ML20044F895

From kanterella
Jump to navigation Jump to search
Forwards EPRI TR-101427, Exam of Trojan Steam Generator Tubes,Vol 3:Rockwell,Auger & Xps Analyses
ML20044F895
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/08/1993
From: Cross J, Robinson W
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044F896 List:
References
NUDOCS 9306010172
Download: ML20044F895 (3)


Text

,

munk.

n==!

y se!

Portland General Electric Company I

James E. Cross Vice President and Chief Nuclear Officer February 8, 1993-Trojan Nuclear Plant Docket 50-344 -

License NPF-1 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

(

Dear Sirs:

Auger Analyses Report Auger analyses were conducted on tubes removed from the Trojan Nuclear Plant steam generators. Portland General Electric Company committed to provide the results of these Auger analyses to the Nuclear Regulatory Commission Staff. The attached report is provided to fulfill that commitment.

Sincerely, I

W. R. Robinson.

for J. E. Cross -

Attachment c:

Mr. John B. Martin Regional Administrator, Region V U. S. Nuclear Regulatory Commission Mr. David Stewart-Smith State ofOregon Department ofEnergy Mr. Kenneth Johnston NRC Resident Inspector Trojan Nuclear Plant 9RA n an~

9306010172 930208 PDR ADOCK 05000344

' I I

P PDR I

121 SW Salmon Street,' Portland, OR 97204-

.I i

.503/464-8897

I!!!!Eh, Portland General Eectric Company James E. Cross Vice President and Chief Nuclear Officer April 15, 1993 Trojan NuclearPlant Docket 50-344 License NPF-1 U. S. NuclearRegulatory Commission Attn: Document ControlDesk Washington, DC 20555 f

Dear Sirs:

Release ofEPRI Reoort to Public Document Room Portland General Electric (PGE) letter dated February 8,1993, transmitted to the Nuclear Regulatory Commission (NRC) Electric Power Research Institute (EPRI) Report TR-101427,

" Examination of Trojan Steam Generator Tubes, Volume 3, Rockwell, Auger, and XPS Analyses". This letter provides PGE's authorization to the NRC to place this report in the Public Document Room.

Sincerely, T. D. Walt

s for J. E. Cross C

c:

Mr. John B. Martin Regional Administrator, Region V U. S. NuclearRegulatory Commission Mr. David Stewart-Smith State ofOregon Department ofEnergy Mr. Kenneth Johnston NRC Resident Inspector Trojan NuclearPlant p

')pbi f3oQ D2,qi p'

9 121 SW Salmon.}traat omfona no a,w ggg g,

,y

,a

MAJ1-8-9) J10H.ll:41. __

P.02

_...--~,..~~~4

'u mens 594 P. U2 WW Nsearch kwitutu Leadership in Science and Tcchnology January 26,1993 Mr. Harold Chernoff Manager, Licensing Portland General Electric Co.

Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048

Dear Mr. Chernoff:

REFERENCE:

EPRI TR-101427, " Examination of Trojan Stearn Generator Tubes, Volume 3: Rockwell, Auger, and XPS Analyses,,

November 1992.

This letter authorizes PGE to release the reference document at PGE's discretion for limited distribution, including to the NRC.

Sincerely, 1

e Robin' Jo

~

~

Sr. Technical Executive Materials & Chemistry Department c Art Kenny Hea:nquartrer $412 HilMswt Avenue. Post Office em tost 2, PaJo Wto, cA 94303. USA. (415) 052000 Teknc 8237 N*gren Omce:

1019 Ntnotnenth Street, NW. Sube 1000, WasNngen, DC 20036, USA W 872 0222. Fax:(202) 2965436

  • ax(415)8552954 s

< TRANSACTION REPORT >

03-08-1993 (t10N) 14:39 E

RECEIVE 3

NO.

DATE TIf1E DESTINATION STATION PG.

DURATION t10DE RESULT 9799 3-08 14:37 2

O'01*27" FINE OK 2

0"O1'27" l

EPRI Keywords:

Electric Power Nuclear steam generators Research institute Intergranular corrosion EPRI TR-101427 Volume 3 Intergranular stress corrosion cracking Project S413-04 inconel alloys Final Report November 1992 Examination of Trojan Steam Generator Tubes Volume 3: Rockwell, Auger, and XPS Analyses Prepared by ROCKWELL INTERNATIONAL, Thousand Oaks Calif

(

ornia M A TERI A L

./

SINGLE USER LICENSE AGREEMENT (EPRI). PLEASE READ IT CAREFULLY BEFO THE WRAPPING MATERIAL. TH CONTINUES ON THE BACK COVER.

AGREE TD THE TERMS OF THIS AGREEM S OF THIS AGREEMENT. IF YDU DO NOT PURCHASE PRtCE WILL BE REFUNDED.

1. GRANT DF LICENSE UNOPENED REPORT 10 EPRI AND THE report only for your own benefEPRI grants you the nonexclusive and nontra related entities; and (!!! a con (sultant to your compan t any site owned or operated by your company); (11) its subsd a contract agreeing no)t to disclose the report outside of its o g may use anes or other beneht or the benefit of any party other than your compa a

between most U.S EPRI member ut!hties and EPRI Any r o use the report for its own ny.

e Master Utility License Agreement Utihty License Agreement may get one on request o

member utihty that does not have a Master

2. COPYRIGHT This report, including the information contained in it is owned b EPR and intemational copyright laws You may not, without the pnor wntten p y

translate or modify this report, in any form in whole or in this report.

ermission of EPRI, reproduce, part. or prepare any derivative work based on

3. RESTRICTIONS You may not rent, lease, license, disclose or give this report t information contained in this report, for the benefit of any thi do any person reasonable steps to prevent unauthorized disclosure or us agreement does not grant you any right to patents, co;yrights trade s I. You agree to take all o

any other intellectualproperty nphis or licenses in respect of this rep trepo

)6010189 930208 ecrets, trade names trademarks or t

ADOCK 05000344 or.

PDR (continued on back cover)

_ - - - -