ML20044E496
| ML20044E496 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/18/1993 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20044E497 | List: |
| References | |
| NUDOCS 9305250085 | |
| Download: ML20044E496 (3) | |
See also: IR 05000277/1993006
Text
_;
-
_ _ - _ _ _ - _ - _ - _ _ _
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_.
, _ _ _ _
_ _
_ _ _ - .
,
- 39; ~
'
-
'
r
y
..
i'
MAY.l.t 1E3-
'
%p
-
-
y
. Docket / License No. < 50-277/DPR-44 :
, 50-278/DPR-56
Mr. D. M. Smith
Senior Vice President-Nuclear
Philadelphia Electric Company
<
"
Correspondence Control Desk .
P. O. Box 195 -
Wayne, PA 19087-0195
Dear Mr. Smith:
SUBJECT:
COMBINED INSPECTION 50-277/93-06 - AND 50-278/93-06-
~
_
' This letter transmits the findings of the resident safety inspection conducted by Messrs. J. J.
Lyash
F. P. Bonnett and R. K. Ierson and Ms. M. G. Evans from March 30,1993, through
.
May 10,1993, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. The inspectors
based these findings on observation of activities, interviews and document reviews, and dis-
cussed them with Mr. K. P. Powers of your staff.
- Peach Bottom Unit 2 and Unit 3 remained in operation during most of the inspection period.
~
'
The performance of the plant staff and management in respor. ding to emerging issues was very .
. good.' ' For example, the control room staff promptly identified developing problems _ _with
portions of the Unit 3 reactor water level indication system,- and. initiated a plant shutdown.
Technical staff follow-up of this event, and the management review process applied to resolution
of the resulting issues, were excellent.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
. its enclosuras will be placed in the NRC Public Document Room. We appreciate your coopera-
tion.
,
Sincerely,
ORIGINAL SIGNED BY
'
EDWARD C. WENIINGER
E. Wenzinger, Chief
N009.5
Projects Branch 2
Division of Reactor Projects
Enclosure!
- NRC Regicn I Combined Inspection Report 50-277/93-06 'and 50-278/93-06
9305250005 930528
' [}
'
I
.PDR- ADDCK 05000277
'
LG
PDR:
'
_
- ge
i
'A
.
.=
.
.
,
. , , . .
,
.i-.
'.
'
'
, _ , .
cr
..
,
MW 18 993
,
Philadelphia Electric Company
2
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
G. Rainey, Vice President, Nuclear Services Department
G. Cranston, General Manager, Nuclear Engineering Division
C. Schaefer, External Operations-Nuclear, Delmarva Power & Light Co.
K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station
A. J. Wasong, Manager Experience Assessment, Peach Bottom Atomic Power Station
G. A. Hunger, Jr., Manager, Licensing Section
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department, Atlantic Electric
B. Gorman, Manager, External Affairs
l
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Poulson, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Public Document Room (PDR)
Local Public Document Room (LPDR)
,
'
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
[
TMI - Alert (TMIA)
l
l
,
<
.
._ .
..
_
_
.-
-
~,m.
_
-
. .
. ..
...
1
!UN 18 973
j
l
-!
.
.
Philadelphia Electric Company
3
I
bec w/ encl.
Region I Docket Room (with concurrences)
j
i
bec wienc1 via E-Mail:
V. McCree, OEDO
l
J. Shea, NRR
l
M. Boyle, Acting PDI-2, NRR
-
2
- ;
i
I
r
!
>
?
i
,
1
i
,
,
]
,
t
'
.
.;
!
1
i
CONCURRENCES:
-
,
^
/7
RI:
I2,RP /
D<
'
-
//i
-
'
son
ganger
f6*$
'
,
OFFICIAL RECORD COPY
i
4
i
6
.
.
.
.
__
, ..