ML20044B158
| ML20044B158 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 07/03/1990 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20044B159 | List: |
| References | |
| NUDOCS 9007170450 | |
| Download: ML20044B158 (2) | |
See also: IR 05000271/1990005
Text
W" i ',
3
..
>
s
- -
p
?JUL 0 31990
t
Docket.No.' 50-271
~ Vermont' Yankee Nuclear Power Corporation
-ATTN:
Mr. Warren P. M_urphy ~
1
3 -
.
Senior Vice President, Operations
I
"
_RD'5, Box 169
Ferry Road-
.Brattleboro,_-Vermont ;05301;
Gentlemen:
i
Subjecti Inspection _No. 50-271/90-05
This letter refers _to the routine safety inspection conducted by Mr. Leonard-
.!
Cheung of' this office on May 29'to June 1,1990 at the Vermont Yankee Nuclear
Power Station. During_this inspection, we reviewed activities authorized by
3
NRC License No. DRP-28.
Mr. Cheung discussed the finding of'the inspection
l
. with Mr. D. Reid of your. staff at the conclusion of the inspection'.
In addi-
-
l
-
. tion, Mr. Cheung discussed these issues with Mr. Wanczyk of your staff in a
i
' subsequent ' telephone _ discussion on June 20, 1990.
i
I
,
Areas examined-during_this inspection included your corrective actions associated--
'v
with the deficiencies identified during previous equipment qualification'
inspections and a maintenance' team inspection. These activities are described
4
'
_ in the NRC Regioc-.I Inspection Report which is enclosed with-this letter. -Within
'
these areas, the u spection consisted of selective examinations-of procedures-
a
and. representative . ecords, _ interviews with personnel, and observations by the
!
._i n spec tor.-
-
+
1Your corrective actions for one violation and four unresolvediitems were. found
.to_be acceptable and the issues are closed,
-
i
No~ reply _to this letter is required.
Your cooperation with us on this subject
<
is~ appreciated.
',
!
Sincerely,
' Ort.;inal Simaa ny
Jacque P,D ur
'I
Jacque P. Durr, Chief
Engineering Branch
,
Division of Reacto Safety
-
Enclosure:
NRC Region I Inspection Report No. 50-271/90-05
OFFICIAL RECORD COPY
IR VY 90-05 - 0001.0.0
..
9007170450 900703
07/03/90
\\\\
-
ADOCK 05000271
)
'
,O
y.9l
l
,
L
n
- - -
-
-
. t.
p
'
'JUL 0 3 - 1990
-
.
V'ermont Yankee' Nuclear Power Corporation
2
'
'
> . '
.
i
cc w/ enc 1: .
!
J. Weigand, President and Chief Executive Officer
J.-Pelletier, Vice President Engineering
'
O. Reid; Plant-Manager-
.
J...DeVincentis, Vice President, Yankee Atomic Electric Compar.y
e
'L. Tremblay, Licensing Engineer, Yankee Atomic Electric Company
.;
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
'
Vermont Yankee Hearing Service List
Public Document Room.(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector _(w/SGI)
'
i
State of New Hampshire, SLO Designee
State of Vermont, SLO Designee
Commonwealth of Massachusetts, SLO Designee
bec w/ encl:
'
Region I. Docket Room (with concurrences)
-Management Assistant, DRMA (w/o enc 1)
R. Bellamy, DRSS!
<
'J. Johnson, DRP'
J. Rogge, DRP
.
,.
-H.- Eichenholz, SRI - Vermont Yankee
.
T. Koshy, SRI - Yankee Rowe
'
M.. Conner, SALP Reports Only
K. Abraham, PA0 (20) SALP. Report and (2) All Inspection Reports
J. Caldwell,'EDO
-
M. Fairtile, NRR
S. Chaudhary, DRS
.
t
lQ
&
&
RI:DR b
RI:DRS
RI:DRS
Cheung/geb/rw
Anderson
Durr
06M/90
06/;4/90
Og/.3 /90
0FFICIAL RECORD COPY
IR VY 90-05 - 0002.0.0
06/25/90
(
.