ML20045A955
| ML20045A955 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/31/1993 |
| From: | Daughtery L, Hutchinson C ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-93-00072, GNRO-93-72, NUDOCS 9306150387 | |
| Download: ML20045A955 (5) | |
Text
,
d!!!!
ntergy E
w.,u ogmuoo., i,,
=
Operations 2,s %sas w r 1-c 7 2c00 i
June 9, 1993 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-93/00072
_ Gentlemen:
l In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for May 1993.
If you have any questions or require additional information, please contact this office.
Yo s truly, s
0 - _ __
Hutchinson Vice President - Operations GGNS CRH/TMC/cg t
attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reduction ec:
(See Next Page) 1 i
1 9306150387 930531 h) p ADOCK0500g6 rg g-PDR R
gj
r.
June'9, 1993 GNRO-93/00072 Page 2 of 3 i
cc:
Mr. R. H. Bernhard (w/a)
Mr.
D.
C. Hintz (w/a) r Mr. R. B. McGehee (w/a)
Mr.
N.
S.
Reynolds (w/a)
Mr.
H. L. Thomas (w/o) l
-Mr. Stewart D. Ebneter (w/a)
Regional Administrator
[
U.S. Nuclear Regulatory Commission Region II i
101 Marietta St.,
N.W.,
Suite 2900 Atlanta, Georgia 30323 Mr.
P. W.
O'Connor, Project Manager Office of nuclear Reactor Regulation U.S.
Nucleatr Regulatory Commission Mail.Stop 13H3 i
Washington, D.C.
20555 F
E l
9 t
i l
i
)
}
+
o 1
1 1
4
h DOCKET NO 50-416 DATE 06/08/93 COMPLETED BY L.
F.
Dauchtery-TELEPHONE (601) 437-2334 OPERATING STATUS 1.
Unit Name:
GGNS UNIT 1
-2.
Reporting Period:
May 1993
- 3..
Licensed Thermal Power (MWt):
3833 MWT 4.
Nameplate Rating (Gross MWe):
1372.5 MWE 5.
Design Electrical Rating (Net MWe):
1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe):
1143 MWE 8.
If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report.
Give Resason:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 744 3,623 75.519
'12. Number of Hours Reactor was Critical 744.0 3.623.0 61,169.1
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744.0 3623.0 58,836.7-
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,801.943. 13,719.038 205,959,178 17.. Gross Electrical Energy Generated (MWH) 898,390-4,461,442 65,543,274
- 18. Net Electrical Energy Generated (MWH) 863.413 4,290.844 62,758,768^-
- 19. Unit Service Factor 100.0~
100.0 80.4
-20. Unit Availability Factor 100.0 100.0 80.4-21~. Unit Capacity-Factor (Using MDC Net) 101.5 103.6 77.4 22._ Unit Capacity Factor (Using DER Net) 92.8 94.8 70.2 23._ Unit Forced Outage Rate 0
0 5.9 24._ Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of-Each):
Beain Refuelina Outaae-6 on 10/08/93 for an estimated duration of 46 days.
- 25. If Shut Down At End of Report Period.
Estimated Date of Startup:
26.l Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL-ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
12 to
-l
'.c I
DOCKET NO' 50-416 l
4
~
DATE 06/08/93 COMPLETED BY L.
F.
Dauchtery TELEPHONE (601) 437-2334 1
MONTH May 1993 Day. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
'I 1
1138 17 1175
'2 1182 18 1136 3-1190 19 1185 4
1188 20 1191 l[
l 5
1179 21 1193 i
6 1177 22 1185-
'I 7
1177 23 1184 i
8 1163 24 1180 i
[
9 1175 25 1178 10 1151 26 1165
- l 11 1188 27 1177 12 1122 28 1174 13-1188 29 1136
.14-1188 30 1174
)
i 15 903 31 1176 16-1059 N/A
]
1
7 7
.t '
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-416 DATE 06/08/93 COMPLETED BY L.
F.
Daughtery TELEPHONE (601) 437-2334-REPORT MONTH May 1993 No.
Date Type Duration Reason Method of Licensee System component cause &
(1)
Hours (2)
Shutting Event Code Code Corrective Down Report #
(4)
(5)
Action to Reactor Prevent (3)
Recurrence 93-05/15/93 S
32.2 B
5 NA NA NA Reactor. thermal 004 power reduced to approximately 60% for control rod sequence exchange.
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions
-S:
Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual' Scram Entry Sheets for Licensee-B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restricting 5-Reduced load E-Operator Training &
6-Other Licensing Examination 5
F-Administrative Exhibit 1-Same Source G-Operational Error (Explain)
H-Other (Explain)
L-
.a.-
..-..,....a..-.-.
-.-..a--
-