ML20044E142
| ML20044E142 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/14/1993 |
| From: | Creed J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20044E143 | List: |
| References | |
| NUDOCS 9305240008 | |
| Download: ML20044E142 (2) | |
See also: IR 05000483/1993005
Text
- - - _ - -
!
pc0
'
.
.
l
MAYi
'E
Docket No. 50-483
Union Electric Company
ATTN: Mr. Donald F. Schnell
l
Senior Vice President - Nuclear
i
Post Office Box 149 - Mail Code 400
l
St. Louis, MO 63166
Dear Mr. Schnell:
SUBJECT:
PHYSICAL SECURITY INSPECTION AT THE CALLAWAY NUCLEAR PLANT
3
This refers to the inspection conducted by Mr. G. Pirtle of this office
between April 12 and 20, 1993. The inspection included a review of authorized
activities for your Callaway Nuclear Power Station facility. At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
'
,
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations of
activities in progress.
No violations of NRC requirements were identified during the course of the
inspection. An unresolved item was identified and is addressed in Section 5.a
of the report details.
Resolution of this issue will be addressed by separate
correspondence.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure in accordance with Part 73, Title 10, Code of Federal
Regulations, Section 73.21(c)(2). This information must be handled and
protected in accordance with the provisions of 10 CFR 73.21. Consequently,
our report of this inspection will not be placed in the NRC Public Document
Room.
,'
Eno26sure Cer.taine
I
SAFICU1RDS I170F.M1,* ION
lf
Upon Separctica Oda
Tsce is Deconti:D n
'.'
9305240008 930514
ADOCK 05000483
O
_ _ . _
-- _ _ -___________
___
l
.
.
Union Electric Company
2
MAY 1 ' $33
)
We will gladly discuss any questions you have concerning this inspection.
l
Sincerely,
j
bbk
Jabes R. Creed, Chief
$'afeguards Section
Enclosure:
Inspection Report
No. 50-483/93005(DRSS)
(SAFEGUARDS INFORMATION)
cc w/ enclosure:
'
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
S. E. Sampson, Supervising
Engineer, Site Licensing
NRR/DRIS/RSGB9D
NMSS/HIGDON/4E4
OE Director
cc w/ enclosure w/o
SAFEGUARDS INFORMATION:
OC/LFDCB
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Drey
.
C. John Renken, Engineer
i
Policy & Federal Dept.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
Chairman, Illinois Commerce
Commission
bec w/ enclosure w/o
SAFEGUARDS INFORMATION-
1
PUBLIC
Ill
RIII
RIII
q
P rt e/dg
(
i
ed
05/G/93
,/
holo m 0'.tains
M UARDS IIi.90ERATION
Upon Separation 71:13
age Is Dece,tre;;g3
j
l
,
!