E0! shall complete the following requirements on the schedule noted below:
Emergency Response Facilities (Generic (e_tter 82-33. NbREG-0737 Sucplement 1. 55ER #5 E01 shall implement the specif c items below, in the manner described in i
MP&L letter (AECH-83/0232) diteo April 15 1983, as modifiec in MP&t. letter (AECM-83/0486) dated August 12, 1983, nolaterthanthefollowing specified dates:
(a) Safety Parameter Disphy System (SPDS)
(1) Submit a safety antlysis and implemertation July 1985 plan to the hRC (2) SPOS fully operationa' and operator trained Prior to startup j
following firsi refueling outage.
- 3) DetaileoControlRoomDesignReview(DCRDR)
(1) Submit a program plan to the NRC December 1Q84 (2) Submit a summary report to the NRC including July 1986 a proposed schedule for implementation (c) Regulatory Guice'1.97 - Application to Emergency Response Facilities (l') Submit a report to the NRC describing how the February 1985 requirements of Supplement I to NUREG-0737 have been or will be met.
(2) Implement (Installation or upgrade)
Prior to startup requirements of R.G. 1.97 with exception following first of flux monitoring and coolant level monitoring, refueling outage.
(3) Implement (installationorupgrade)
Prior to startup requirements of R.G. 1.97 for coolant level following secono monitoring.
refueling outage.
(4) Implement'(installation or upgrade)
Prior to startup requirements of R.G. 1.97 for flux monitoring.
fo110winC-5?tp l'
refuelin outage, (d) Upgrade Emergency Operating Procedures (EOP's)
(1) Submit a Procedures Generation Package to the April 1985 NRC.
Ig Amendment No. 65
(