Advises That Due to Heavy Workload Associated W/Facility Separate Meeting Minutes for Pilgrim Restart Assessment Panel Have Not Been Issued Since Aug 1989
ML20044A237
Person / Time
Site: Pilgrim
Issue date: 02/14/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20044A235 List:
References
FOIA-90-147 NUDOCS 9006280246
Download: ML20044A237 (5)


Text

_

g\\

UNITED STAfte NUCLEAR REOULATORY COMMISSON neosoN 1 k'se**

aF4 ALLENDALE ROAD KING OF PRUcetA. PENNeYLVANIA 1 Hee

)

FEB 141990

)

MEMDRANDUM FOR:

William F. Kane, Director i

Division of Reactor Projects THRU:

Jon R. Johnson, Chief Projects Branch No. 3 FROM:

A. Randolph Blough, Chief Reactor Projects Section 3A

$UBJEC1:

PILGRIM RESTART A$$E55 MENT PANEL MEETING MINUTES Due to the heavy workload associated with Pilgrim $tation, a separate set of meeting minutes for each Ptigrim Restart Assessment Panel meeting since August 1989 has not been issued.

The primary results of panel activities have been reflected in NRC holdpoint documents.

Restart Assessment Panel meetings have been held since August 1989 to review and assess licensee progress during the Power Ascension Program.

, provides a summary of Restart Asst'ssment Panei meetings held since August. Enclosure 2 is a standard panel agenda used at most meetings.

En-closure 3 is an updated milestone Itsting.

(

A. Randolph B ugh, Chief Reactor Projects Section 3A

Enclosures:

As Stated cc w/encis:

W. Kane, DRP l

J. Wiggins, DRP B. Boger, NRR J. Durr, DR$

R. Bellamy, DR$$

R. Wessman, NRR J. Johnson, DRP T. Hiltz, DRP C. Carpenter, RI - Pilgria J.-Macdonald, $RI - Pilgrim T. Cerne, RI - Pilgrim 9go62fgg6900524 FLEMING 90-147 PDR l

blr2

l ENCLOSURE 1 i

RESTART ASSES $ MENT PANEL MEETINGS $1NCE AUGUST 1.1990 l

1.

August 7, 1989 Review by Resta t Assessment Panel of August 2, Teleconference 1989 Condensate Pump Overpressurization 1; vent.

2.

August 10, 1989 Presentation by Itcensee to the NRC $taff and Teleconference Restart Assessment Panel members on the results l

of licensee review of the condensate pump suction strainer box and expansion joint deformation; licensee again requested NRC agreement to proceed.

)

I 3.

August 14, 1989 Restart Assessment Panel teleconference to review Teleconference August 2 overpressurization event and NRC Restart Staff followup inspection results.

4.

August 28, 1989 Restart Assessment Panel briefed by Itcensee on Teleconference their plans for the remainder of the 75% plateau and remainder of Power Ascension Program.

5.

September 18, 1989 Licensee presented results of the Power Ascension l

Region !

Prograra at the 50% to 75% power plateau to the l

NRC Pilgrim Restart Assessment Panel and requested approval to proceed from Power Ascension Program Approval Point No. 5.

6.

October 6, 1989

. Restart Assessment Panel discussion of Power i

Plymouth Sheraton, MA Ascension Test Program status and projected in-spection and review activities.

7.

Ncvember 22, 1989 The Restart Staff briefed and the Restart Assess-Teleconference ment Panel on the status of the Power Ascension Program and the Itcensee's performance.

8.

January 4,1990 Received presentation from licensee on their Chiltonville, MA assessment of the Power Ascension Program.

The Restart Assessment Panel also reviewed licensee performance during the 75% to 2005 power plateau.

I l

l

~._

' i.

l l

1 ENCLOSURE 2 AGENDA ITEMS ITEM RESPONSIBILITY 1.

Plant Status and Schedules SRI 2.

Staffing / Organization Update SRI l

3.

Site Inspection Activities Update SRI 4.

Licensing Status Wessman i

5.

Allegation Status Blough

\\

6.

External Correspondence Status Wessman/Blough l

7.

Update on Emergency Planning status Bellamy 8.

Power Ascension Program - Restart Inspection Program Bellamy Staffing Status SRI t

Power Ascension Program Status SRI J

l Commonwealth Involvement SRI 9.

Licensee Performance Overview SRl/81ough f

10. BEco Presentations (at approval points)

BEco Plant Emergency Preparedness l

11. Panel Discussions / Review of BEco Presentation Pans.)
12. Update Overall Milestone Schedule Chairman /Blough j

l 13.

State Liaison Status Miller

)

i I

3 i

I j

ENCLOSURE 3 PILGATlFMILESTONES r

Milestones Date Meeting with Town CD 01 rectors.................................. 11/7/88 Staf f Review Thi rd Ba rry Pa rty.............................

11/30/88 i

second Commission Meeting..................................

Commission Assent.............................................. 12/9/88

... 12/21/88 Licensee Final Mode Chan

2. 206 Re spon se.......... ge Re v1 ews.............................. 12/30/88

........................................ 12/29/88 EP Exercise Exemption Res NRC R/S Staff In-P1 ace...ponse................................... 12/29/88 12/27/88 Update CAL.............................

........................ 12/30/88 Approval Point #1 Deliberations................................. 12/30/88

$/U a nd 0 5% Te s ti ng Compl e tion................................. 2/16/89 BEco Mana ement Assessment...................................... 2/16/89 Approval oint #2 Deliberations......................

RAP Recommendation............................................. 2/17/89 4

l EDO Pa pe r I s s ued................................................ 2/17/89

.......... 2/27/89 Commission Consideration Complete............................... 3/3/89 Rel ea se Le tte r to 8E00.......................................... 3/3/89 local Official Briefin T e s t i n g 5 -2 5%......... g......................................... 3 76/89

.......................................... 4/3/89 Approval Point #3 Deliberation s................................. 4/3/89-6/15/81

. EP Status to Plymouth (5 Day Wa1t).............................. 4/3/89-6/7/89

{

RAP Recommendation................................

E DO P a pe r I s s ue d............................................... 6/15/89

............. 6/21/89 l

Commission Consideration Complete............................... 6/26/89 Release Letter to BEco.......................................... 6/26/89 Local Official Briefing......................................... 6/26/89

$/0 from Outside C/R Test........................................6/29-30/89 i

Te sting to 50% ( Except Routine LPRMs)........................... 7/7/89 BECo Mana ement Assessment.....................................

Approval Ijoint #4 Deliberations................................

7/24/89

.7/19-24 & 8/2-14/89 i

RAP Recommendation................................

EDO Pa pe r 1 s s ued................................................ 7/2 7 - 8/14/89

.............. 8/16/89 Cosamission Consideration Complete............................... 8/18/89 Release letter to BECo.......................................... 8/18/89 Loca l Of f i c i a l Br i e fi ng......................................... 8/18/89 Testing to 75%.................................................. 8/24/89 ApprovalIgoint#5 Deliberations.................................9/18/89BEco Mana ement Assessment...................................... 9/17/89 RAP Recommendation.................................

EDO Pa pe r 1 s s ued................................................ 9/18/89

............ 10/5/89 Commission Consideration Complete............................... 10/6/89 Release Letter to BECo.......................................... 10/6/89 Local Official Briefing............................

Testing to Full Power..............................

............ 10/6/89 i

............ 12/14/69 BECo Management Assessment....................................... 12/14/89 l

. - ~

1 i

s I

2 Milestones Date BEco Report to NRC......................................

12/14/89 NRC Evaluation..........................................

............... 1/4/90 Possible Management Meeting..................................... 1/4/90 Con s i de r CAL C1 o secut........................................... 2/12/90 Local Official Briefing.....................................

Media Briefing................................................. 2/14/90

....(PressRelease)

Restore to Normal NRC Organization.............................. 2/12/90 i