Forwards Safety Evaluation for PECO-FMS-0006, Methods for Performing BWR Reload Safety Evaluations. Topical Rept, Methodology & Util Use of Methodology Acceptable
ML20044A084
Person / Time
Site: Peach Bottom  
Issue date: 06/15/1990
From: Suh G
Office of Nuclear Reactor Regulation
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20044A085 List:
References
TAC-73602, TAC-73603, NUDOCS 9006280049
Download: ML20044A084 (2)


Text

-

)

i June 15, 1990 DISTRIBUTION: w Docket Nos. 50-277 CDocket111efg/ enclosure and 50-278 NRC PDR M0'Brien EJordan i

Mr. George A. Hunger, Jr.

Local PDR ACRS(10)

Director-Licensing, MC 52A-5 PDI-2 Rdg OGC Philadelphia Electric Company SVarga i

Nuclear Group Headquarters BBoger Correspondence Control Desk WButler l

P. O. Box No. 195 Llois Wayne, PA 19087-0195 GSuh RClark

Dear Mr. Hunger:

SUBJECT:

SAFETY EVALVATION FOR TOPICAL RETORT PECO-FMS 0006. " METHODS FOR PERFORMING BWR RELOAD SAFETY EVALUATIONS" (TACNOS. 73602/73603)

RE:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 The NRC staff has completed its review of Philadelphia Electric Company's topical report PECo-FMS-0006, Methods for Perfonning BWR Reload Safety Evaluations." The topical report was submitted to the NRC by letter dated May 30,1989, and supplemented by responses to staff questions in a May 31,

)

1990 submittal.

Subject to the conditions discussed in the enclosed evaluation, the staff concludes that,the topical report, the methodology and PEco use of the methodology are acceptable.

Sincerely,

/S/

Gene Y. Suh, Project Manager Project Directorate I 2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Enclosures As stated cc w/ enclosure:

See.next page f

PDI-2/PM PDI-2/D GSuh:gs Mf @jh/g/90 WButler f,/15790 q/

k[0i

g7g62eo049,no,so m 1(

33

=oce oso g

PDC

i O

Nr. George A. Hunger, Jr.

Peach Bottom Atomic Power Station, Philadelphia Electric Compary Units 2 and 3 cc:

Troy B. Conner, Jr., Esq.

Single Point of Contact 1747 Penrty1vania Avenue. N.W.

P. O. Box 118B0 Washington, D.C.

20006 Harrisburg, Pennsylvania 1710B-18B0 Philadelphia Electric Company Mr. Thomas M. Gerusky, Director ATTil: Pr. D. B. Miller, Vice President Bureau of Radiation Protection Peach Bottom Atomic Power Station Pennsylvania Department of Route 1. Box 208 Environmental Resources Delta, Pennsylv' 4a 1

'4 P. O. Box 2063 t

Harrisburg, Pennsylvania 17120 Philadelphia E16 's Company ATTN: Regulator) T,lineer, Al-25 Pr. Albert R. Steel, Chairman Peach Bottom Atomic Power Station Board of Supervisors Route 1. Box 208 Peach Bottom Township Delta, Pennsylvania 17314 R. D. #1 Delta, Pennsylvania 17314

-Resident inspector U.S. Nuclear Regulatory Comission Public Service Comission of Maryland Peach Pottom Atomic Power Station Engineering Division P.O. Cox 399 ATTil: Chief Engineer Delta, Pennsylvania 17314 231 E. Baltimore Street Baltimore, MD 21202-3486 Pegional Administrator, Region i U.S. Nuclear P,epulatory Comission Pr. Tom Magette 475 Allendale Road Power Plant Research Program King of Prussia, Pennsylvania 19406 Department of Natural Resources B-3 Mr. Roland Fletcher Tawes State Office Building Department of Environment Annapolis, Maryland 21401 201 llest Presten Street Baltimore, Maryland 21201 f'

-_ _