Informs That Licensee Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWR, Acceptable W/Listed Reasons
ML20044B916
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/09/1993
From: Stephen Dembek
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
References
GL-92-04, GL-92-4, TAC-M84284, NUDOCS 9303120190
Download: ML20044B916 (4)


Text

  • a p %q

[*

UNITED STATES

~

n 3

,i NUCLEAR REGULATORY COMMISSION o

WASHINGTON D.C. 200G5

\\,,,,, +#

March 9, 1993 Docket No. 50-354 Mr. Steven E. Miltenberger Vice President ano Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

RESPONSE TO GENERIC LETTER 92-04 " RESOLUTION OF THE ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BOILING WATER REACTORS," HOPE CREEK GENERATING STATION (TAC NO. M84284)

This letter acknowledges receipt of your response to Generic latter (GL) 92-04, dated September 24, 1992, and January 7, 1993.

GL 92-04 was issued by letter dated August 19, 1992, to all operating Boiling Water Reactor (BWR)

Licensees.

GL 92-04 requested licensees to promptly assess the impact on their facilities of potentially erroneous level indication due to non-condensible gases, and to implement compensatory measures and long term corrective actions as necessary.

We find acceptable:

(1)

Your review and acceptance of the BWR Owners' Group (BWROG) generic analysis as being applicable to the Hope Creek Generating Station.

(2) Your endorsement of the BWROG commitment, regarding schedule and plans for actions to address postulated errors in PWR water level instrumentation.

(3)

Your endorsement of the BWRb;'s Emergency Procedures Committee guidance.

We also understand that you have sensitized your operators to the potential errors consistent with the BWROG guidance.

(4) Your comitment to implement the longer term BWROG finding resulting from their experimental and analytical programs on a schedule to be provided to the NRC after the BWROG work is complete.

On October 23, 1992, the BWROG approved refined operator guidance developed by the Emergency Procedures Committee, sent to your Operations Superintendent on 9303120190 93o3o9 fDR ADOCK 05000354 g, y q p fT9TFD {#{ %"

PDR Muhpn L UROEAC al W

Mr. Steven E. Miltenberger March 9, 1993 1

October 16, 1992, for response to instrument errors' due to non-condensible gases. We feel that this guidance provides appropriate information for operators to adequately identify and deal with potentially inaccurate RPV level instrumentation, and expect that this or equivalent guidance, has been incorporated into your station operations.

We understand that you will implement modifications at the Hope Creek Generating Static) your assessment of the BWROG program indicates that modifications are necessary to ensure level instrumentation is of high functional reliability.

It is our understanding that you will provide a response, in accordance with GL 92-04, after assessing the results of the BWROG long-term program, stating what long-terin corrective actions you plan to implement and a schedule to complete these actions.

Should you have any ques' ms, please contact me at (301) 504-1422.

Sincerely,

/S/

Stephen Demtak, Project Manager Project Directorate I-2 l

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION (Docket 1 File NRC & Local PDRs PDI-2 Reading SVarga JCalvo CMiller SDembek.

M0'Brien RJones JClifford OGC ACRS(10)

EWenzinger, RGN-I JWhite, RGN-I l

  • Previously Concurred 0FFICE PDI-;2'/Lk PDJ-2/PM SRXB*

PDI-2/D NAME lbBhien sber$hieTr'b' RJones CMi k DATE

  1. )/k/93 3/9/93 03/08/93 3/7/93 0FFICIAL RECORD COPY-DOCUMENT NAME: HC84284. GEN 1

?,.

a Mr. Steven E. Miltenberger March 9, 1993 s.c October 16, 1992, for response to instrument errors due to non-condensible i

gases. We feel that this guidance provides appropriate information for operators to adequately identify and deal with potentially inaccurate RPV level instrumentation, and expect that this or equivalent guidance, has been incorporated into your station operations.

We understand that you will implement modifications at the Hope Creek Generating Station if-your assessment of the BWROG program indicates that modifications are necessary to ensure level instrumentation is of high functional reliability.

It is our understanding that you will provide a response, in accordance with GL 92-04, after assessing the results of the BWROG long-term program, stating what long-term corrective actions you plan to implement and a schedule to complete these actions.

Should you have any questions, please contact me at (301) 504-1422.

Sincerely, Stephen Dembek, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page

g 4

Mr. Steven E. Miltenberger Hope Creek Generating Station Public Service Electric & Gas Company cc:

M. J. Wetterhahn, Esquire Mr. J. A. Isabella Winston & Strawn MGR. - Generation Department 1400 L Street, N.W.

Atlantic Electric Company Washington, DC 20005-3502 Post Office Box 1500 1199 Black Horse Pike-Pleasantville, New Jersey 08232 R. Fryling, Jr., Esquire Law Department - Tower SE Richard Hartung 80 Park Place Electric Service Evaluation Newark, New Jersey 07101 Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Hope Creek Resident Inspector Newark, NJ 07102 U.S. Nuclear Regulatory Commission Drawer I Lower Alloways Creek Township Hancocks Bridge, New Jersey 08038 c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Mr. S. LaBruna Hancocks Bridge, NJ 08038 Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. J. J. Hagan General Manager - Hope Creek Operations Hope Creek Generating Station P.O. Box 236-ilancocks Bridge, New Jersey 08038

+

Mr. Frank X. Thomson, Jr., Manager Licensing and Regulation Nuclear Department

_ i P.O. Box 236 Hancocks Bridge, New Jersey 08038 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, New Jersey 08625-0415 v