Text
~
&..
/
%o
UNITED STATES
T ,, .
NUCLEAR REGULATORY COMMISSION
y"-
7
- 5
E
REGION V
3
1450 MARIA LANE
e
4
WALNUT CREEK. CAUFORNIA 94596-5368
4
MAY 0 5 igg 3
Docket Nos. 50-528, 50-529, and 50-530
Ariz.ona Public Service Company
P. O. Box 53999, Station 9082
Phoenix, Arizona 85072-3999
Attention: Mr. William F. Conway
Executive Vice President, Nuclear
Subject:
NRC INSPECTION REPORT 50-528/93-15, 50-529/93-15, AND 50-530/93-15
This refers to a routine announced inspection conducted by Messrs. D. Acker
and S. Sanchez of this office, during the period of April 5 through 9,1993.
,
The inspection covered activities authorized by NRC License Numbers NPF-41,
NPF-51, and NPF-74. At the conclusion of the inspection, on April 9, the
"
inspectors discussed the findings with members of your staff identified in the
enclosed report.
Areas examined during this inspection are described in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspectors.
Based on the results of the inspection, certain of your activities appeared to
be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violations involved failure of your personnel to
.
ensure that:
required changes to drawings, procedures, and the Updated Final Safety
'
'
Analysis Report were identified and issued during performance of a
design change and
required tests of design changes were adequately performed.
In particular, we note that a system engineer and two engineering supervisors
approved an improperly completed design change package. We are, therefore,
l
concerned about the adequacy of engineering review and approval of retests for
i
design changes.
You are required to respond to this letter and should follow the instructions
spetified in the enclosed Notice when preparing your response.
In your
response, you should document the specific action taken and any additional
'
actions you plan to assure that design changes are properly tested and
affected documents properly updated. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
9305210183 930505
!
ADOCK 05000528
i
G
J
-
r-
I ,.
-
-
.
,
MAY 0 51923
bec w/ enclosure:
Project Inspector
Resident Inspector
,
G. Cook
B. Faulkenberry
S. Richards
Dacket File
bec w/o enclosure:
M. Smith
J. Zollicoffer
,
J. Bianchi
Region V
1A
YI
)p QQ[ fD3
S. Sa
z
D. Ac r
W. P. Ang
)N O/Y
t/f%1\\6
d
4F
LRE0JE$1 COPY 1 TRE0 VEST COPY 1 IRE 0 VEST LORY 1 IRE 0 VEST COPY 1
(YES) NO 1i
YES1
N0 1i
YES (NOJ 1 i TYESN N0 1
v
"
w/4 4
Y
R. Hue
H. Wong
L. f4111er
ih U
v/>1/93
f RE00EST COPY 1 IRE 00fST COPYl IREQUEST COPY 1
I /VES/ N0 1i XIS T NO 1 I /YEST NO 1
(V
V
w
ISEfthTO PDR1
I /VES )NO 1
~
L./
t
j
200103
i
1
L
i\\
IE 1
i
m
.a
-
.
,
. .
'
2
.
The responses directed by this letter and the enclosed Notice are not subject ~
l
to the clearance procedures of the Office of Management and Budget as required
!
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
In accordance-
with 10 CFR 2.790 of the NRC's, " Rules of Practice," a copy of this letter and
enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
i
to discuss them with you.
Sincerely,
Y
-
$ $
L. F. Miller, Jr., Chief
Reactor Safety Branch
i
i
Enclosures:
i
1.
i
2.
Inspection Report Nos. 50-528/93-15, 50-529/93-15 and 50-530/93-15
!
cc w/ enclosures (1) and (2):
Mr. Steve Olea, Arizona Corporation Commission
James A. Beoletto, Esq., Southern California Edison Company
"
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. Aubrey Godwin, Director, Arizona Radiation Regulatory Agency
.
,
Chairman, Maricopa County Board of Supervisors
i
Jack R. Newman, Esq., Newman & Holtzinger, P.C.
t
Mr. Curtis Hoskins, Executive Vice President and Chief Operating Officer,
Palo Verde Services
'
Roy P. Lessey, Jr., Esq., Akin, Gump, Strauss, Hauer and Feld
Bradley W. Jones, Esq., Akin, Gump, Strauss, Hauer and Feld
i
r
1
i
V
V
f
i