ML20044F738
| ML20044F738 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/21/1993 |
| From: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20044F739 | List: |
| References | |
| NMP2L-1388, NUDOCS 9305280461 | |
| Download: ML20044F738 (1) | |
Text
S,
,1 H Y NIAGARA RuMOHAWK i
NtAGARA MOHAWK POWER CORPORATION /NINE MILE POINT, FO BOX 63. LYCOMING NY 13D93/ TELEPHONE (315) 349-2882 B. Ralph SyMa May 21, 1993 i
Executive Vice President NMP2L 1388 Mucleaf U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Gentlemen:
Niagara Mohawk Power Corporation hereby transmits an Application for Amendment to Nine Mile Point Unit 2 Operating License NPF-69. Also enclosed are the proposed changes to the Technical 1
Specifications set forth in Appendix A of the above mentioned license. Supporting information and analyses demonstrating that the proposed changes involve no significant hazards consideration pursuant to 10 CFR 6 50.92 are included as Attachment B.
The proposed Technical Specification changes contained herein represent revisions to Specification 2.2.1, " Reactor Protection System Instrumentation Setpoints," Specification 3/4.2.2, " Average Power Range Monitor Serpoints," Specification 3/4.3.6, " Control Rod Block Instrumentation," and l
Specification 6.9.1.9, " Core Operating Limits Report." Specification 2.2.1 is being proposed for revision to increase the setpoints for the Average Power Range Monitor (APRM) Flow-Biased Simulated Thermal Power - Upscale Scram. Specification 3/4.2.2,3/4.3.6, and 6.9.1.9 are being proposed for revision to remove reference to the APRM rod block instrumentation. Associated changes to the Bases of Specification 3/4.2.2 are provided as well. In addition, the proposed amendment contains an editorial change to Specification 3/4.3.6. The proposed changes are consistent with NUREG 1433, " Improved Standard Technical Specifications for BWR/4." Niagara Mohawk requests app oval of this amendment by October 15, 1993 to support restart from the upcoming refueling outage.
Pursuant to 10 CFR 5 50.91(b)(1), Niagara Mohawk has provided a copy of this license amendment request and the associated analyses regarding no significant hazards consideration to the appropriate state representative.
Very truly yours, Yad v 0
B. Ra ph Syl la Exec. Vice President - Nuclear i
NMkD TDF/sek t
003773G0 Attachments xc:
Mr. T. Martin, NRC Regional Administrator Mr. W. L. Schmidt, Senior Resident Inspector Mr. R. A. Capra, Director, Project Directorate I-1, NRR Mr. J. E. Menning, Project Manager, NRR Ms. Donna Ross Division of Policy Analysis and Planning New York State Energy Office i
Agency Building 2 Empire State Plaza Albany, NY 12223
([/
Records Manacement 9305280461 930521 M
.I T
PDR ADOCK 05000410 h
j P
PDR L,