ML20044C190

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1993 for Brunswick Steam Electric Plant Units 1 & 2.W/930302 Ltr
ML20044C190
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/28/1993
From: Morgan R, Rumple R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-93-0032, BSEP-93-32, NUDOCS 9303180294
Download: ML20044C190 (7)


Text

-- .. - - -- . -

CD&L

~

. i i

{ayoynafoyey 8 Light Company Brunswick Nuclear. Plant P. O. Box 10429 '

Southport, NC 28461-0429 March 2, 1993 FILE: B09-13510C  !

BSEP/93-0032 l U. S. Nuclear Regulatory Commission i Washington, DC 20555 i Attn: Document Control Desk I

BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND.50-324 +

LICENSE NOS. DPR-71 AND DPR-62 ,

MONTHLY OPERATING REPORT  !

i Gentlemen: i In accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of February 1993. The startup date for Unit 2 has been established per the Integrated Startup Plan dated November 17, 1992. The startup date for Unit 1 ,

has been established per the Integrated Startup Plan dated December 30, 1992.  ;

very truly yours, j/~

i R. E. M6rgan, Plant Manager - Unit 1 Brunswick Nuclear Plant RHR/emr 93-8524 Enclosures cc: Mr. R. A. Anderson Ms. D. M. Aslett Mr. T. C. Bell' Mr.-R. M. Coats Mr. S. D. Ebneter Mr. M. D. Hill ~

Mr. C. S. Hinnant Mr. N. B. Le Mr. C. C. Warren Mr. W. R. Murray [/h Mr. R. G. Oehl' Mr. R. M. Parsons . /

Mr. R. L. Prevatte-Mr. D. B. Waters r i' 180 0 W. F. Yost ~

  1. f 9303180294 930228 PDR ADOCK 05000324 l R PDR j

" ~

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 l

. RUN DATE 03/01/93 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 j RUN TIME 13:19:53 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 FEBRUARY 1993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -10 17 -9 2 -10 18 -9 3 -10 19 -10 4 -10 20 -9 5 -10 21 -10 6 -10 22 -9 7 -10 23 -10 8 -10 24 -9 9 -6 25 -10 10 -5 26 -10 11 -8 27 -10 12 -9 28 -10 13 -8 14 -6 15 -8 16 -9 1.16 - 8

4 CP&L CO

, RUN-DATE PLANT PERFORMANCE DATA SYSTEM PAGE 1 03/01/93 OPERATING DATA REPORT RUN TIME 13:19:55 BRUNSWICK UNIT 1 RPD36-000 i DOCKET NO. 050-0325 OPERATING STATUS COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 i

1. UNIT NAME: BRUNSWICK UNIT 1 NOTES  !
2. REPORTING PERIOD: FEBRUARY 93 l
3. LICENSED THERMAL POWER (MWT) : 2436
4. NAMEPLATE RATING (GROSS MWE): 867.0
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 791.0 l 7.

8.

MAX DEPENDABLE CAPACITY (NET MWE): 767.0 ------------------------------- l IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, i GIVE REASONS- '

l l

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 672.00 1416.00 139848.00 l
12. NUMBER OF HOURS REACTOR CRITICAL .00 .00 87881.32
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE .00 .00 84201.37
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) .00 .00 183021943.70
17. GROSS ELEC. ENERGY GEN. (MWH) .00 .00 60019285.00
18. NET ELEC. ENERGY GENERATED (MWH) -6050.00 -13534.00 57703672.00
19. UNIT SERVICE FACTOR .00 .00 60.21
20. UNIT AVAILABILITY FACTOR .00 .00 60.21 3
21. UNIT CAP. FACTOR (USING MDC NET) -1.17 -1.25 52.44 i
22. UNIT CAP. FACTOR (USING DER NET) -1.10 -1.16 50.26
23. UNIT FORCED OUTAGE RATE .00 .00 16.07
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 6/7/93
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- - - - - - - - -

1.16 - 9 l

i -

4 DOCKET NO. 050-0325 UNIT NAME Brunswick 1 DATE March 1993 COMPLETED BY Ronald Rumole TELEPHONE 919-457-2752 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February. 1993 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEH CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE

  • 93-001 920530 S 672.0 B 4 1-92-12 N/A N/A To complete the scheduled Continued maintenance outage for from previous backlog reduction. Also, month structural inspections continued.
  • This event was previously 92-024.

1: Tyge 2: Reason 3: Method 4: System Code: 5. Comoonent Code F - Forced A- Equipment Failure 1- Manual Instruction for instructions for S - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Recslatory 5- Load reductions IEEE Standard 805-1983, Standard 803A-1983, rest riction 6- Other' per NUREG-1022, per NUREG-1022.

E- Operator Training & Section VI, item 13.b Section VI. Item 13.c License Examination F- Administrative G- Operational error (explain)

H- Other (explain)

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 ,

RUN DATE 03/01/93 APPENDIX D - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 13:19:53 BRUNSWICK UNIT 2 DOCKET NO.- 050-0324 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 FEDRUARY 1993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL  !

(MWE-NET) (MWE-NET) 1 -9 17 -10 f 2 -9 18 -11 3 -9 19 -11  !

, 4 -9 20 -10 5 -8 21 -9 6 -9 22 -7 l

7 -9 23 -8 l t

l 8 -10 24 -11 l

9 -10 25 -10 l 10 -10 26 -9 11 -10 27 -8' 12 -10 28 -9 l

l 13 -10 l 14 -10 15 -9 16 -8 i

I-4 1.16 - 8 l

4 i

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 t

. RUN DKTE 03/01/93 OPERATING DATA REPORT RPD36-000 7 l RUN TIME 13:19:55 BRUNSWICK UNIT 2 ,

DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752 ,

i

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPOPTING PERIOD: FEBRUARY 93
3. LICENSED THERMAL POWER (MWT): 2436
4. NAMEPLATE RATING (GROSS MWE): 867.0
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :

l 10. REASONS FOR RESTRICTION IF ANY:

s THIS YR TO CUMUL MONTH DATE ATIVE j l

i

11. HOURS IN REPORTING PERIOD 672.00 1416.00 151872.00 1 1
12. NUMBER OF HOURS REACTOR CRITICAL .00 .00 92091.38
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE .00 .00 87154.67
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 ,
16. GROSS THERMAL ENERGY GEN. (MWH) .00 .00 184126854.86 i
17. GROSS ELEC. ENERGY GEN. (MWH) .00 .00 59550469.00
18. NET ELEC. ENERGY GENERATED (MWH) -6275.00 -11331.00 57036229.00 l
19. UNIT SERVICE FACTOR .00 .00 57.39 )
20. UNIT AVAILABILITY FACTOR .00 .00 57.39
21. UNIT CAP. FACTOR (USING MDC NET) -1.24 -1.06 47.81
22. UNIT CAP. FACTOR (USING DER NET) -1.14 .97 45.74
23. UNIT FORCED OUTAGE RATE .00 .00 13.51
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 3/28/93
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

l COMMERCIAL OPERATION -------- --------

1.16 - 9

a DOCKET NO. 050-0324 UNIT NAME Brunswick 2

  • OATE March 1993 COMPLETED BY Ronald Rumole TELEPHONE 919-457-2752 UNIT SHUT 00VNS AND POWER REDUCTIONS REPORT MONTH February. 1993 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (S) PREVENT RECURRENCE
  • )3-001 920430 S 672.0 B 4 1 92412 TG XC To complete the scheduled Continued maintenance outage for from previous backlog reduction. Also, month structural inspections continued.
  • This event was previously 92-025.

1: lyge 2: Reason 3: Method 4: System Code: S. Comoonent Code F - Forced A- Equipment Failure 1- Manual Instruction for Instructions for S - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LEO) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983, Standard 803A-1983, restriction 6- Other per NUREG-1022. per NUREG-1022.

E- Operator Training & Section VI. Item 13.b Section VI, item 13.c License Examinatien F- Administrative G- Operational error (explain)

H- Other(explain)

- - - - - - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ - _ .. ___ - - _ - ._ __ _ _ _ __