Forwards Amends 137 & 141 to Licenses DPR-24 & DPR-27, Respectively & Safety Evaluation.Amends Revise Degraded Voltage Relay Setpoints in Table 15.3.5-1
ML20044D054
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/26/1993
From: Gody A
Office of Nuclear Reactor Regulation
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20044D055 List:
References
TAC-M85314, TAC-M85315, NUDOCS 9305170174
Download: ML20044D054 (3)


Text

po uc%[t

~'

UNITED STATES

[$

i j NUCLEAR REGULATORY COMMISSION y

WASHINGTON. D.C. 20565 4001 c

March 26, 1993 Docket Nos. 50-266 and 50-301 Mr. Robert E. Link, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee, Wisconsin 53201

Dear Mr. Link:

?

SUBJECT:

AMENDMENT NOS. 137 AND 141 TO FACILITY OPERATING LICENSE N05. DPR-24 AND DPR-27 (TACS MS5314 AND MS5315)

The Commission has issued the enclosed Amendment Nos. 137 and 141 to Facility Operating License Nos. DPR-24 and DPR-27 for the Point Beach Nuclear Plant, Unit Nos. I and 2.

The amendments revise the Technical Specifications in response to your application dated January 19, 1993.

These amendments revise the degraded voltage relay setpoints in Table 15.3.5-1, revise the actions required if the conditions specified in Table 15.3.5-3, Items 4.a and 4.b are not met, add the bus designations to Tables 15.3.5-1 and 15.3.5-3, and correct typographical errors which were contained in amendments 55 and 60 issued on September 30, 1981.

A temporary waiver of compliance with the conditions in Technical Specifica-tion Table 15.3.5-3, " Emergency Cooling," Item 4.a, ' Degraded Voltage (4.15 kV)," was requested and granted on January 14, 1993. The NRC confirmed the granting of this waiver in a letter to WEPCo dated January 14, 1993. The waiver allowed the continued operation of the plant with non-conservative degraded voltage relay setpoints for the safety buses. This waiver was based, t

in part, on your expressed intent to submit the application for the amendment to the degraded voltage setpoint specification. With the issuance of this l

amendment the temporary waiver of compliance is terminated.

A copy of the Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next biweekly Federal Reaister notice.

Sincerely, 04, 0

./

Anthony T/. Gody, Jr., Project Manager Project Directorate III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 137 to DPR-24 2.

Amendment No. 141 to DPR-27 3.

Safety Evaluation I

cc w/ enclosures:

See next page i

9305170174 930506 PDR-ADOCK 05000266 P

PDR

.~

f[onagjo,,

UNITED STATES y

(

g NUCLEAR REGULATORY COMMISSION g

C WASWNGTON, D. C. 20555 f

Ibrch 26, 1993 Docket Nos. 50-266 and 50-301 Mr. Robert E. Link, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee, Wisconsin 53201

Dear Mr. Link:

SUBJECT:

AMENDMENT N05.137 AND 141TO FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 (TACS M85314 AND M85315)

The Commission has issued the enclosed Amendment Nos.137 and 141 to Facility Operating License Nos. DPR-24 and DPR-27 for the Point Beach Nuclear Plant, Unit Nos. I and 2.

The amendments revise the Technical Specifications in response to your application dated January 19, 1993.

These amendments revise the degraded voltage relay setpoints in Table 15.3.5-1, revise the actions required if the conditions specified in Table 15.3.5-3, items 4.a and 4.b are not met, add the bus designations to Tables 15.3.5-1 and 15.3.5-3, and correct typographical errors which were contained in amendments 55 and 60 issued on September 30, 1981.

A temporary waiver of compliance with the conditions in Technical Specifica-tion Table 15.3.5-3, " Emergency Cooling," Item 4.a, " Degraded Voltage (4.16 kV)," was requested and granted on January 14, 1993. The NRC confirmed the granting of this waiver in a letter to WEPCo dated January 14, 1993.

The waiver allowed the continued operation of the plant with non-conservative degraded voltage relay setpoints for the safety buses. This waiver was based, in part, on your expressed intent to submit the application for the amendment to the degraded voltage setpoint specification. With the issuance of this amendment the temporary waiver of compliance is terminated.

A copy of the Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next biweekly Federal Reaister notice.

Sin

ely, D

Anthony Gody, Jr//, P oject Manager Project Directorate 111-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No.137 to DPR-24 2.

Amendment No.141 to DPR-27 3.

Safety Evaluation cc w/ enclosures:

See next page

f I

v Mr. Robert E. Link Point Beach Nuclear Plant l

Wisconsin Electric Power Company Unit Nos. I and 2 l

cc:

j Ernest L. Blake, Jr.

l Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. Gregory J. Maxfield, Manager i

Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road l

Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin 1

Hills farms State Office Building i

Madison, Wisconsin 53702 l

Regional Administrator, Region III U.S. Nuclear Regulatory Commission j

Office of Executive Director for Operations j

799 Roosevelt Road q

Glen Ellyn, Illinois 60137 l

Resident Inspector's Office U.S. Nuclear Regulatory Commission l

6612 Nuclear Road Two Rivers, Wisconsin 54241 q

i 9

i

=f

}

a

-