ML20044C553

From kanterella
Jump to navigation Jump to search
Notification of Revised Significant Licensee Meeting W/Util on 930325 to Discuss Apparent Violations Identified in NRC Insp Repts 50-498/93-08 & 50-499/93-08
ML20044C553
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/18/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
EA-93-047, EA-93-47, NUDOCS 9303240144
Download: ML20044C553 (2)


See also: IR 05000498/1993008

Text

,

'

pm Rre

UselTED STATES

[.

,%,

NUCLEAR REGULATORY COMMISSION

-

g

,

REGION IV

"

t

611 RY AN PLAZA CW,VE, SUfTE 400

8

AR LINGTON, T EXAS 760118064

{

'....+

WR I B 1993

,

NOTICE OF SIGNIFICANT LICENSEE MEETING (REVISED)

Name of Licensee:

Houston Lighting and Power Company

Name of Facility:

South Texas Project Electric Generating Station,

Units 1 and 2

Ducket:

50-498;50-499

EA No.:

93-047

Date and Time

March 25, 1993

!

of Meeting:

11 a.m.

Location of Meeting:

NRC Region IV, Training Conference Room

Arlington, Texas

Purpose of Meeting:

Enforcement conference to discuss apparent violations

identified in NRC Inspection Report 50-498/93-08;

50-499/93-08

,

'

NRC Attendees:

J. L. Milhoan, Regional Administrator

J. M. Montgomery, Deputy Regional Administrator

A. B. Beach, Director, Division of Reactor Projects

t

(DRP)

.

'

A. T. Howell, Deputy Director, Division of Reactor

Safety (DRS)

S. C. Black, Director, Project Directorate, IV-2,

-

Office of Nuclear Reactor Regulation (NRR)

G. F. Sanborn, Enforcement Officer

-

T. F. Westerman, Chief, Engineering Section, DRS

.

T. F. Stetka, Chief, Project Section D, DRP

l

'

J. I. Tapia, Senior Resident Inspector

M. F. Runyan, Reactor Inspector, DRS

M. A. Satorius, Project Engineer, DRP

Licensee Attendees:

D. Hall, Group Vice President

W. Kinsey, Vice President, Nuclear Generation

T. Jordan, General Manager, . Nuclear Engineering

!

K. Christian, Plant Operations Manager

M. McBurnett, Manager, Integrated Planning and

Scheduling

'

S. Head, Consulting Engineer, Corrective Action Group

(CAG)

U. Patil, Supervising Engineer

I

Approved By:

['

A. Bill Beach, Director

Division of Reactor Projects

9303240144 930318

.

PDR

ADOCK 05000498

0

PDR

fg

lf

-

-

-

-

q

.

..

.

HL&P 03/25/93

-2-

l

!

'

NOTE:

(1)

Attendance by NRC personnel at- the NRC/ licensee meeting should be made

i

known by COB on March 22 via telephone call to Tom Westerman (817/860-

l

8145)

1q

(2)

Due to the nature of the subject matter, this meeting is not open-to

l

attendance by members of the general public.

]l

Distribution:

-!

DMB (IE 45)

1

J. H. Sniezek, DEDR (MS 17G21)

l

H. L. Thompson, DEDS (MS 17G21)

!

T. E. Murley, D/NRR (MS 1201)

i

W. T. Russell, ADT/NRR (MS 12G18)

'l

J. G. Partlow, ADP/NRR (MS 12D9)

!

J. Lieberman, D/0E (MS 7H5)

j

L. J. Chandler, OGC (MS 15B18)

-l

George Dick, Project Manager, NRR

!

OEDO RIV Coordinator (MS 17G21)

!

L. R. Plisco, LPEB/NRR (MS 10A19)

!

J. L. Milhoan, RA

i

J. M. Montgomery, DRA

!

G. F. Sanborn, E0

j

C. A. Hackney, RSLO

l

J. Gilliland, PAO, RIV

j

NRC Attendees

i

RA Secretary

Ann Mattila

l

Division Secretary

j

RIV File

!

!

!

!

!

A

j

RIV:RI 4

C:ES

C:PSd

PAhnk

D:DRSAkJ

D:DRP

MRunyan

TFWesterman

TFStetka

dGIlliland

SJCollins

ABBaach

7 // 1/93

7/f7/93

% /g1/93

3/T]/93

3//)/93

.3 // f /93

)

1

1

f

.

_.

. , . . . _ _ _ ,

._

,_.

_

_

!