Confirms Dates of 900625-29 for Scheduled Reg Guide 1.97 Insp.Requests That Listed Documents Be Provided During Insp
ML20044A046
Person / Time
Site: FitzPatrick 
Issue date: 06/18/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9006270340
Download: ML20044A046 (2)


Text

'

y.,.

x C

s JUN 181990 Docket No. 50,-333 New York Power Authority James A. FitzPatrick-Nuclear Power Plant ATTN: Mr. William Fernandez Resident Manager P., 0. Box 41 Lycoming, New York 13093 Gentlemen:

Subject:

Implementation of Regulatory Guide 1.97 for FitzPatrick (50-333)'

This lettek confirms the dates of June 25-29, 1990 for the Regulatory Guide 1.97 inspection at FitzPatrick. Our plans for this inspection were discussed-

. with your staff during a conference call between Mr. R. Liseno of your organization:and Mr. A. Della Greca of the NRC Region I office. 'The inspection will take place 'at the FitzPatrick site, Oswego, New York.

The management entrance meeting is scheduled for 2:00 p.m. on June 25, 1990.

The management exit meeting is tentatively scheduled for June 29, 1990, at 10:00 a.m.

For this inspection we request the following documents:

1~.

Calibration Records for Category 1, type A, B and C variables 2.

Loop Diagrams anct Schematics 3.

P& ids 4.

Power Source Diagrams 5.

Diagram of Control Room Panel (location of instruments) 6.

EQ Master List Legend of Symbols / Abbreviations Used Status of Standby Power g.

The above information should be made available at the inspection site on June 25, 1990.

fv We request one copy of the Category 1, type A, B & C variables for FitzPatrick be sent to the Region.I office one week prior to the inspectica.

Should you have any questions regarding the inspection, you may contact Mr. A. Della Greca (215-337-5046) or Mr. C. Anderson (215-337-5376).

Sincerely, br5 sinni 51snad By*

Jacquo P.Dur+r Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety 0FFICIAL RECORD COPY 50-333 RG 1.97 - 0001.0.0

'06/13/90 bD 0 33 O

PDC' lb'.()l

4%

.cg

,c a'

JUN 181990 1

New York Power Authority-2 4

'cc w/ enc 1:

+

J. Phillip Bayne, President J. Brons, Executive Vice President A. Klausmann, Senior Vice President - Appraisal and Compliance Services R. Patch, Quality Assurance Superintendent G. Wilverding, Manager Nuclear Safety Evaluation

.G. Goldstein, Assistant General Counsel R. Beedie, Vice President Nuclear Support S. Zulla, Vice President Nuclear Engineering R. Burns,.Vice-President Nuclear Operations J. Gray, Director Nuclear Licensing - BWR c

Dept. of Public Service, State of New York State of.New York, Department of Law Public Document Room (PDR)-

Local Public Document Room (LPDR)

Nuclear Safety Ir. formation Center (NSIC)

NRC ' Re sident-Insped or State of New York, Sc0 Designee bec w/ enc 1:

Region I Docket Room (with concurrences)

R..Bellamy,'DRSS J. Linville, DRP D. Limroth, DRP G. Meyer,'DRP M.' Conner, SALP Reports Only PA0 (17);SALP Reports Only D. LaBarge,.NRR J. Caldwell, NRR S. Newberry, NRR C D

^

j RI:DHS RI:DRS RI PRS Anderson Durr Horges 6/7/90 6/p[/90

/(/90 0FFICIAL RECORD COPY 50-333 RG 1.97 - 0002.0.0 06/06/90 3

.