ML20045B182

From kanterella
Jump to navigation Jump to search
Informs That Procedure Adherence Group Formed Prior to 920301 as Commited in Response to Violation Noted in Insp Rept 50-369/91-22.Proposed Corrective Actions Received from Group Listed
ML20045B182
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/03/1993
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9306160382
Download: ML20045B182 (3)


Text

,

11-I.

Dukeher Company T C Af< n m v

AlcGuire Nuclear Generation Department Vice1%sident

~12700 Hagm ferry kd(kIGGIA)

(704)h75-4800 Huntmh!!e. NC280?84983

. (704)8754809fu j

DUKEPOWER i

June 3, 1993 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk l

Washington, DC 20555

Subject:

McGuire Nuclear Station i

Docket Nos. 50-369, 370 Inspection Report No. 50-369, -370/91-22 Gentlemen:

In your January 14, 1992 letter acknowledging our response to Violation 369/91-22-03, you stated that we had committed to form an onsite group to evaluate procedure compliance by March 1,.1992 and that the actions proposed by this' group - to. further enhance.

performance would be implemented by June 1, 1993.

The Procedure Adherence Group was formed prior to March'1, 1992 as committed.

On October 19, 1992, five proposed corrective-acticas were received from this group.

Four of. the. five proposed' corrective actions dealt directly with the change tofa " rule based

' philosophy" of procedure use and adherence to correct the. concern of the violation..These four proposed actions were-the' Action Plan.

i for Management, the Action Plan for Training; the. development of a' procedure adherence. training tape and tofrewrite the directive on procedure use and' adherence. These four actions were 'all completed by the June 1, 1993 committed date.

The' fif th proposed corrective action dealt with recommendations for improving. the-quality of procedures. and 'were programmatic in.

-t nature.

These recommendations were forwarded to the Procedure Steering Committee to be. evaluated. LThe evaluation was completed' by the' June 1, 1993 committed.'date and the recommendations.will be!

implemented 'and continue to.be tracked' under the-Problem' 1

Investigation Process' program.

l l

1 1F00%

-l A

9306160382 930603 a

PDR ADOCK 05000369 P

y

)y

{} { ' I G

PDR j

V

3 j

g

. ' Document Contol Desk i

Page 2 June.3, 1993 l

Therefore, Duke Power believes we have met all the commitments for the response to violation 91-22-03.

t' If you have any questions, please call Larry Kunka.at (704) 875-4032.

l l

Very truly yours,

)

)

/

VY T.

C.

McMeekin l

i xc:

Mr.

S. D.

Ebneter Administrator, Region II l

U.S.

Nuclear Regulatory Commission 1001 Marietta St.,

NW, Suite 2900 Atlanta, GA 30323 i

i Mr. Victor Nerses U.S. Nuclear Regulatory Commission Office of Nuclear Regulatory Management One White Flint North, Mail Stop 9H3 i

Washington, DC 20555 l

Mr.

P.

K. Van Doorn NRC Senior Resident Inspector McGuire Nuclear Station l

4 f

i

'I i

l a

]

Document Contol Desk Page 3 June 3, 1993 bec:

R. O.

Sharpe M.

K. Nazar MF 1.2.1 File 801.01 0

7 C

I I

t r

j