Confirmatory Action Ltr CAL-RIII-90-11 Re NRC Diagnostic Team Findings & Followup on motor-operated Valves & Switch Settings
ML20044A491
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/22/1990
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
CAL-RIII-90-11, NUDOCS 9006290118
Download: ML20044A491 (3)


Text

,

o 33N 2 2 Un CONflRMATORY ACTION LETTER Docket No. 50-295 CAL Rill-90-011 Docket No. 50-304 Connonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice president post Office Box 767 Chicago, IL 60690 Gentlemen:

This confirms the telephone communication between H. J. Miller of this office and W. Kurth of your organization on June 22, 1990, related to the NRC Diagnostic Team findings and subsequent Region 111 follow up on motor operated valves (MOVs) and their related t, witch settings at the Zion Nuclear Station. With regard to these issues, we understand that you will:

a.

For Unit 1, which is operating, confirm that all of the MOVs discussed in NRC IE Bulletin (IEB) 85-03 are operable or follow the appropriate Technical Specification action staternent requirements, b.

For the operability determination-of item a. above, base any conclusion which uses torque switch settings to determine operability c,n settings which have been physically verified in the plant or provide justification as to why this is not necessary.

c.

For MOVs whose operability determination is based on a plant or equipment operating configuration provide controls (procedure, standing order, etc.) which will ensure that the configuration will not be inadvertently disturbed.

d, for the shutdown unit, Unit 2, confirm that all the IEB 85-03 MOVs have their torque switch settings verified correct prior to returning Unit 2 to service (before entering Mode 2).

e.

perform a re-evaluation of Commonwealth Edison's IEB 85-03 Submittal for Zion Station to determine if any retesting or. resubmittal is necessary.

We understand that for items a-c, you will complete the actions and document the results by Tuesday, June 26, 1990, in a letter to Region 111 containing a listing of each valve, a brief description of its function, and its operability determination.

We further understand that by July 6',1990 you will also provide expected completion dates for items d. and e., and your program and schedule addressing potential discrepancies with all other safety-related EVs at Zion.

CONflRMATORY ACTION LETTER f0[ $$0bb b

,[

P W d6:

n.

CONFIRMATORY ACTION LETTER 22 Comonwealth Edisun Company

!. 2 1ssuance of-this Confirmatory Action Letter does not preclude the issuance of an order requiring implementation of the above comitments.

None of the actions specified herein-should~be' construed.to.take precedence over actions which you feel necessary to ensure-' plant and personnel safety.

Please advise us-imediately if your understanding' differs'from that set forth:-

above..

Sincerely,

. oriainul etened by ;

A4 DarL Dav20' A. Bert Davis'

~

Regione1' Administrator See Attached Distribution CONFIRMATORY ACTION LETTER I.

o CONFIRMATORY ACTION LETTER Commonwealth Edison Company 3

E N 2 E 1330 t

Distribution cc:

T. J. Maiman, Vice President, PWR Operations T. Kovach, Nuclear Licensing Manager T. Joyce, Station Manager DCD/DCD (RIDS)

Licensing Fee Management Branch Resident Inspector, Rll!

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Mayor, City of Zion Chandu Patel, Project Manager, NRR Robert Newmann, Office of Public Counsel, State of Illinois Center J. M. Taylor, EDO J. Sneizak, OEDO H.

L.,

Thompson, OED0 J. W. Clifford, OED0 J. Lieberman, OE J. R. Goldberg, 0GC 4

J. G. Portlow, NRR l

Cf6 qq R 11 Rlli R111 bi 1 e acobsen/Danielson/cg Ring St ar er 6/3/90 6/7 7/90 6/,, t/90 6'/$2/90 I)6/

90 N,s.e4% 3.f

\\i Gkelnb g, Zwolinski$de* Paperiello Day 6/ V90 6/ W 90 #

4 K6/4/90 6/y4/9 CONFIRMATORY ACTION LETTER

.