Text
__
- ?
.s 9 -
'A@
Telephone (412) 393-6000
.Dx4 Shwngport. PA 15077-0004 June 7,' 1993 l
l Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatine Report U. S. Nuclear Regulatory Commission Document Control Desk j
Washington, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly -
Operating Report is submitted for Unit 1 and Unit 2 for the month of May,1993.
Respectfully,
{
.e D. E. Spoerry Divuion Vice President Nuclear Operations DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA l
I h '.l 9306070440 930531 PDR ADOCK 05000334 1
-- R PDR
NARRATIVE
SUMMARY
OF MQtTIHLY OPERATDG EXPERIDJCE i
UNIT 1 1%Y 1993 i
May 1 The Unit's ninth refueling outage continued with the Unit in through Mode 6.
May 16 May 17 Mode 5 was entered at 0435 hours0.00503 days <br />0.121 hours <br />7.19246e-4 weeks <br />1.655175e-4 months <br />. The. Unit remained in Mode 5.
i through for the remainder of the report period.
May 31 9
5 s
t 8
9 9
8 1
AVERAGE DAILY UNIT POWTR LEVEL DOQGT NO.
50-334 UNIT BVPS Unit 1 DATE ' June.2, 1993 COMPLEITD BY David T. Jones TELEPHONE
-(412) 393-7553 Mormi May 1993 DAY AVERAGE DAILY POWTR LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MNe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22
-0 7
0 23 0
8 0
24 0
9 0
25 0
10 0
26 0
1 11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
i 15 0
31 0
16 0
4 INSTRUC1' IONS On this' format, list the average daily unit power level MWe-Net for each day in the reportirq nonth. Canpute to the nearest stiole megawatt.
4
e.
.]
OPERATING DATA REPJ.1T I
DOCKET NO.:
'50-334 REPORT DATE:
06/03/93 l
COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 i
- l OPEPATING STATUS
-l
- 1. UNIT NAME: BEAVER VALLEY PO*ER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: MAY 1993
- 3. LICENSED THERMAL POWER (MWt):
2652
-3
- 4. NAMEPIATE RATING (Gross MWe):
923 i
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810 I
8 -. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
I
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A-I THIS MONTH YEAR TO DATE' CUMULA' LIVE-
- 11. HOURS IN REPORTING PERIOD:
744.0 3623.0 149759.0 i
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 F041.6
.95591.9
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 2038.2 93689.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0!
- 16. GROSS THERMAL ENERGY GEN. (Mkm):
0.0 4687212.0 223662213~.5 4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 1541890.0 72036383.0
- 18. NET ELECTRICAL' ENERGY GEN. (mkt):
-2760.0 1438570.0 67304510.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 56.3 64.5.
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 56.3 64.5 1
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 47.6 56.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 15.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF.EACH):
THE UNIT'S NINTH REFUELING OUTAGE IS STILL IN PROGRESS.
i
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
06/09/93
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A' INITIAL ELECTRICITY N/A N/A-COMMERCIAL OPERATION N/A N/A i
.l I
l 1
.-n
,n.
r-----
xm
- s UNIT SHUTDOWNS AND POWER REDUCTIONS (120%)
Docket No.
50-334 Unit Name BVPS Unit #1 Date June 3.
1993 Completed By David T. Jones REPORT MONTH MAY 1993 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date typet (Hours)
Reason 2
,Down Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence 4
930501 5
744.0 C
4 N/A RC FUELXX Unit remained shutdown for the ninth refueling outage.
s 1
2 3
4 F+ Forced Reason:
Method:.
Exhibit F-Instructions for S-Scheduled
.A-Equipoent Falture (Explain) 1-Manual.
Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-RefueEing 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction.
4 Cont'd. from Previous Month E-operator-training & License Exam Reduction 5'
F-Administrative 9-Other Exhibit H-Same Source.
G-operational Error (Emplain)
H-Other (Explain)
\\'
m.
~
- - -. - - - ~ -
/---
-- ~~
~- -
- - J3
NARRATIVE Suf4ARY OF MOtTIHLY OPERATDC EXPERIDJCE UNIT 2 MAY 1993 May 1 The Unit operated at a nominal value of 100% output.
through May 7 May 8 At 1312 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.99216e-4 months <br /> the Unit reduced output to approxirately 98%
during a routine monthly maintenance surveillance procedure.
to complete a
Channel I and Qunnel II 6 T/Tavg calibration.
The power reduction was performed as a precaution to avoid a turbine runback and potential plant trip with one out of three turbine runback signals already tripped by the calibration procedure and a second channel known to experience occasional noise spiking at higher power levels.
At 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br /> the Unit returned to 100% output following completion of the calibrations.
May 9 The Unit operated at a nominal value of 100% output.
through May 26 May 27 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit commenced a reduction in output to approxirately 78% in accordance with the planned fuel cycle length extension.
May 28 An output of approximately 78% was achieved at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit commenced a further reduction in output to apprcxirately 43% in accordance with the planned fuel cycle length extension.
May 29 An output of approximately 43% was achieved at 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br />.
May 30 The Unit remained at approxirately 43% output for planned through fuel cycle length extension throughtot the remainder of the May 31 report period.
A k
~
AVERAGE DAILY UNIT PohTR LEVEL DOCKET NO.
50-412 UNIT BVPS Unit 2 DATE June 2. 1993 CDMPLEIID BY David T. Jones TELEPHONE J412) 393-7553 Molmi May 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)
(MWe-Net) 1 830 17 836 2
826 18 834 3
823 19 835 4
825 20 836 5
826 21 835 6
830 22-833 7
832 23
'834 8
824 24 829 9
826 25 832 10 825 26 835 11 824 27 830 12 828 28 639 13 838 29 329 14 836 30 320 15 828 31 318 16 835 i
i INSIRUCTIONS 1
On this forntt, list the average daily unit pcuer level We-Net for each day in the reporting nonth, campute to the nearest whole megawatt.
\\
d i
OPERATING DATA REPORT-i DOCKET NO.:
50-412 I
REPORT DATE: 06/03/93
(
COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS l
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2-Notes
'l
- 2. REPORTING PERIOD: MAY 1993
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A i
f THIS MONTH YEAR TO DATE CUMULATIVE ~
'[
- 11. HOURS IN REPORTING PERIOD:
744.0 3623.0 48542.0
)
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
744.0 3590.9 42092.1
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0
.0.0
- 14. HOURS GENERATOR WAS ON LINE:
744.0 3583.6 41808.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1839535.0 8911640.0 102458281.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
607186.0 2960025.0 33103829.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
576727.0 2807963.0 31257770.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 98,9 86'.1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 98.9 86.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 92.7 92.7 77.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.1 3.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT IS SCHEDbtED TO SHUTDOWN FOR ITS FOURTH REFUELING OUTAGE ON SFPTEMBER 17. 1993.
THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS.
- 25. IF SHUT DOWN AT END OF REPCRT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED l
INITIAL CRITICALITY N/A N/A L'
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A e
,.c.,
.s UNIT SNUTDOWNS AND POWER REDUCTIONS (220%)
Docket No.
50-412 Unit Name BVPS Unit #2 Date June 3. 1993 Completed By David T.
Jones REPORT MONTH MAY 1993 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event
' System Component Action to' No.
Date Typet (Hours)
Reason 2 Down teactor3 Report #
Code 4 Code 5 Prevent Recurrence 9
930527 5
0 N
5 N/A ZZ ZZZZ22 The Unit reduced output from 100%-
to approximately 78% in accordance the planned fuel cycle length extension.
10 930528 5
0 N
5 N/A ZZ ZZZZZZ The Unit reduced output from 78%
to approximately 43% in accordance 4
the planned fuel cycle tength I
extension.
1 2
3 4
F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A Equipment Failure (Explain) 1-Manual Preparction of Data Entry Sheets B-Maintenance or Test 2 Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5.
F-Administrative 9-Other Exhibit H-Same Source.
G-Operational Error (Explain)
H-Other (Explain)
. u..
,... - ~ _ -..
1..
.