ML20044C186

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1993 for Callaway Plant Unit 1.W/930310 Ltr
ML20044C186
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/28/1993
From: Campbell W, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2777, NUDOCS 9303180289
Download: ML20044C186 (6)


Text

,

, D-o 4Etucnue March 10,1993 '

, g

~

ll - O2laway Plant -

Nuclear Regulatory Commission j Document ControlDesk Washington,DC 20555 ,

ULNRC- 2777 s

^

Dear Sir:

A DOC}TT NUMBER 50-483  :

CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30  :

MONTIILY OPERATING REPORT FEBRUARY 1993

~

The enclosed Monthly Operating Report for February,1993'is submitted pursuant tA -

section 6.9.1.8 of the Callaway Unit 1 Technical Specifications. -

.W. R. Campbell .

< l' ?h Enclosure cc: Distribution attached .3

\

Z 9302 I;TiMSI 0 = 2882 m

0

- C. : .

m ..,"

. x:

u- '

-l ,_

m&g Adttest Pn Ru 62Q FM MO 65251 J -

4g

. _ n

14  ;

+

... *v I cc distribution for ULNRC-2777 l  !

with enclosures Mr.1. N. Jackiw, Chief 7j Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region III .

799 Roosevelt Road .

- Glen Ellyn,IL 60137 ,

Mr. L. R. Wharton (2 copics) f Ofnce of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission  ;

I White Flint, North, Mail Stop 13E21 1155 Rochille,MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Senice Commission  ;

P.O. Box 360 Jefferson City,MO 65102  :

s

.}

C 4

d P

w ,

$?? - da. _

pc , ,

l. :

y -

DOCKET NO. 50-4fG UNIT NAME CALLAWAY UNIT 1 DATE 3-10-93 COMPLETED BY J. B. McInvale -

TELEPHONE 314/676-8247 PART A OPERATIONS

SUMMARY

'Ihe plant operated at approximately 100% power for the entire month with the following exception:

On 2-9-93 load was reduced to 95% to conduct a test to determine the effect of temperature swings on core axial offset. Full power operation resumed on 2-11-93.

PART B PORV AND SAFETY VALVE

SUMMARY

None w.

'Page I'of.'4

,T

.4~

i

. g ; t.

i

- PART C ' ,

AVERAGE DAILY UNIT POWER LEVEL ,

DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 3-10-93 ,

COMPLETED BY . . J. B, McInvale '

TELEPilONE 314/676-8247 MONTil: FEBRUARY 1993 '

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL' L Ded' (MWe-Net) D31 (MWe-Net)

I 1171 17 1174 2 1174 18 1173 3 1171 19 1172 4 1171 20 1172 5 1174 21 1171 ,

6 1171 22 1175 '

7 1167 23 1173-8 1173 24 1173  !

9 1158 25 1171 10 1112' 26- '1172 11 1116 27 1172 12 1166 28 1174 13 1170 29 14 1172 30 _

15 1172 31 16 '1173 s

t.

[

.Page 2 of 4-- .,

=

hb g,

n

, PART D OPERATING DATA REPORT

  • DOCKET NO. 50-483 .

-4 UNIT NAME CALLAWAY UNIT I DATE 3 10-93 ,

COMPLETED BY J. B. McInvale - -

TELEPIlONE 314/676-8247  ;

OPERA 11NO STATUS (YTD) - (CUM) .

1. REPOR11NG PERIOD. IT.BRUARY 1993 OROSS IlOURS IN REPORTING PERIOD:- 672 1416- 71,821.$

2 CURRENTLY AUTilORIZEDPOWERIIVEL(MW1): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1120 ,

DESIGN ELECTRICAL RATING (MWeNet): 1171

3. POWER IIVELTO WillCil RESTRICTED (IF ANY)(MWe-Net): ,
4. REASONS FOR RESTRICTION (IF ANY):

Tills MONT11 YR TO DAE CUMULA11VE

5. NUMl3ER OF IIOURS REACTOR WAS CRITICAL 672.0 1,416.0 62,793.7
6. REACTOR RESERVE SIIUrDOWN llOURS 0 0 0
7. IlOURS GENERA 1DR ON UNE 672.0 1,416.0 61,471,7 ,
8. UNIT RESERVE SIIUTDOWN IIOURS... 0 0 0

.9. GROSS TIIERMAL ENERGY GENERATED (MWil). . 2,361,386 4,985,182 '206,065,132

10. GROSS ELECTRICAL ENEROY GENERATED (MWII).L 820,942 ~ 1,731,528 70,293,424 - *

' i1. NET Et1CTRICAL ENEROY OlWERATED (MWil) 784,359 1.654,627 ' 66,828,725  !

12. REACTOR SERVICE FACTOR.. 100.0 100.0 87.4
13. REACTOR AVAILA13IUTY FACTOR -. 100.0 100.0 87A
14. UNIT SERVICE FAC10R -- 200,0 1000 85.6
15. UNIT AVAILABILITY FACTUR 100.0 100.0 85.6
16. UNIT CAPACITY FAC1DR (Using MDC) .. 104.2 104.3 - 83,1 'r
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.7 99.S - 79.5 18 UNIT FORCED OLTTAGE RATE..-. 0.0 . 0.0 2.8 -

2

19. SIItTFDOWNS SCIIEDULED OVER NEXT 6 MONTils (TYPE, DATE AND DURATION OF IMCII):
20. IF SIIUT DOWN AT END OF REPORTING PERIOD, ES11 MATE DATE OF STAR 1UP:

I

f.

i

\\

Page 3 of 41:  ;

.-1

. ;s; e.

3. ;;

PART E UNTT S11UTDOWNS AND POWER REDUCTIONS .-

DOCKET NO. 50-483 UNTT NAME CALLAWAY UNIT 1 DATE- 3 10-93 COMPLETED BY LIL McInvale .

TELEPilONE 314/676-8247' REPORT MONTil: TEBRUARY 1993 METilODOF -

TYPE '- SIIUTTINO DOWN F: FORCED DURATION TIIE REACTOR OR -

NO. - DATE S; SCliEDULED (IIOURS) . REDUCING POWER CORRECIBT/ACTIONSCOMMEN"r5

SUMMARY

' REASON METIIOD A: EQUIPMENT FAILL*RE(EXPLAIN) 1: MAN'UAL L B: MAINT.ORTEST . 2: MAN *UALSCRAM -

' C: REFUEUNG' 3: AUTOMATICSCRAM.

D: REGULATORY RESTRICTION 4: OTitER(EXPLAIN)

..E: OPERATORTRAIND'O AND -

UCENSE EXAMINATION .

F: ADMINISTRATION 0: OPERATIONALERROR(EXFIAIN)

- II: OTIIER(EXPLAIN) ,.

Page 4'off4' r m-m. ...%- .ma_aaLcm_. _.._.m ' _- se-.ua ,-a e - ;_wer-ne-+rver-M-7t-W *m." N~d's-+++r4CTTPm