Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P5381999-04-14014 April 1999 Ack Receipt of Re Request for Exception to App J. Intended Correction Would Need to Be Submitted as Change to TS as Exceptions to RG 1.163 Must Be Listed in Ts,Per 10CFR50,App J ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record ML20205P0651999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Results of PPR Used by NRC Mgt to Facilitate Planning & Allocation of Insp Resources 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205J3281999-04-0101 April 1999 Discusses Arrangements Made on 990323 for NRC to Inspect Licensed Operator Requalification Program at Oyster Creek Nuclear Generating Station During Week of 990524 ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207F0331999-03-0404 March 1999 Forwards Insp Rept 50-219/98-12 During Periods 981214-18, 990106-07 & 20-22.Areas Examined During Insp Included Implementation of GL 89-10 & GL 96-05.No Violations Noted ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny 1999-09-30
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20118A6541992-09-14014 September 1992 Responds to 920914 Discussions Re Live Loggerhead Sea Turtle Taken at Facility Last Wk.Formal Consultation W/Natl Marine Fisheries Svc Necessary.Applicable Regulations Covering Consultation Process Encl ML20044B3761990-05-0707 May 1990 Forwards 900506 Resolution Requiring That Util Take Measures to Alleviate Shoaling of South Branch of Forked River ML19332E8451989-11-22022 November 1989 Expresses Appreciation for Opportunity to Meet at Plant on 891024.Meeting W/Nrc on full-term OL Issue Planned ML19327C0491989-11-0202 November 1989 Responds to 891019 Ltr & Documents Discussion of Various Issues Raised During 891024 Visit to Plant.Util Fully Aware of NRC Requirements & Obligation ML20155E8671988-05-31031 May 1988 Forwards Endorsement 129 to Nelia Policy NF-164 & Endorsement 106 to Maelu Policy MF-44 & Amended Page 2 to Worker Certificates NW-78 & MW-18,changing & Adding Name of Gpu Nuclear Corp,Respectively ML20210H3661987-02-0505 February 1987 Forwards Errata Sheet Identifying Errors Made in 1986 Quarterly Woodborer Repts ML20204J3481985-04-12012 April 1985 Forwards NPDES Discharge Monitoring Rept,Mar 1985. Corrected Rept for Jan 1985 Also Encl.Feb 1985 Rept Should Be ML20107J5731985-02-19019 February 1985 Forwards 850207 NPDES Noncompliance Notification & Discharge Monitoring Rept for Jan 1985 ML20106C3661984-10-10010 October 1984 Forwards NPDES Discharge Monitoring Rept for Sept 1984. No Noncompliances Noted W/Max or Min Effluent Limitation During Reporting Period ML20098A1631984-09-11011 September 1984 Forwards NPDES Discharge Monitoring Rept for Aug 1984. Comments & Rept of Noncompliance W/Conditions of NPDES Encl ML20093D2811984-07-10010 July 1984 Forwards NPDES Discharge Monitoring Rept,June 1984. Detailed Comments Encl ML20079F4141984-01-0404 January 1984 Requests Authorization to Chlorinate Main Condenser Sys & Discharge Total Residual Chlorine at Up to 0.20 Mg/L from Sys as Measured at Point of Discharge to Receiving Waterway for Up to 12 H/Day.Technical Justification Encl ML20039C2501981-11-30030 November 1981 Forwards Semiannual SNM Status Rept.Withheld (Ref 10CFR2.790) ML19309C8591980-03-26026 March 1980 Forwards Fish Kill Associated W/800105 Outage at Facility. ML19262A1141979-08-21021 August 1979 Forwards Resolution by Ocean County Nj Board of Chosen Freeholders Asking Us Congress to Fund Continuous Radiological Monitoring at Facility ML20091Q8681969-09-0808 September 1969 Expresses Deep Regret for Delay in Responding to Re Nuclear Power Plant on Oyster Bay 1992-09-14
[Table view] |
Text
--
f.~
(fi <
1
~'
$ "O
~*
- f.
- l FORKED RIVER CIVIC ASSOCIAT10.i 1413 Hilo Bay Dr.
f Forked River, N.J. 08731 I May 7, 1990 L:
I Oyster Creek Nuclear Generating Station PO "Jox 388 t
Forked River, N.J. 08731 L
- u.
Gentlemen:
The. enclosed resolution was passed unanim'ously at a meeting held by the civic assocation on May 6, 1990.
It is our hope that you will fulfill your obligation to dredge the soudt branch of the river, the south side of the river, and the adjacent lagoons, now that the courts have affirmed the rights of the riparian owner, Mr. Pearl.
This project has been delayed for almost five years, and boat and property owners find it extremely difficult to navigate at low tide. Swimming, because of the depth of silt, is an unpleasant', and almost impossible accomplishment from the water-front-properties.
We would appreciate your prompt consideration of this request.
Please advise us as to your plans so that we may inform our membership.
Sincerely, Ray Taylor, President (609) 693-4697 L
9007190026 900507 '.
gDR ADOCK0500p{j9 gg2 j
'I o ' \
wm b pu.
, a s ..
(.6- [# ,
{
,r . -
at H
3 o.,'S 6
E,' ;
4 1
is -
p' MAIL OR PHONE TheLForked River Civic Association Resolution-was sent to the following: [
6 ^r^ lb , l e = ,
Uh/lhenatorLeonardConnors
" 00 Assemblyman Jeffrey Moran }
A!b,; Assemblyman Christopher connors l
' 620. W. Lacey Road j
'C ' Forked 3 River, N.J. 08731 (609)693-6700 ;
. ?
?
i ', n* .
$6 ., NJ DEP- Div.of Coastal' Resources .;
NpL (" : John Weingart, Director ~*
4/ .
CNJ401-5 Station Plaza- 1 u 501 E. State St., Floor 2 '
M P ITrenton, N.J. 08625- (609)292-2795 l r
hs n@ i \ i 11 ' Nuclear. Regulatory Commission t
Q17 EPubli~cEAffairs Office
""LWashington, D.C. 20555 - (301) 492-0420
, i
'ArmyiCorps of= Engineers *
'2nd=--84 chestnut St. l Philadelphia,'Pa, 19106 _
i I 1 Assurance Standards.&: Operational Safety Branch
< Nuclear Power-Development g LNuclear Energy, Department of Energy ,
7 >
' Washington, D.C. 20545 j a: ,
b Board of Public' Utilities: J 7& .1100?Raymond Blvd.
", , !J Nawark, N.'J. 07102 (201)648-3410' i
, i
~~ .;
. 0yster Creek' Nuclear Generating Station i
, POl Box =388 i Forked 4 River,;N.J;'08731 :
' FORKED RIVER CIVIC ASSOCIATION _ Ray Taylor,. President 693-4697 .
' Mary. Ann Seely, Treasurer 693-6798 (call. for-add,1. info) -
Lee Thorn, member 693-9569 Jean- Burnett, "
.693-8703 'l l
)
L i
5 i
1 t
k
- [ f ;
$, g l
RESOLUTION .,.
(,, .
E WHEREAS, the Forked River, then the south branch of t orEed River serves as the intake canal for the Oyster Creek Nuclear Pbwer' Plant; and WHEREAS, severe shoaling of the Forked River, the south branch of the ,
- - Forked River, and it's adjacent lagoons has ocurred as a result of the L continual force of the intake of water from Barnegat Bay; and -
t- l WHEREAS, this shoaling has ruined the recreational value of waterfront properties of homeowners living in Forked River Beach by impeding L
L navigation and swimming; and {
WHEREAS, on four occasions during the winter of 1990, the Oyster Creek [
Nuclear Power Plant has shut down due to an insufficient flow of water l traversing the south branch of th, Forked River; and :
+ WHEREAS, a recent court decision affirms the r'ights of primary riparian [
owner, Mr. Charles Pearl; and NOW, HEREFORE BE IT RESOLVED BY the Forked River Civic Association, that JCP&L take~ measures-to remediate the shoaling of the south branch of the Forked River, it's adjacent lagoons and the south side of the ~,
Forked River leading to Barnegat Bay; [
BE IT FURTHER RESOLVED that copies of this resolution be sent to: ,
-NJDEP, NRC, Army Corp of Engineers, US Dept.-of Energy, NJ BPU, ,
and the Township of Lacey, as well as Senator Leonard Connors, Assemblyman Jeffrey Moran, and Assemblyman Christopher Connors, and the media.
CERTIFICATION I, Raymond Taylor, President of the Forked River Civic Association, -
hereby testify that the above is a true copy of a resolution adopted unanimously, by the general membership of the Forked River-Civic Association at a meeting held on May 6, 1990.
1
. u s % Ost /
Raym 'raylor, P sid Date bA Forked River Civic Association r
-- n. ,,.
4 W 4
) '
JCP&L nmstpay to dredge lagoon
" By Susan Decker of Forked River Beach.
- The township wanted to take Sto// Writer ,
possession of the water to allow
. TOMS RIVER - If Jersey JCP&L to dree:ce.
Central Power & Light Co. }{uber said that all rights wants to dredge the south that Pearl did not specifically branch of the Forked River,it's deed away still belonged to him.
. going to have to pay for the Including.those in the Forked e privilege. River.
Superior Court Judge Wii. Pearl sold his rights to about-Ilam H. Huber has ruled that 15 township developer Charles tam, edofownership the lots. PifT of themaid.
rna- He re.
Pearl owns most orthe rights to
'" the water in five lagoons andlago jority of rights in the five ns and the riparian grants E portions of the forked River, fronting sections C4. C1. E and Nc:~
JCP&L wanted to dredge the D of the Forked River Beach de-lagoons and the river to correct
- h. ' shoaling caused by the Oyster Y',lopment, she said, Right now.
d Creek Generating Station owns that land., Charles Township At- Pearl iEC drawing in water as a coolant. 8Ph'" 8 **'d-
'Y The' nuclear plant draws in ! U'n"less (JCP&Li,can work out 55 UU water from the south branch at a deal, h cant re et M ,
tremendous pressure, causing large sand bars.
,ou p(
River. It's a shame.'
, ]g 95
- Pearl stopped them, saying Secare said the township may e the electric company did, not appeal the ruling to the Ap.
have the right to dredge private pellate Division.
waters- PifT said Pearl has said he L.!.) Linda PifT, his, lawyer, said would be willing to sell an ease-() . Pearl was worried that he ment or the actual rights 'o would be' held responsible for JCP&L
( l l
any accidents or damage caused James lawney, a spokesman 4' ' by the dredging. . (or JCP&L. said the company ,
l Raymond Taylor, a lagoon
- has not seen Huber's decision l
front owner, sued. claiming he and cannot form any plana to l
was given the right to the land possibly buy the rights until e under the water by his home then.
l when he bought it. Huber dismissed a third.
l Lacey Townsb4 sided with party suit by Pearl against
. r ;t, wmending that Pearl .JCP&L, saying Pearl could not l gave up his right to the riparian sue the company for infringing l grants for the south branch of on private property until the the Forked River.as part o'f his company actually did some-
. l
- site plan appreval for sections - thing.
-- _. a . - = > - _ _ _ __ _______ _ __