Forwards Safety Insp Rept 50-271/90-05 on 900529-0601. Corrective Actions for One Violation & Four Unresolved Items Acceptable
ML20044B158
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/03/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20044B159 List:
References
NUDOCS 9007170450
Download: ML20044B158 (2)


See also: IR 05000271/1990005

Text

W" i ',

3

..

>

s

-

p

?JUL 0 31990

t

Docket.No.' 50-271

~ Vermont' Yankee Nuclear Power Corporation

-ATTN:

Mr. Warren P. M_urphy ~

1

3 -

.

Senior Vice President, Operations

I

"

_RD'5, Box 169

Ferry Road-

.Brattleboro,_-Vermont ;05301;

Gentlemen:

i

Subjecti Inspection _No. 50-271/90-05

This letter refers _to the routine safety inspection conducted by Mr. Leonard-

.!

Cheung of' this office on May 29'to June 1,1990 at the Vermont Yankee Nuclear

Power Station. During_this inspection, we reviewed activities authorized by

3

NRC License No. DRP-28.

Mr. Cheung discussed the finding of'the inspection

l

. with Mr. D. Reid of your. staff at the conclusion of the inspection'.

In addi-

-

l

-

. tion, Mr. Cheung discussed these issues with Mr. Wanczyk of your staff in a

i

' subsequent ' telephone _ discussion on June 20, 1990.

i

I

,

Areas examined-during_this inspection included your corrective actions associated--

'v

with the deficiencies identified during previous equipment qualification'

inspections and a maintenance' team inspection. These activities are described

4

'

_ in the NRC Regioc-.I Inspection Report which is enclosed with-this letter. -Within

'

these areas, the u spection consisted of selective examinations-of procedures-

a

and. representative . ecords, _ interviews with personnel, and observations by the

!

._i n spec tor.-

-

+

1Your corrective actions for one violation and four unresolvediitems were. found

.to_be acceptable and the issues are closed,

-

i

No~ reply _to this letter is required.

Your cooperation with us on this subject

<

is~ appreciated.

',

!

Sincerely,

' Ort.;inal Simaa ny

Jacque P,D ur

'I

Jacque P. Durr, Chief

Engineering Branch

,

Division of Reacto Safety

-

Enclosure:

NRC Region I Inspection Report No. 50-271/90-05

OFFICIAL RECORD COPY

IR VY 90-05 - 0001.0.0

..

9007170450 900703

07/03/90

\\\\

-

PDR

ADOCK 05000271

)

'

,O

PDC

y.9l

l

,

L

n

- - -

-

-

. t.

p

'

'JUL 0 3 - 1990

-

.

V'ermont Yankee' Nuclear Power Corporation

2

'

'

> . '

.

i

cc w/ enc 1: .

!

J. Weigand, President and Chief Executive Officer

J.-Pelletier, Vice President Engineering

'

O. Reid; Plant-Manager-

.

J...DeVincentis, Vice President, Yankee Atomic Electric Compar.y

e

'L. Tremblay, Licensing Engineer, Yankee Atomic Electric Company

.;

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

'

Vermont Yankee Hearing Service List

Public Document Room.(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector _(w/SGI)

'

i

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

bec w/ encl:

'

Region I. Docket Room (with concurrences)

-Management Assistant, DRMA (w/o enc 1)

R. Bellamy, DRSS!

<

'J. Johnson, DRP'

J. Rogge, DRP

.

,.

-H.- Eichenholz, SRI - Vermont Yankee

.

T. Koshy, SRI - Yankee Rowe

'

M.. Conner, SALP Reports Only

K. Abraham, PA0 (20) SALP. Report and (2) All Inspection Reports

J. Caldwell,'EDO

-

M. Fairtile, NRR

S. Chaudhary, DRS

.

t

lQ

&

&

RI:DR b

RI:DRS

RI:DRS

Cheung/geb/rw

Anderson

Durr

06M/90

06/;4/90

Og/.3 /90

0FFICIAL RECORD COPY

IR VY 90-05 - 0002.0.0

06/25/90

(

.