Advises That 900531 Rev 17 to Plant Security,Contingency & Training & Qualification Plans Acceptable.Remaining Change That Refs Review of Rev 16 Re Placement of Temporary Structures Considered Enhancement to Security Program
ML20044B191
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/09/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 9007180074
Download: ML20044B191 (3)


Text

hf g l

I

+

+

.m In Reply Refer To::

, Docket:

STN 50-482 e

/ Wolf-Cre'e> Nuclear Operating Corporation ATTN: Bart D. Withers President'and Chief Executive Officer i

LP.O. Box.411 Burlington, Kansas 66839 q

h Gentlemen:

This' acknowledges'the-receipt of your letter dated May' 31, 1990, by which you transmitted-Revision 17 to the Wolf Creek Security Plan,-Contingency Plan, and Training and Qualification Plan.

The regional security staff have reviewed the i

1.

information. contained in Revision 17 and have determined that Revision 17 is e

consistent with the provisions of'10 CFR 50.54(p) and is therefore acc2ptable

- for' inclusion in' the plan.

. lq LThe staff recognizes that the majority of this plan submission is in response l

.to. comments ^made;during the review of Revision 16. The remaining change that.

references the review to ensure that the placement of temporary structures will not adversely impact on_'the. security requirements, is an enhancement.to the plan and the effectiveness of the security program.-

The enclosures;to your. letter contain Safeguards-Information which is required to be' protected from unauthorized disclosure by 10 CFR 73.21 and is being withheld from public. disclosure.

i Sincerely, a

Original Sist.ed Ly L

i i

Samuel J. Collins, Director Division of Reactor Projects i

cc:

Wolf Creek Nuclear Operating Corp.

ATTN:' Gary Boyer, Plant Manager P.O. Box 411' Burlington, Kansas 66839

~Shaw, Pittman, Potts & Trowbridge t

' ATTN:. Jay Silberg, Esq.

1800'M Street, NW Washington,-D.C.

20036

  • RIV:SEPS C:SEPSM D:DRSSh 00@111ns AI 90-199 ABEarnest/ch DAPowers ABBeach JC6

/ /90 7 /3 /90 7 N /9 f

/W f

  • Previously Concurred.

4 905'718'0074 900709

~

\\

PDR ADOCK 05000482 F

PDC i

RGO/

l

~

~

^

+.c

^

6 y

q j%

b f

.c

~ Wolf' Creek Nuclear: '

q,

Operating Corporation

,j q

l Public. Service Commission ATTN: Chris.R. Rogers, P.E.

s Manager,; Electric' Department P.O. Box 360 J

~ Jefferson City, Missouri 65102'-

U.S. Nuclear Regulatory Commission

~ ATTN:. Regional Admin.istrator, Region III' j

, 9

.799 Roosevelt Road T

Glen _Ellyn, Illinois
60137 l

y Wolf Creek Nuclear-Operating Corp.

-ATTN: Otto Maynard,: Manager J

Regulatory. Services-3 P.O. Box 411!

Burlington, Kansas-66839'

>s Kansas Corporation Commission ATTN:-' Robert Elliot, Chief Engineer i

Utilities Division i4th Floor ; State:Gffice Building =

. i Topeka, Kansas :66612-1571 g

Office:of the Governor State;of Kansas Topeka, Kansas.'66612; Attorney General 1st Floor:-!The Statehouse.

. Topeka',- Kansas: 66612 1

Chairman,' Coffey County Commission 9

Coffey County Courthouse g#

Burlington,-Kansas 66839 1

Kansas Department of Health

.and Environment

Bureau of" Air Quality & Radiation

~~!L

. Controit

ATTN
Gerald Allen, Public Health. Physicist Division of Environment Forbes Field Building 321 Topeka, Kansas 66620

.U.S. Nuclear Regulatory Commission y

. ATTN: Senior Resident Inspector P10. Box;311

-Bu'rlington, Kansas 66839 c

. I i -l si f (-

.m.

p.4 Wolf Creek Nuclear Operating Corporation U.S. Nuclear Regulatory Commission ATTN:

Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, lexas 76011 bec w/nonsafeguards portion of letter dated May 31, 1990:

DMB (RG01)

DRP B. Beach, uxSS Security inspector Section Chief, SEPS Section Chief DRP/D Resident Inspector i

Christy Moore, RSGB/NRR RITS Coordinator 50.54(p) Book SEPS

curity File Official Security File RIV File Project Engineer, DRP/D DRS MIS
0. Pickett, NRR Project Manager Leah Tremper, LFDCB

.; 4 :

. _n W$LF CREEK {=+=V'4 NUCLEAR OPERATING CORPORATION i

[n"d" May 31,1990.

'~

ET 90-0084 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk COPY NO u-na-s 1

Mail Station P1-137 Washington, D..C. 20555

~

l

Subject:

Docket No. 50-482: Revision 17 to the Wolf Creek Security Plan Gentlemen:

The. purpose. of this letter is'to submit one original and three copies of

< Revision 17 to the Wolf Creek Generating Station (WCGS) Physical Security Plan, Safeguards Contingency Plan,- and Security Training and qualification Plan..

These changes to the security plans are being submitted pursuant to 10 CFR 50.54(p).. Attachment 1 describes the-changes being made by this-revision. Attachment 2 contains the, revisions to the security plans.

, contains Safeguards'Information in accordanc.e with 10 CFR.73.21 and therefer's should be withheld from public disclosure.

This letter and J

Attachment' 1 v'.en-separated 'from Attachment 2 do not contain Safeguards',

- Information and should be handled ;as. decontrolled.

m.,;

.' Acknowledgment. of receipt of thi.e letter by returning the enclosed ;

x-safeguards transmittal form would be appreciated.

l Very.truly yours, Forrest T. Rhode's' 3

Vice. President Engineering & Technical Services.

FTR/jra

^"

Attachment:

1) Description of Changes NC OSURES H N
2) Revision 17 to Security Plans THIS DOCUMENT AS DECONTROLLED.

cc D. A. Powers (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/o l'

D. Persinko (NRC), w/o R. F. Skelton (NRC), w/a M. E. Skow (NRC), w/o i

,, 4,n

?

Q

/] y Sou 411/ Swengton, KS e6s30 / Phone: (316) 3644s31 <

l

/

ansess t

_ci EnWoyw smCNET

/' /

--