D-o 4Etucnue March 10,1993 '
g ll
- O2laway Plant -
~
Nuclear Regulatory Commission j
Document ControlDesk Washington,DC 20555 ULNRC-2777 s
Dear Sir:
^
A DOC}TT NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT FEBRUARY 1993
~
The enclosed Monthly Operating Report for February,1993'is submitted pursuant tA -
section 6.9.1.8 of the Callaway Unit 1 Technical Specifications. -
.W. R. Campbell.
?h l'
Enclosure cc: Distribution attached
.3
\\
Z I;TiMSI 9302
- C. :
0 = 2882 m
x:
m 0
- u-
-l,_
m&g Adttest Pn Ru 62Q FM MO 65251 J
- 4g n
1 4
- v
+
I cc distribution for ULNRC-2777 l
with enclosures Mr.1. N. Jackiw, Chief 7j Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road.
- Glen Ellyn,IL 60137 Mr. L. R. Wharton (2 copics) f Ofnce of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission I White Flint, North, Mail Stop 13E21 1155 Rochille,MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 Jefferson City,MO 65102 s
.}
C 4
d P
w,
$?? -
da.
pc,
- l. :
y DOCKET NO.
50-4fG UNIT NAME CALLAWAY UNIT 1 DATE 3-10-93 COMPLETED BY J. B. McInvale -
TELEPHONE 314/676-8247 PART A OPERATIONS
SUMMARY
'Ihe plant operated at approximately 100% power for the entire month with the following exception:
On 2-9-93 load was reduced to 95% to conduct a test to determine the effect of temperature swings on core axial offset. Full power operation resumed on 2-11-93.
PART B PORV AND SAFETY VALVE
SUMMARY
None w.
'Page I'of.'4
,T
.4~
i
. g ; t.
i
- PART C '
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 3-10-93 COMPLETED BY.. J. B, McInvale '
TELEPilONE 314/676-8247 MONTil: FEBRUARY 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL' L Ded' (MWe-Net)
D31 (MWe-Net)
I 1171 17 1174 2
1174 18 1173 3
1171 19 1172 4
1171 20 1172 5
1174 21 1171 6
1171 22 1175 7
1167 23 1173-8 1173 24 1173 9
1158 25 1171 10 1112' 26-
'1172 11 1116 27 1172 12 1166 28 1174 13 1170 29 14 1172 30 15 1172 31 16
'1173 s
[
t.
.Page 2 of 4--
hb
=
g, n
PART D OPERATING DATA REPORT DOCKET NO. 50-483
-4 UNIT NAME CALLAWAY UNIT I DATE 3 10-93 COMPLETED BY J. B. McInvale -
TELEPIlONE 314/676-8247 OPERA 11NO STATUS (YTD) - (CUM).
1.
REPOR11NG PERIOD. IT.BRUARY 1993 OROSS IlOURS IN REPORTING PERIOD:-
672 1416-71,821.$
2 CURRENTLY AUTilORIZEDPOWERIIVEL(MW1): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1120 DESIGN ELECTRICAL RATING (MWeNet): 1171 3.
POWER IIVELTO WillCil RESTRICTED (IF ANY)(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
Tills MONT11 YR TO DAE CUMULA11VE 5.
NUMl3ER OF IIOURS REACTOR WAS CRITICAL 672.0 1,416.0 62,793.7 6.
REACTOR RESERVE SIIUrDOWN llOURS 0
0 0
7.
IlOURS GENERA 1DR ON UNE 672.0 1,416.0 61,471,7 8.
UNIT RESERVE SIIUTDOWN IIOURS...
0 0
0
.9.
GROSS TIIERMAL ENERGY GENERATED (MWil)..
2,361,386 4,985,182
'206,065,132 10.
GROSS ELECTRICAL ENEROY GENERATED (MWII).L 820,942
~ 1,731,528 70,293,424 -
' i1.
NET Et1CTRICAL ENEROY OlWERATED (MWil) 784,359 1.654,627 '
66,828,725 12.
REACTOR SERVICE FACTOR..
100.0 100.0 87.4 13.
REACTOR AVAILA13IUTY FACTOR -.
100.0 100.0 87A 14.
UNIT SERVICE FAC10R 200,0 1000 85.6 15.
UNIT AVAILABILITY FACTUR 100.0 100.0 85.6 16.
UNIT CAPACITY FAC1DR (Using MDC)..
104.2 104.3
- 83,1
'r 17.
UNIT CAPACITY FACTOR (Using Design MWe) 99.7 99.S
- 79.5 18 UNIT FORCED OLTTAGE RATE..-.
0.0
. 0.0 2.8 -
2 19.
SIItTFDOWNS SCIIEDULED OVER NEXT 6 MONTils (TYPE, DATE AND DURATION OF IMCII):
20.
IF SIIUT DOWN AT END OF REPORTING PERIOD, ES11 MATE DATE OF STAR 1UP:
I
- f.
i
\\\\
Page 3 of 41:
.-1
- s; e.
- 3. ;;
PART E UNTT S11UTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNTT NAME CALLAWAY UNIT 1 DATE-3 10-93 COMPLETED BY LIL McInvale.
TELEPilONE 314/676-8247' REPORT MONTil: TEBRUARY 1993 METilODOF -
TYPE
'- SIIUTTINO DOWN F: FORCED DURATION TIIE REACTOR OR -
NO. -
DATE S; SCliEDULED (IIOURS).
REDUCING POWER CORRECIBT/ACTIONSCOMMEN"r5
SUMMARY
' REASON METIIOD A: EQUIPMENT FAILL*RE(EXPLAIN) 1: MAN'UAL L B: MAINT.ORTEST
. 2: MAN *UALSCRAM -
' C: REFUEUNG' 3: AUTOMATICSCRAM.
D: REGULATORY RESTRICTION 4: OTitER(EXPLAIN)
..E: OPERATORTRAIND'O AND -
UCENSE EXAMINATION.
F: ADMINISTRATION 0: OPERATIONALERROR(EXFIAIN)
- II: OTIIER(EXPLAIN)
Page 4'off4'
...m
- se-.ua
,-a e - ;_wer-ne-+rver-M-7t-W
- m."
N~d's-+++r4CTTPm r
m-m.
.ma aaLcm.
'