ML20045B239

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1993 for San Onofre Unit 1.No Challenges to Pressurizer Safety or Relief Valves Noted During Reporting Period
ML20045B239
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/14/1993
From: Rosenblum R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045B240 List:
References
NUDOCS 9306170011
Download: ML20045B239 (1)


Text

{{#Wiki_filter:. 4 ,fG Southem Califomia Edison Company 23 PARKER STREET IRVINE, C AllF ORNIA 92718 M. fA HOSE NBLLJfA TELEPHONE SAA>sAGEM OF (714)454-4505 8 June 14, 1993 m,ciun -m-onml.~ns U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 -l

Subject:

Docket No. 50-206 1 Monthly Operating Report for May 1993 -{ San Onofre Nuclear Generating Station, Unit 1 Technical Specification 6.9.1.10 to Possession Only License DPR-13 for the San Onofre Nuclear Generating Station, Unit 1, requires SCE to provide a Monthly. Operating Report which includes routine operating statistics, shutdown experience, and all challenges to pressurizer safety and relief valves. This letter transmits the May 1993 Monthly Operating Report for Unit 1. There l were no challenges to pressurizer safety or relief valves during this reporting period. ? If you require any additional information, please let me know. l Sincerely, / l l Enclosure cc: . R. H. Faulkenberry, Regional Administrator, NRC. Region V S. W. Brown, NRC Project Manager, San Onofre Unit 1 C. W. Caldwell, NRC Senior Resident Inspector, Units 1, 2. & 3 R. F. Dudley, Section Chief, Non-Power, Decommissioning, and Environmental Project,- Directorate :of Reactor Projects-3, 4 & 5 /'I p I 9306170011 930614' . j~? PDR.ADOCK 05000206 / R PDR q ,}}