm::nt to TXX. 93241 Pfge 5 of 9 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKETNO: 50446 UNIT: CPSES 2 DATE: June 11,1993 ,
COMPLETED BY: Janet Hughes i TELEPHONE: 817497-5331 OPERATING STATUS
- 1. Reporting Period: MAY 1993 Gross hours in reporting period: IM
- 2. Currently authorized power level (MWt): M11 Max. depend. capacity (MWe-Net): 1L50
- Design Electrical Rating (MWe-Net): 1150
- 3. Power level to which restricted (if any) (MWe-Net): 29Q
- 4. Reasons for restriction (if any): Initial startuo THIS MONTH YRTODATE CUMULATIVE
- 5. Number of hours reactor was critical E 834 834
- 6. 0 0 0 Reactor reserve shutdown hours .
328.1 836 836
- 7. Hours generator on lirie ,
0 0 0
- 8. Unit reserve shutdown hours 665,234.4 1,330.468.8 1,330,468.8
- 9. Gross thermal energy generated (MWH) 152,610 320,680 320,680
- 10. Gross electrical energy generated (MWH)
- 11. Net electrical energy generated (MWH) 129,268 268,787 268,787
- 12. Reactor Service factor NA NA NA
- 13. Reactor availability factor NA NA NA
- 14. Unit service factor NA NA NA
- 15. Unit availability factor NA NA NA
- 16. Unit capacity factor (Using MDC) NA NA NA
- 17. Unit capacity factor (Using Design MWe) NA NA NA ,
- 18. Unit forced outage rate NA NA NA
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
- 20. If shutdown at end of report period, estimated date of startup:
- 21. Units in test status (prior to commercial operation): FORECAST ACHIEVED :
Initial Criticality 930320. 930324 ,
initial Electricity 930330 930409 )
Commercial Operation 930801 Estimated l
Attachment to TXX- 93241 Page 6 of 9 AVERAGE DAILY UNIT POWER LEVEL DOCKETNO: N '
UNIT: CPSES 2 DATE: June 11,1993 )
COMPLETEDBY: Janet Hughes TELEPHONE: 817-897 4331 MONTH: MAY 1993 DAY AVERAGE DAILY POWER LEVEL CAY AVERAGEDAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 S 17 778 2 472 18 780 3 491 771 19 4 10 219 20 5 0 21 0 6 32 0 22 7 11 0 23 8 1T 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 27 29 0 14 337 30 0 15 GED 31 0 16 740
Attachment to TXX- 93241
. Pags 7 of 9
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO: 50 446 UNIT: CPSES 2 DATE: June 11,1993 COMPLETED BY: Janet Hughes TELEPHONE: 817-897-5331 MONTH: MAY 1993 0501 0000 Unit started rnonth in MODE 1.
0504 0253 Manually tripped the reactor due to loss of Feedwater flow to Stream Generator #1. Unit entered MODE 3.
0505 1602 Unit entered MODE 2.
- 1646 Reactor is critical 0506 0116 Unit entered MODE 1.
0237 Sychronized to the grid.
1416 Manually tripped the reactor for Remote Shutdown Test. Unit entered MODE 3.
0507 1020 Unit entered MODE 2.
1102 Reactoris critical.
1705 Unit entered MODE 1.
1745 Sychronized to the grid.
r
-0508. 2225 Manually tripped the reactor for Loss of Offsite Power Test. Unit entered MODE 3.
05'12 0409 Unit entered MODE 2.
0445 Reactor is critical.
05'13 1022 Unit entered MODE 1.
1131 Sychronized to the grid.
0520 0701 Reactor automatically tripped due to Loss of Cootant Flow to Generator Stator. Unit entered MODE 3.
0523 07D4 Unit entered MODE 4.
1712 Unit entered MODE 5.
0524 0900 Started Post ISU due to Feedwater Isolation Valve slow closure.
i l
Attachm:nt to TXX-50241 Page 8 of 9 j
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO: 50446 l UNIT: CP3ES 2 DATE: June 11,1993 -
COMPLETED BY: Janet Hughes _
TELEPHONE: 8174974331 MONTH: MAY 1993 0531 2400 Unit ended month in MODE 5 during Post ISU.
G S
O O
1 e
Attachment to TXX- 93241 .
Page 9 of 9 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO: 50'446 UNIT: CPSES 2 DATE: June 11,1993 COMPLETED BY: Janet Hughes TELEPHONE: '817-8976331 REPORT MONTH MAY 1993 METHODOF T6E SHUTTING DOWN FfORCED DURATION THERECTOROR M DATE SSCHEDUI Fn (HOURS) REASON REDUCtBG FOA/ER CORRECTIVEACTKXGCOMMENTS 4 930504 F 37.2 A 1 Loss of Feedwater flow to Steam Generator #1.
5 930506 S 20.1 0 1 Remote Shutdown Test.
6 %0500 S 77.7 8 1 Loss of Offsite Power Test.
7 T OS20 F 98 A 3 Loss of Coolant Flow to Generator Stator.
8 930524 S 183. A 4 Feedwater Isolation Valve slow closure.
Unit 2 was already in MODE 5.
- 1) REASON 2) METHOD A: EQUIPMENTFAILURE(EXPLAIN) E OPERATOR TRAINING AND UCENSE EXAMINATION 1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAM C: NFUELING G: OPERATIONALERROR(EXFLAIN) 3: AUTOMATIC SCRAM D: REGLAATORYRESTRCTION H: OTHER(EXPLAIN)~ 4: OTHER(EXPLAIN)