ML20044D061

From kanterella
Jump to navigation Jump to search
Amends 137 & 141 to Licenses DPR-24 & DPR-27,respectively, Revising Degraded Voltage Relay Setpoints in Table 15.3.5-1, Revising Actions Required If Conditions Specified in Table 15.3.5-3,Items 4.a & 4.b Not Met
ML20044D061
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/26/1993
From: Gody A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20044D055 List:
References
NUDOCS 9305170181
Download: ML20044D061 (7)


Text

"

g RIG t

UNITED STATES

[.Y i j NUCLEAR REGULATORY COMMISSION f

wAsmusTou, o.c.2xaam

,e

..+

WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266

-POINT BEACH NUCLEAR Pl. ANT. UNIT NO. 1 i

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

137 License No. DPR-24 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (the licensee) dated January 19, 1993 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be_-- _-

conducted in compliance with the Commission's regulations; p

D.

The issuance.of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

b h

9305170181 930506 PDR ADDCK 05000266 P

PDR

i i

~2~

2.

Accordingly, the license-is amended by changes to the Technical

.f Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.

DPR-24 is hereby amended to read as follows:

i B.

Technical Specifications l

The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 137, are hereby incorporated in the license. The itcensee shall operate the facility in i

accordance with the Technical Specifications.

i 3.

This license' amendment is effective immediately upon issuance. The l

Technical Specifications are to be implemented within 20 days from the i

date of issuance.

_j FOR THE NUCLES.R REGULATORY COMMISSION l

y Anthony T. Gody, Jr., Project Hansger Project Directorate III-3 Division of Reactor Projects III/IV/V

(

Office of Nuclear Reactor Regulation l

Attachment:

Changes to the Technical Specifications Date of issuance: March 26, 1993 l

I e

I l

)

a t

i O

l

.. ~ #[p uc p UNITED STATES uy

~

g 8

NUCLEAR REGULATORY COMMISSION n

W ASHING TON, D. C. 20555

- \\...../

ELSCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 POINT BEACH NUCLEAR PLANT. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amentent No.141 License No. DPR-27 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (the licensee) dated January 19, 1993 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and thn Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this ame.P ~' 311 not be inimical to the common defense and security or '

walth and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

t

.' 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of facility Operating License No.

DPR-27 is hereby amended to read as follows 9

B.

Technical Specifications i

The Technical Specifications contained in Appendices A and B, as revised through Amendment No.141, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective immediately upon issuance. The Technical Specifications are to be implemented within 20 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/

U nthony T.

dy, Jr.,

oject Manager Project Di ectorate I

-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance:

March 26, 1993 4

5

F ATTACHMENT TO LICENSE AMENDMENT NOS. 137 AND 141 TO FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 i

DOCKET N05. 50-266 AND 50-301 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT Table TS 15.3.5-1 Table TS 15.3.5-1 (Pg 2 of 2)

Table IS 15.3.5-3 Table TS 15.3.5-3

EE p;

TAntt 15.3.5-1 (Continued) us (Page 2 of 2) kk NO.

FUNCTIONAL UNIT CilANNil SETTINr. LIMif an 9.

Degraded Voltage (4.16 KV)

Disconnection of affccied 53959 volts + 1/2%

gg (A05.A06) bus from orfsite power Time delay:

_1 css than 60 xx PP sec at 0-10(1% of voltage setting 10.

loss of Voltage ww(-[

a.

4.16 KV (A05, A06)

Disconnection of affected a.

3220 volts f2%

l y,=

bus from offslie power Time Delay: 11 see 1105 gg Start Diesel at 0-100% of voltage

,-y setting ww

[;b b.

480 Y (A05, A06)

Lead shedding b.

256 volts 13%175see110 F$

y-iise deley:

~O at 0 volts

<3.5 see 120% at 90% of voltage setting 9

l 4

e

7 Taille 15.3.5-3 EMERGENCY COOLING re -*

.i 1

2 3

4 5

OPERATOR ACTION PP NO. OF MINIMUM MINIMUM PERMISSIBLE IF CONDITIONS OF-i3 M NO. OF CHANNELS OPERABLE DEGREE OF BYPASS COLUMN 3 OR 4 E E NO.

FUNCTIONAL UNIT CllANNELS TO TRIP CHANNELS REDUNDANCY CONDITIONS

.CANNOT BE MET 22

?. E 3.

AUKILIARY FEEDWATER gg (continued) hk d.

Safety Injection Signal S.I. INITIATING FUNCTIONS AND REQUIREMENT AS IN 1. ABOVE Starts Motor Driven Pumps 3 3 4.

SAFETY RELATED ELECTRICAL BUSES

-~

"U a.

Degraded Voltage (4.16KV) 3/ bus 2/ bus 2/ bus 1/ bus (A05, A%)

l' b.

Loss of Voltage (4.16KV) 2/ bus 1/ bus 1/ bus 1

i l

(A05,A06)

I c.

' Loss of Voltage (480V) 3/ bus 2/ bus 2/ bus Hot Shutdown ***

.I (803 B04) l

'l

    • - Must activate 2 switches simultaneously.
      • - If minimum conditions are not met within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching hot shutdcwn, the unit shall be in cold shutdowit within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of the event causing the unit shutdown.
        • - Declare the associated emergency diesel generator inoperable for the affected bus. 'The applicable Limiting Condition for Operation' (LCO) shall.be entered. Separate LCOs may be entered for the Degraded Voltage and Loss of Voltage functions.

I l

Page 2 of 2-l i

I

_.. _.., ~.., _ _ _ -... _.. _...... -. -..... _ __.-_.. _ -. - -.

. __... _.. _.... _ _.. -..,.~._._..-_..._.._....;.