ML20044B290

From kanterella
Jump to navigation Jump to search

Ack Receipt of 900629 Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Although Technical Review of Response Not Yet Performed,Action on Bulletin Considered Complete
ML20044B290
Person / Time
Site: Hatch  
Issue date: 07/16/1990
From: Crocker L
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
IEB-88-010, IEB-88-10, TAC-71305, TAC-71306, NUDOCS 9007180299
Download: ML20044B290 (2)


Text

f:

p r

2 A

I Docket Nos 50-321 July 16, 1990 50-366 l

Mr. W. G. Hairston, !!!

Senior Vice President-Nuclear Operations Georgia Power Company P.O.

Box 1295 Birmingham, Alabama 35201 i

Dear Mr. Hairston:

SUBJECT:

RE ONSE TO NRC DULLETIN 88-10, NONCONFORMING MOLDED-I CI CIRCUIT DREAKERS, FOR THE EDWIN 1. HATCH NUCLEAR PL..NT, UNITS 1 AND 2 (TACS 71305 AND 71306)

Thank you for your letter of June 29, 1990, providing the final response to NRC Dulletin 88-10 for the Hatch Nuclear Plant.

The information provided in the June 29 letter completed the response to all Dulletin 80-10 items.

A detailed technical review of your response has not been performed.

However, the area may be su bj ec t to inspection at a later date.

For the present, we consider this action to be

[

complete.

l Please call me 11 you have any questions.

Sincerely, i

i-t Lawrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects-I/II e

Of fice of Nuclear Reactor Regulation cca See next page DISTRIBUTION:

Docket File.'l S.

Varga 14-E-1 O G C. (f /d. onl )

y q

NRC PDR G. Lainas 14-H-3 E Jordan Local PDR R.

Ingram 9-H-3 t)tes (so) ff PDII-3 Reading L.

Crocker 9-H-3 Hatch Reading L.

Reyes Reg. II r.

!)

p@RIngram DII-3 LA PDII-3:PM PDII-3 D LCrocker DMatthews 7 / \\H90 7/lI/90 7/$/90 I)f2i)I 90071eO299 900716

-PDR ADOCK 03000321 g\\O a

FDC

F~

o

.a E'

i i

Mr.

W.

G. Hairston, !!!

Edwin I. Hatch Nuclear Plant t

Georgia Power Company Unit Nos. I and 2 CCI Mr. Crnest L.

Blake, Jr.

Mr. R.

P. Mcdonald Shaw, Pittman, Potts Executive Vice President and Trowbridge Nuclear Opeations 2300 N Street, N.W.

Georgia Power Company Washington, D.C.

20037 P.O. Box 1295 Birmingham, Alabama 35201 Mr. J.

T.

Beckham i

Vice President - Plant Hatch Mr. Alan R. Herdt, Chief Georgia Power Company Project Branch #3 P.O.

Box 1295 U.S.

Nuclear Regulatory Birmingham, Alabama 35201 Commission 101 Marietta Street, Suite 2900 Mr.

S.

J.

Bethay Atlanta, Georg4a 30323 Manager Licensing - Hatch Goergia Power Company Chairman P.O.

Box 1295 Appling County Commissioners Birmingham, Alabama 35201 County Courthouse Ba.wley, Georgia 31513 Mr.

H.

C. Nix General Manager, Nuclear Plant Goergia Power Company Route 1 Box 439 Baxley, Georgia 31513 Resident Inspector U.S.

Nuclear Regulatory Commission Route 1, Box 725 Baxley, Goergia 31513 Regional Administrator, Region Il L

U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H.

Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205. Butler Steet, S.E.,

Suite 1252 Atlanta, Georgia 30334