Submits Pilgrim Status Rept for 891209-900105
ML20044A236
Person / Time
Site: Pilgrim
Issue date: 01/10/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20044A235 List:
References
FOIA-90-147 NUDOCS 9006280245
Download: ML20044A236 (4)


Text

..-.m.......

=f

[

,.A -

y s

4, s

JAN 101990

-l Docket No. 50-293 MEMORANDUM FOR:

Jon R. Johnson, Chief, Projects Branch No. 3, Division of' Reactor Projects

-FROM:

A. Randy Blough, Chief, Reactor Projects Section No. 3A, Division of Reactor Projects

SUBJECT:

PILGRIM STATUS REPORT FOR THE PERIOD DECEMBER 9, 1989 -

JANUARY 5, 1990 i

Enclosed is the Pilgrim status report from the NRC Resident Office at Pilgrim, i

The NRC Restart Staff is in place and was on-site monitoring licensee activi-i' ties on an extended shift basis during-the report period.

This report was extended several days to encompass the NRC Restart' Assessment j

Panel Meeting on January 4,1990. The next status report period will close about February 2,;1990, i

The Pilgrim status report is intended to provide NRC management and the public with an overview of plant activities and NRC restart inspection activities.

Subsequent inspection reports will address many of these topics in more detail, N

ORIGINAL SIGNED By z:

A. Randy Blough, Chief a

Reactor Projects Section 3A.

Division of Reactor Projects

Enclosure:

As stated 9006280245 900524 FOIA PDR PDR FLEMING 90-147 h/

AngeLJ4 eialueen4h_

- * ~ ~ * = ~

l 't[<

\\.

Jon R. Johnson 2

N384 cc w/ enc 1:

R. Bird, Senior Vice President - Nuclear L. Gustin, Vice President - Corporate Relations K. Highfill, Vice President - Nuclear Operations R. Anderson, Plant Manager J. Dietrich, Licensing Division Manager E. Robinson, Nuclear Information Manager B. Fairbanks, Nuclear Engineering Department Manager The Honorable Edward M. Kennedy The Honorable John F. Kerry The Honorable Edward J. Markey The Honorable Edward P. Kirby The Honorable Peter V. Forman Chairman, Board of Selectmen, Plymouth Chairman, Board of Selectmen, Carver Chairman, Board of Selectmen, Ouxbury Chairman, Board of Selectm'.rn, Marshfield Chairman, Board of Selectmen, Kingston Cht,1rman, Board of Sel'ectmen, Bridgewater

. Mayor, City of Taunton Piymouth Civil Defanse Directer M. Ernst, Committee on Energy, Commonwealth of Massachusetts B. McIntyro, Chairman, Department of Public Utilities N. Johnson, Chairman, Duxbury Nuclear Committee R. Shimshak, MASSPIRG R. Boulay, Director, Massachusetts Civil Defense Agency and Office of Emergency Preparedness M. Jeka, Legislative Assistant K. Anderson, legislative Assistant S. Woodhouse, Legislative Assistant Ouxbury CURE Public Document Room (POR) local Public Document Room (LPOR) p Nuclear Safety Information Center (NSIC)

NRC Resident Inspector CommonwealthofMassachusetts(2) l I

l4j z.

(

li ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD DECEMBER 9.1989 - JANUARY 5.1990 1.0 Plant Status As of 8:00 a.m. on January 5, 1990, the reactor was operating at full power with the turbine generator synchronized to the grid, 2.0 Facility _ Operations Summary At the end of the last report period, the plant was in stable hot shutdown condition following the automatic reactor scram on December 8, 1989 due to a false low reactor water level signal.

the licensee brou9 t the reactor criti-h At 5:26 a.m. on Occember 11, 1989, cal following licensee review of the reactor scram and further testing on the "A" recirculation motor generator set.

The turbine-generator was synchronized to the electrical power distribution grid at 3:15 p.m. on December 12, 1989, and operaicd at about 95% of rated power.

Thc plant reached full power on January 2,1990.

Reactor power had been limited to less thar. full power dus to a limiting control rod pattern, which pre-vented the licensee from reaching 100% of rated power until the control rod pattern could be adjusted.

~

At the close of this report period, the reactor was operating at full power.

3.0 Items of Special Interest NRC Restart Assessment Panel An NRC Restart Assessment Panel meeting was held on January 4,1990 at the I

Chiltonville Training Center, in Plymouth, Massachusetts. NRC management from Region I, the Of fice of Nuclear Reactor Regulation (NRR), and the NRC resident staff participated. The meeting was open for public observation.

The Panel received a presentation from the licensee on their final self-assessment of the Power Ascension Program.

The Panel also reviewed licen-see performance during the 75% to 100% power plateau. The Panel meets ptriodically to coordinate planning and execution of NRC inspection and licensing activities related to Pilgrim.

The Panel is chaired by Mr. William F. Kane, Director, Division of Reactor Projects, NRC Region I, 4.0 Emergency Notification System (ENS) Reports Isolation of Shutdown Coolina and P'mp Trip u

On December 9, 1989, the licensee experienced an isolation of the Residual Heat Removal System (RHRS) Shutdown Cooling Suction Valves. The action of these two valves going off their full open position activated a trip of the RHR pump. The shutdown cooling mode of the RHR$ is used during normal reactor shutdown and cooldown to remove decay heat within the reactor core.

1 I

w= -.

.O o

  • 0, o

.i.

C Enclosure 2

The Itcensee determined that the isolation of the shutdown cooling suction valves was due to a minor hydrodynamic event actuating the "high pressure (100 psig) interlock for shutdown cooling. This high pressure interlock protects the low pressure RHRS pump. No plant heatup occurred and this event was of minor safety significance.

Tht: RHR system actuation was reported to the NRC via ENS.

Review of this event will be detailed in Inspection Report 50-293/89-13.

Contrary to some press accounts, this event did not involve a reactor scram signal.

5.0 ti,1.grimRestartSta_ffActivities The Pilgrim Restart Staff was in extended shift coverage throughout this report period.

An NRC-developed inspection plan addressing the 100% power plateau, as well as the primary functional areas of operations, maintenance, surveillance, and startup testing was implemented. The inspectors assessed operator performance, organisational interfaces, adherence to procedures, and Tech-nical Specification compliance.

The Pilgrim Restart Staff continued to evaluate the performance of licen-see personnel and the plant.

Contact with the press and public continued throughout the period.

The NRC Restart Manager and Public Affairs Officers from both Region I and Headquarters have been handling inquiries.

Pilgrim Restart Staf f Com,nposition _During Period The Pilgrim kestart Staff on-site was comprised of the following personnel during the period.

C. Carpenter, Resident inspector A. Cerne, Resident Inspector T. Kim, Resident Inspector J. Macdonald, Resident Inspector, Vermont Yankee M. Markley, Resident Inspector, Yankee Rowe T. Hiltz, Reactor Engineer G. Bryan, NRC Contractor F. McManus, NRC Centractor 1

On December 20-21, 1989 and on January 3 and 5,1990, Mr. A. Randy Blough, Chief, Reactor Projects Section No. 3A was on site. On January 3,1990, Dr. Ronald R. Bellamy, Chief Facilities Radiological Safety and Safe-guards Branch was onsite.

On December 31, 1989, Mr. Antone Cerne assumed the position of Resident Inspector at Pilgrim, replacing Mr. Tae Kim, who has assumed the position of Resident Inspector at the Calvert Cliffs Nuclear Power Plant.