ML20044H337

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to MCEI-0400-46, McGuire Unit 1 Cycle 9 Colr. Exact Value of Tilt Uncertainty Now Specified on Pages 11 & 14
ML20044H337
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/28/1993
From: Canady K
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044H338 List:
References
NUDOCS 9306080200
Download: ML20044H337 (1)


Text

11 1

1 hike Ihtver Company Dec'tric Center l'O Box 100fi Charlotte, N C 2H20110tili DUKEPOWER May 28,1993 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D. C. 20555

Subject:

McGuire Nuclear Station, Unit i Docket Number 50-369.

Core Operating Limits Report for Cycle 9, Revision 1 Please find attached, pursuant to McGuire Technical Specification 6.9.1.9, revision I to the Com Operating Limits Report for McGuire Unit 1 Cycle 9. In this revision, the 100% negative A.O. limit documented in figure 3, page 9 is corrected to read -20% instead of-19%. Additionally, on pages 11 & 14, the exact value of the TILT uncertainty is now specified. These corrections are documented in the attachment.

If there are any questions, please call Richard Clark at (704) 382-5823.

Very imly yours,

/

(

tw K. S. Canady Manager, Nuclear Engineering, Nuclear Services, Nuclear Generation Department cc:

Mr. V. Nerses. Project Manager Mr. S. D. Ebneter, Regional Administrator Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission - Region 11 U. S. Nuclear Regulatory Commission 101 Marietta Street, NW - Suite 2900 Mail Stop 141125, OWFN Atlanta, Georgia 30323 Washington, D. C. 20555 Mr. P. K. Van Doom Senior Resident Inspector McGulm Nuclear Station bxc:

(w/o Attachments)

G. A. Copp 111 P. F. Guill (MNS)

S. A. Gewehr -

M. T. Cash (MNS)

R.11. Clark R. O. Sharpe (MNS)

MC-801.01

00L, i

hb Db f

P

_