ML20044H323
| ML20044H323 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/28/1993 |
| From: | Chris Miller Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20044H324 | List: |
| References | |
| NUDOCS 9306080186 | |
| Download: ML20044H323 (7) | |
Text
-
g
/ps.* ** ouq'o UNITED STATES g
l' NUCLEAR REGULATORY COMMISSION o
y, A
,E WASHINGTON. D. C. 20555
\\..../
+
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH J0TTOM ATOMIC POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 175 License No. DPR-44 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated February 5,1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;
/.
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health cr safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
93060B0186 930628 PDR ADOCK 05000277 p
d
> (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 175, are hereby incorporated in the license.
PEC0 shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION CSda Y MY Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: thy 28,1993
/
f
ATTACHMENT TO LICENSE AMENDMENT N0.175 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET N0. 50-277 Replace the following page of the Appendix A Technical Specifications with the ei. closed page. The revised areas are indicated by marginal lines.
Remove Insert 242 242 f
5
Unit 2 PBAPS 5.5 FUEL STORAGE The new fuel storage facility shall be such that the K rr dry e
A.
is less than 0.90 and flooded is less than 0.95.
B.
The K.cr of the spent fuel storage pool shall be less than or equal to 0.95.
Spent fuel shall only be stored in the spent fuel pool in a C.
vertical orientation in approved stora5e racks.
D.
The spent fuel storage racks are designed and shall be maintained with fuel assemblies having a maximum K-infinity of 1.362 in the nominal reactor core confi uration at cold conditions.
5 5.6 SEISMIC DESIGH The station Class I structures and systems have been designed for ground accelerations of 0.05g (design earthquake) and 0.12g (maximum credible earthquake)
)
i
- By letter dated February 19, 1986, the Commissions's granted i
i approval limited to certain specific high density storage racks and methods of storage for Unit 2 spent fuel pool.
/
/
f i
l 242 hrendment No. 23, 70, 116, 175 t
J
e,n ota
[
o UNITED STATES
.7, (
NUCLEAR REGULATORY COMMISSION l;;
p WASHINGTON, D. C 20555
\\..../
+
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET N0. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 178 License No. DPR-56 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated February 5, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;
/
D.
The issuance of this amendment will not be inimical to the common defense and secur,ty or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. OPR-56 is hereby amended to read as follows:
, ?
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.178, are hereby incorporated in.the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Chah h &kJ Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 28, 1993 i
?
r l
l l
l ATTACHMENT TO LICENSE AMENDMENT NO. 178 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 A
Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.
Remove Insert 242 242 1
1 A
/
i P
5 h
e vn-
.-e..,,
... - y
i 1
Unit 3 PBAPS J
5.5 FUEL STORAGE A.
The new fuel storage facility shall be such that the K.tr dry is less than 0.90 and flooded is less than 0.95.
B.
The K rr of the spent fuel storage pool shall be less than or e
equal to 0.95.,
C.
Spent fuel shali only be stored in the spent fuel pool in a vertical orientation in approved storage racks.
D.
The spent fuel storage racks are designed and shall be maintained with fuel assemblies having a maximum K-infinity of 1.362 in the nominal reactor core configuration at cold conditions.
5.6 SEISMIC DESIGN The station Class I structures and systems have been designed for ground accelerations of 0.05g (design earthquake) and 0.12g (maximum credible earthquake)
- By letter dated February 19, 1986, the Commissions's granted approval limited to certain specific high density storage racks and methods of storage for Unit 3 spent fuel pool, t.
/
f
?
L 242 Amendment No. 33, 4S, 120, 178
,