D-o 4Etucnue March 10,1993 '

g ll

- O2laway Plant -

~

Nuclear Regulatory Commission j

Document ControlDesk Washington,DC 20555 ULNRC-2777 s

Dear Sir:

^

A DOC}TT NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT FEBRUARY 1993

~

The enclosed Monthly Operating Report for February,1993'is submitted pursuant tA -

section 6.9.1.8 of the Callaway Unit 1 Technical Specifications. -

.W. R. Campbell.

?h l'

Enclosure cc: Distribution attached

.3

\\

Z I;TiMSI 9302

- C. :

0 = 2882 m

x:

m 0

u-

-l,_

m&g Adttest Pn Ru 62Q FM MO 65251 J

4g n

1 4

  • v

+

I cc distribution for ULNRC-2777 l

with enclosures Mr.1. N. Jackiw, Chief 7j Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road.

- Glen Ellyn,IL 60137 Mr. L. R. Wharton (2 copics) f Ofnce of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission I White Flint, North, Mail Stop 13E21 1155 Rochille,MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 Jefferson City,MO 65102 s

.}

C 4

d P

w,

$?? -

da.

pc,

l. :

y DOCKET NO.

50-4fG UNIT NAME CALLAWAY UNIT 1 DATE 3-10-93 COMPLETED BY J. B. McInvale -

TELEPHONE 314/676-8247 PART A OPERATIONS

SUMMARY

'Ihe plant operated at approximately 100% power for the entire month with the following exception:

On 2-9-93 load was reduced to 95% to conduct a test to determine the effect of temperature swings on core axial offset. Full power operation resumed on 2-11-93.

PART B PORV AND SAFETY VALVE

SUMMARY

None w.

'Page I'of.'4

,T

.4~

i

. g ; t.

i

- PART C '

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 3-10-93 COMPLETED BY.. J. B, McInvale '

TELEPilONE 314/676-8247 MONTil: FEBRUARY 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL' L Ded' (MWe-Net)

D31 (MWe-Net)

I 1171 17 1174 2

1174 18 1173 3

1171 19 1172 4

1171 20 1172 5

1174 21 1171 6

1171 22 1175 7

1167 23 1173-8 1173 24 1173 9

1158 25 1171 10 1112' 26-

'1172 11 1116 27 1172 12 1166 28 1174 13 1170 29 14 1172 30 15 1172 31 16

'1173 s

[

t.

.Page 2 of 4--

hb

=

g, n

PART D OPERATING DATA REPORT DOCKET NO. 50-483

-4 UNIT NAME CALLAWAY UNIT I DATE 3 10-93 COMPLETED BY J. B. McInvale -

TELEPIlONE 314/676-8247 OPERA 11NO STATUS (YTD) - (CUM).

1.

REPOR11NG PERIOD. IT.BRUARY 1993 OROSS IlOURS IN REPORTING PERIOD:-

672 1416-71,821.$

2 CURRENTLY AUTilORIZEDPOWERIIVEL(MW1): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1120 DESIGN ELECTRICAL RATING (MWeNet): 1171 3.

POWER IIVELTO WillCil RESTRICTED (IF ANY)(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

Tills MONT11 YR TO DAE CUMULA11VE 5.

NUMl3ER OF IIOURS REACTOR WAS CRITICAL 672.0 1,416.0 62,793.7 6.

REACTOR RESERVE SIIUrDOWN llOURS 0

0 0

7.

IlOURS GENERA 1DR ON UNE 672.0 1,416.0 61,471,7 8.

UNIT RESERVE SIIUTDOWN IIOURS...

0 0

0

.9.

GROSS TIIERMAL ENERGY GENERATED (MWil)..

2,361,386 4,985,182

'206,065,132 10.

GROSS ELECTRICAL ENEROY GENERATED (MWII).L 820,942

~ 1,731,528 70,293,424 -

' i1.

NET Et1CTRICAL ENEROY OlWERATED (MWil) 784,359 1.654,627 '

66,828,725 12.

REACTOR SERVICE FACTOR..

100.0 100.0 87.4 13.

REACTOR AVAILA13IUTY FACTOR -.

100.0 100.0 87A 14.

UNIT SERVICE FAC10R 200,0 1000 85.6 15.

UNIT AVAILABILITY FACTUR 100.0 100.0 85.6 16.

UNIT CAPACITY FAC1DR (Using MDC)..

104.2 104.3

- 83,1

'r 17.

UNIT CAPACITY FACTOR (Using Design MWe) 99.7 99.S

- 79.5 18 UNIT FORCED OLTTAGE RATE..-.

0.0

. 0.0 2.8 -

2 19.

SIItTFDOWNS SCIIEDULED OVER NEXT 6 MONTils (TYPE, DATE AND DURATION OF IMCII):

20.

IF SIIUT DOWN AT END OF REPORTING PERIOD, ES11 MATE DATE OF STAR 1UP:

I

f.

i

\\\\

Page 3 of 41:

.-1

s; e.
3. ;;

PART E UNTT S11UTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-483 UNTT NAME CALLAWAY UNIT 1 DATE-3 10-93 COMPLETED BY LIL McInvale.

TELEPilONE 314/676-8247' REPORT MONTil: TEBRUARY 1993 METilODOF -

TYPE

'- SIIUTTINO DOWN F: FORCED DURATION TIIE REACTOR OR -

NO. -

DATE S; SCliEDULED (IIOURS).

REDUCING POWER CORRECIBT/ACTIONSCOMMEN"r5

SUMMARY

' REASON METIIOD A: EQUIPMENT FAILL*RE(EXPLAIN) 1: MAN'UAL L B: MAINT.ORTEST

. 2: MAN *UALSCRAM -

' C: REFUEUNG' 3: AUTOMATICSCRAM.

D: REGULATORY RESTRICTION 4: OTitER(EXPLAIN)

..E: OPERATORTRAIND'O AND -

UCENSE EXAMINATION.

F: ADMINISTRATION 0: OPERATIONALERROR(EXFIAIN)

- II: OTIIER(EXPLAIN)

Page 4'off4'

...m

- se-.ua

,-a e - ;_wer-ne-+rver-M-7t-W

  • m."

N~d's-+++r4CTTPm r

m-m.

.ma aaLcm.

'