l GE Nuclear Energy coevt w an;w,
$ttr3P, $dn.C'C CA b'{I;a I?5 Cu!*
4 May 21,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Review Schedule - Chapter 14 Clarifications
Dear Chet:
Enclosed are SSAR markups providing the clarifications we discussed on our May 21,1993 conference call pertaining to the initial test program.
Please provide a copy of this transmittal to Frank Talbot.
Sincerely, t
(
da6o70 Jack Fox Advanced Rea..or Programs cc: Norman Fletcher (DOE)
H. J. Yang (GE) nma Q
9306020232 930521 i \\
PDR ADOCK 05200001 A
I b d { M /(' d !G i M M W E f h th t, & d cji~f, S'L d G j : h u 3.] J g M o;(
rpT4, wNua 6qhne-ht%'Wi'gre, ptwf rMI63r+ wag n JpW- @dy e: etw. e.xtar'umentation Preoper V
"C s C,)
l 14.2.12.1.'44-Post'Accadent Monitoring System Insfr I
,/
(1) Purpose J
l To verify the proper operation of post accident monitoring system (PAMS) to provide information for long term monitoring of the drywell and wetwell atmospheres and suppression pool temperature and level during i
both normal operations and accident conditions in the primary containment.
(2) Prerequisites I
ne construction tests have been successfully completed and the SCG has reviewed the test procedure and has i
appmved the initiation of testing. He suppression pool shall be filled and expected to undergo measurable I
level and temperature changes at some point during the scheduled testing. The required interfacing systems atnd.3;ormen_tage zSla'bli anwededa to support the specified testing. Additionally, any parallel testing to be performed in conjunction with the testing of this subsection is appropriately scheduled.
(3) General Test Methods and Acceptance Criteria A description of the instrumentation required for containment monitoring is presented in biaG5312r and' Subsection 7.5 for PAMS. Preoperational testing of these instruments will be performed in conjunction with the testing of the applicable systems. Only that instrumentation associated with the PAMS requiring I
special considerations is discussed below.
Performance shall be observed and recorded during a series ofindividual component and integrated system tests to demonstrate the following:
O (a) proper tracking of drywell pressure by all instrument channels during containment integrated leak rate testing (see Subsection
);
+- & ~ '(. 2.tu.4M a.
(b) proper operation and response of all5phYsn pool level instrumentation during actual changes in pool level; (c) proper operation and tracking of all suppression pool temperature monitoring (SPTM) system instrument channels during actual change in pool temperature-(d) proper functioning of associated indicators, recorders, annunciators, and alarms including those instruments in the main control room and in the remote shutdown panel.
(e) proper outputs to all system components that are required to function upon receiving inputs from the -
PANS instruments at the prescribed high/ low setpoints and inoperative conditions; (f) proper signal processing of the PAMS related instrumentation by the microprocessor as specified by the appropriate design specification; (g) proper operation of drywell and wetwell air temperature and pressure monitoring subsystem instrumentation.
System operation is considered acceptable when the observed / measured performance characteristics, from the testing described above, meet the applicable design specifications.
O f 4 9
Y
~
3 r
t A
+
14.2.12.2.41 Electr:tal Pcwer Distribution System Ferformance
(
til Purpose i
To verify that tne bus voltage and f recuency variations are an
.i accordance with tne cesign requirenents for applicable electrical power-j Jistr2 tut 2on tvstem t EFDEi c on fi gur ati on and tvera t i on a l c ondi ti ar,s.
l i
(2i Pr er equi sites T he preoptrat 2 onal testino is complete and plhnt management has reviewed the test procedure anc his approwed the initist)on of testing.
For each cch+dulcd testino iterataon the plant shall be in the appropriate operstional tenfiguration with all saetified prerequisites testing
- ccmolete, Instrurientation has been chetted or calibrated, as is l
afprtariate.
l I
a
'5) Descraptitn
[
itartup phase testirg of the EFD5 systen is intended to demscnstrate the capabilities of the systam bevond what was possinie during the l
pr ecper at a enal phase due to insufficient loads beiro supplied by some i
buses.
Pertinent data will be monitored when the plant is coerated at f
r: e e r rated ccnditicas, en ettempt shall be mace to cbtain the rescit 1
.Q
<alues with the EPD5 in the specific conf igurati on as descr ibed by. SSAR f
W Figure B,3-1.
04 particular interest will be to assure that the voltage 1 j
and frequency variations are in accordance with the design requirements as specifiec ty Eubsection E.2,3.
it) Criteria
\\
Level.
)
1 e
Not Appittable j
Lt.el 2
'l
.I Jcliage variations shall te no etr e thsn plus et minunus 10 percent of itetr nominal value during normal steady state operation.
Nercal steady state f-ret:uency of the EPDS shall be maintsined within i
plus or minus 2 tycles per second cf 60 tycles per second.during l
re:cytreble pericds ci system instability.
1 r
l 1
- h
L-g o-
. O 1
. 6-Table 14.2-1 POWER ASCENSION TEST MATRIX
- page 9 TESTING PLATEAU 3
POWER ASCENSIONTEST OV IIU LP MP IIP NOTES Concrete Temperature Surveys X
X X
X Steam Separator / Dryer Performance Test X*
- From high flow / low power cornerjust above the most
('
b.MKL h4IN}Wbdb[{JI4~_
y
^
~
PfDAW N
limiting region of P-F map
~
y If l%5D.% If6b* k (bYO*p {M'd g 4 d % ]
^
~
(
X = Testing required in plateau; alternative test conditions or exceptions identified in detailed testing specification vw%
O = Testing not specifically required in indicated plateau, but to be done in conjunction with other testing o within indicated plateau; see NOTES column for explanation onditions, generally OV = Open Vessel 110 = Nuclear lleatup LP = Low Power MP = Mid Power llP = liigh Power 3
5 r
4 v
m,..,_m.
.-%...-e,w-.y-.u.w
..#,-, -. -, -,.,+,#wg...ww.
-r,.,,, _,..-,
,,-www...
,,,,.,u...
y,+
-#--r.g
.-.y.
e,,e v.
,=--,-,.w..r-.-,
ws,
,..w--..%.,
,.,.m.,,-,..,a, m,.w, y-e,,
,