Text
_
Ccmmonw:alth Edison
=-
C 1400 Opus Place O
Downers Grove, Illinois 60515 June 2,1993 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:
Document Control Desk
Subject:
Zion Station Units'1 and 2 Inservice Testing (IST) Plan for Pumps and Valves j
NRC Docket Nos. 50-295 and 50-304 I
Dear Dr. Murley:
Attached please find Revision 04/93 of the Second Interval Pump and Valve -
Inservice Testing Plan for Zion Station Units 1 and 2. Included in this revision are:
1.
New pump relief request PR-12; 2.
Revision to pump relief request PR04 to include the Residual Heat Removal Pumps; j
3.
Revision to pump relief request PR-11, erroneously submitted as PR-10 in Revision 11/92; 4.
Withdrawal of Technical Approach and Position PP-02, and 5.
Various clarifications, as delineated in the Plan's revision sununary,
'l page (iii).
Pump relief request PR-12 being submitted for the Service Water (SW)
System Pump Inservice Testing (IST) following replacement, repair,'or routine.
servicing. It has been determined that Zion cannot perfona poi,t-maintenance testing in accordance' with Section XI during power operation for the SW pumps.
Reliefis being requested in accordance with 10CFR50.55a(f) which requires that IST -
j of certain ASME Code Class 1,2, and 3 pumps and valves be performed in accordance with ASME Code Section XI and applicable addenda, except.where i
specific written relief has been requested by the licensee and granted by the Commission pursuant to the applicable subsection of 10CFR50.55a.
1 1
W
\\
k:\\tsmay.wpf/9 Q60 DO 00 95-e
,PDR I
l Dr. Murley June 2,1993 An expedited review and approval of relief request PR-12 is request in order to conduct the required post-maintenance testing to demonstrate the operability of the 2A Service Water Pump. This pump is currently scheduled to become available for testing by June 4,1993.
~
PR-04, dealing ydth pump bearing temperature measurements, was previously granted by the NRC for some IST pumps other than RHR. The relief request now includes RHR pumps and requires approval by the NRC. Technical Approach and Position, PP-02, which is being withdrawn, was not appropriate for i
the RHR pumps since the pump bearings are in the driver and are required scope per IWP-1200.
Please direct any questions you may have to this ofIice.
r i
Sincerely, 2A).
T.W. Simpkin l
Nuclear Licensing Administrator Attachment cc:
J.B. Martin, Regional Administrator - RIII C. Shiraki, Project Manager - NRR l